9. Item WWW is produced in a transfer line. Determine daily output rate given the following processing times and unit transfer strategy between the machines.
Q: Suppose a work center has a setup plus run time of 30 minutes to make 50 parts. Also assume it takes…
A: We have, Produced parts = 50 units (1 container) Setup + Run time = 30 minutes Time to move between…
Q: What is meant by unit loading?
A: A load unit is a grouping of multiple items into a single unit. Shipments are easily transported or…
Q: a. What is the b. Given the data from above, and assuming a 300-day work year; how many orders…
A: Economic order quantity is the level of inventory that a firm should purchase in order to minimize…
Q: One product line at Spearman Fishing Industries has 13 turnsper year and an annual sales volume (at…
A: Inventory turnover measures the amount of goods sold over a period of time. It helps in adjusting…
Q: The manufacturing cycle efficiency for NUBD Company when the processing time is nine hours and…
A: Small Introduction about Manufacturing Cycle Efficiency The percentage of production time spent on…
Q: Product A is made from components B, C, and D. Item B is asubassembly that requires two units of C…
A: The following information is given: 1. Product A is made from components B, C, and D 2. Item B is a…
Q: Strategy C: Using overtime for up to 15 tank loads a month, along with inventory to handle…
A: Note that, As mentioned in the questions, we have answered Strategy C alone.
Q: Ordering of goods or materials in a way that they are delivered to the factory without storage ?
A: Inventory management is the process of ordering, storing, and using the inventory of a company. This…
Q: One unit of A is made of two units of B and one unit of C. B is made of three units of Dand one unit…
A: To Solve: 1. To prepare low-level-coded bill-of-materials (product structure tree). 2. Planned order…
Q: What are the advantages of FMS technology, compared to conventional batch operations?
A: A flexible manufacturing system is the production system that is used to adjust according to the…
Q: How does the Work-in-process inventory play an important role in manufacturing?
A: The inventory is considered to be crucial element of a company's present assets. These items allow…
Q: gregate production plan for Bioway using (a) chase demand and (b) a mixed strategy where the current…
A: Below is the solution:-
Q: 2. Your firm has implemented just-in-time replenishment. This is an operations decision in the area…
A: Inventory is the raw material that the organization keeps so that a smooth production process can be…
Q: The manufacturing cycle efficiency for NUBD Company when the processing time is seven hours and…
A: Throughput time is the total actual time incurred during the production of the product in an…
Q: Consolidate deliveries from multiple resources into full load ? a. Retail store b. Supply center…
A: Delivery is the act of taking something t the place or person who has ordered it or whose address is…
Q: What part does work-in-process inventory play in the production process?
A: Stock is seen as a critical component of a company's current assets. This products allow for a…
Q: Heather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule…
A: Product structure diagram: The product structure presents the material, segment parts…
Q: Define Assemble-to-order?
A: The process of production in a business or in any manufacture of products is to combine the various…
Q: T F Work-in-process inventories are raw materialsand supplies waiting to be processed.
A: TRUE, Work-In-progress inventories are the goods that have just started with the production process…
Q: .2. Most grocery stores use inventory management software, which manages stock lists in real-time.…
A: Here we examine about the ERP functionalities of a stock administration framework and likewise…
Q: What kind of items can be recycled by the Material Recovery Facility (MRF)? What is the purpose of a…
A: A materials recovery facility (MRF) is a critical part of private and business single-stream reusing…
Q: When discussing JIT in services, the text notes that suppliers,layout, inventory, and scheduling are…
A: As case study was provided earlier so the answer is as follows: When discussing JIT in services, the…
Q: hing, and there are at most 12 hours available fo of assembly and 2 hours of finishing, while a prer…
A: Our variables are up to us.The daily average number of devices created is x.and y=The daily…
Q: Determine the gross quantities needed of each item if you are to assemble 75 brackets compute…
A: no. of base required for 1 bracket = 1no. of base required for 75 brackets = 75
Q: Explain the concept of Demand Smoothing as part of the level scheduling in manufacturing?
A: Demand Smoothing is a Level scheduling concept, and its advantages are as follows: • End to End…
Q: Based on the below shipments details: what is the number of LD7 required to move this consolidation…
A: Given data is Number of sports hats = 88 Skid length = 110 cm Skid Width = 105 cm Skid height = 125…
Q: Demand planning is an activity to determine what quantity of materials and resources have to be…
A: Demand planning is an activity to determine what quantity of materials and resources have to be…
Q: A visual aid used in loading and scheduling jobs is a: O bottleneck. O load-schedule matrix. O…
A: A visual aid used in loading and scheduling jobs is a Gantt chart.
Q: Explain How do bottlenecks affect manufacturing plant work-in-process inventory
A: A bottleneck in the production stage is a juncture of traffic delays or interruptions in the product…
Q: Product A is made from components B and C. Item B, inturn, is made from D and E. Item C also is an…
A: BOM path Total lead time= sum of all lead times in a path ABD 7 ABEH 15 ABEG 14 ACF 9 ACH…
Q: Balance the assembly line using Ranked Positional Weight method using the data in Table 2 and…
A: Activity A and B do not have any predecessor, which means these activities can be start immediately.…
Q: what Type of manufacturing systems below, why and how many are there? M M L M M M Cell 2 D Cell 1…
A: Not all manufacturing systems are an equivalent , and different companies may use differing types of…
Q: XYZ Production has completed the following analysis of the 9 products it makes: Product…
A: Below is the solution:-
Q: You have developed the following simple product structure of items needed for your gift bag for a…
A: Given- Product structure tree-
Q: Order placement via the Internet does NOT include: - increasing the accuracy of the order. - use…
A: Order satisfaction means fulfilling a business order to the client's particulars. That is, conveying…
Q: For a particular item, the direct labor cost is $8 per item, and the direct labor content is $7.20…
A: The question is related to Direct labor utilization rate. it is calculated as under Direct labor…
Q: how he can achieve this targeted production without spending any extra money on the production…
A: Production capacity indicating the ability of a business for producing a specific products using…
Q: . Using the accompanying diagram, do the following: a. Draw a tree diagram for the scissors. b.…
A: given,
Q: Explain the batch flow and continuous flow process in manufacturing as shown
A: Below is the solution:-
Q: What is the process used to ensure that all of the needs for a particular item are calculated at the…
A: Master Production Schedule (MPS) is the process, which helps to make sure that all of the needs for…
Q: What is the difference between leveling based on capacity and leveling based on material flow?
A: Leveling based on capacity and leveling based on material flow, both are the terms of Inventory…
Q: Each A (finished good) requires 1 of component B and 2 of component C. Each B requires 2 of part D…
A: Given information, A = 1B + 2C B = 2D + 1E C = 1D + 1F
Q: What is the main objective of assembly line balancing.
A: Value-based planning integrates the impact of strategies have on shareholder value into strategic…
Q: Why does inventory flow so quickly through a Fri to-Lay plant?
A: Inventory refers to all the items held by a business in the form of raw materials or final goods,…
Q: ABC, Inc., produces a line of touring bicycles. Specifically, what are the four typesof inventories…
A: The store inventory is needed by every organization for the production of goods and services used…
Q: What knowledge is required to create a production schedule for made-to-order items? What makes this…
A: A development schedule is a method for organising and allocating resources for a project. It…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Production data show 35,920 units were transferred out of a stage of production and 6,150 units remained in ending WIP inventory that was 100% complete to material and 35% complete to conversion. The unit material cost is $5 for material and $8 for conversion. What is the amount of inventory transferred out and remaining in ending work in process inventory? Round to the whole unit and whole dollar, no decimals. Complete the tables below: Equivalent units data Units Materials Conversion Transferred out 35,920 Ending inventory 6,150 Units accounted for, equivalent units Cost data Transferred out $ Ending work in process: materials Ending work in process: conversion Ending work in process: total Costs to account for $ please fill in the blank boxesProduction data show 35,920 units were transferred out of a stage of production and 6,150 units remained in ending WIP inventory that was 100% complete to material and 35% complete to conversion. The unit material cost is $5 for material and $8 for conversion. What is the amount of inventory transferred out and remaining in ending work in process inventory? Round to the whole unit and whole dollar, no decimals. Complete the tables below: Equivalent units data Units Materials Conversion Transferred out 35,920 Ending inventory 6,150 Units accounted for, equivalent units Cost data Transferred out $ Ending work in process: materials Ending work in process: conversion Ending work in process: total Costs to account for $ please fill in the information in the grid exactly as providedParent S requires three of component T and two of component U. Both T and Uare run on work center 30. Setup time for T is 7 hours, and run time is 0.1 hour perpiece. For component U, setup time is 8 hours, and run time is 0.2 hour per piece. Ifthe rated capacity of the work center is 120 hours, how many Ts and Us should beproduced in a week?
