A 700 kW, 60 Hz generator A, with 2.0% speed regulation, is operating in parallel with generator B of equal kW rating, but whose speed regulation is 6.0%. The total bus load of 1000 kVA at 60 Hz, 2400 V, and 80% power factor lagging is divided equally between the two machines. If a 200-kW load is disconnected from the bus, determine the new operating frequency and the active power load on each machine.
A 700 kW, 60 Hz generator A, with 2.0% speed regulation, is operating in parallel with generator B of equal kW rating, but whose speed regulation is 6.0%. The total bus load of 1000 kVA at 60 Hz, 2400 V, and 80% power factor lagging is divided equally between the two machines. If a 200-kW load is disconnected from the bus, determine the new operating frequency and the active power load on each machine.
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter12: Power System Controls
Section: Chapter Questions
Problem 12.5P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning