“A car manufacturer produces two versions of its popular medium sized model: a  hatchback aimed at the family market and a coupe designed to appeal to affluent  single customers. Both are based on the same chassis and differ only in the body kit used to make  up the cars. They are both produced at the same factory. There are 95,000 hours of manpower and 8,900 basic chassis units (one per  vehicle) available each week. The hatchback takes 4 hours of assembly time  while a coupe takes 6.5 hours. At least 1,000 coupe models should be produced per week. Production is also constrained by the fact that owing to problems with a supplier  only 34,000 door handles are available per week. A hatchback uses 10 of these  handles while a coupe uses 4. The profit to the factory on a hatchback model is estimated to be £3,450 while the  profit on a coupe is £975. The market demand for the cars is high. It is known that demand will exceed  production for time to come so they should be able to sell whatever mix of cars is  produced. The car manufacturer wants to maximise its profits, but doesn’t know what  combination of versions of its medium-sized model to produce.”  GRAPH THE CONTRAINTS

Algebra & Trigonometry with Analytic Geometry
13th Edition
ISBN:9781133382119
Author:Swokowski
Publisher:Swokowski
Chapter9: Systems Of Equations And Inequalities
Section: Chapter Questions
Problem 8T
icon
Related questions
Question

“A car manufacturer produces two versions of its popular medium sized model: a  hatchback aimed at the family market and a coupe designed to appeal to affluent  single customers.
Both are based on the same chassis and differ only in the body kit used to make  up the cars. They are both produced at the same factory.
There are 95,000 hours of manpower and 8,900 basic chassis units (one per  vehicle) available each week. The hatchback takes 4 hours of assembly time  while a coupe takes 6.5 hours.
At least 1,000 coupe models should be produced per week.
Production is also constrained by the fact that owing to problems with a supplier  only 34,000 door handles are available per week. A hatchback uses 10 of these  handles while a coupe uses 4.
The profit to the factory on a hatchback model is estimated to be £3,450 while the  profit on a coupe is £975.
The market demand for the cars is high. It is known that demand will exceed  production for time to come so they should be able to sell whatever mix of cars is  produced.
The car manufacturer wants to maximise its profits, but doesn’t know what  combination of versions of its medium-sized model to produce.” 

GRAPH THE CONTRAINTS 

Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Recommended textbooks for you
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
College Algebra
College Algebra
Algebra
ISBN:
9781337282291
Author:
Ron Larson
Publisher:
Cengage Learning