- XYZ Production has completed the following analysis of the 9 products it makes: Product A B C D E F G H I TOTAL Daily Sales Forecast 400 250 200 150 150 150 150 75 75 1600 XYZ has an assembly line that can produce 200 units per hour and works eight hours per day: Prepare a detail daily (eight hour by hour) batch level schedule for XYZ, assuming a container size of 50 for each product.Oh No!, Inc., sells three models of radar detector units. It buys the three basic models (E, F, and G)from a Japanese manufacturer and adds one, two, or four lights (component DLead times are one week for all items except C, which is two weeks. There are ample suppliesof the basic units (E, F, and G) on hand. There are also 10 units of B, 10 units of C, and 25 units ofD on hand. Lot-sizing rules are lot-for-lot ordering for all items except D, which must be ordered inmultiples of 100 units. There is a scheduled receipt of 100 units of D in week 1.The master schedule calls for 40 units of A in week 4, 60 units of B in week 5, and 30 units of Cin week 6. Prepare a material requirements plan for D and its parents) to further differentiate the models. D is bought from a domestic producer.Upton Enterprises produces a variety of switches. Below, you will find a bill-of-material file for their simplest switch: Part A. The number in the parentheses represents the number of units required for the upper level. LT stands for the lead time, measured in weeks.Assuming that Upton Enterprises has none of Switch A in inventory, and the inventory levels of Parts B, C, D, E, and F are also zero, how many weeks would it take to produce 100 units of Switch A? What would be the total requirement for part E?
- Product A is made from components B, C, and D. Item B is asubassembly that requires two units of C and one unit of E.Item D also is an intermediate item, made from two unitsof F. All other usage quantities are two. Draw the BOM forproduct A.The bill of materials shows all the parts required to make Select one: a work-in process inventory b. the MPR c.raw materials inventory d.one itemXYZ is famous for homemade pizzas which are crisp with thin crust and varied toppings giving the pizzas fabulous tastes. XYZ· is revamping its order processing and pizza-making process. In order to deliver fresh pizza fast, six work elements must be completed as shown in the table below :Element Description Precedence Time (in min)A Receive order - 2·0B Shape dough A 1·0C Prepare toppings A 2·0D Assemble pizza B, C 3·0E Bake pizza D 3·0F Deliver pizza E 3·0Construct a precedence diagram for the process.If the demand is 120 pizzas per night (5:00pm to 1:00am), compute the cycle time for the process. Compute the lead time for the process.What is the theoretical minimum number of workstations needed to achieve the required production?How will you balance the production line to produce and deliver 120 pizzas per night? What is the actual minimum number of workstations needed?
- Each A (finished good) requires 1 of component B and 2 of component C. Each B requires 2 of part D and 1 of part E; and each C requires 1 of part D and 1 of part F. If the demand for product A is 30 units, and there are 10 units of B on hand and none of C, how many units of part D will be needed?Which is these if the critical phase in the ERP implementation O a. Selection of vender O b. Integration of Data Model Oc. Understand the business requirement O d. User TrainingA process makes two products, A and B, and operates 5 days per week, 8 hoursper day. Demand for the two products for the next week is as follows:Day 1: A: 4; B: 6Day 2: A: 5; B: 5Day 3: A: 6; B: 4Day 4: A: 7; B: 3Day 5: A: 3; B: 7What is the takt time of the process? What would a level production schedule look like?