A department has five employess with five jobs to be permormed. The time (in hours) each men will take to perform each job is given in the effectiveness matrix. Employees Jobs I II III IV V A 10 5 13 15 16 B 3 9 18 13 6 C 10 7 2 2 2 D 7 11 9 7 12 E 7 9 10 4 12 How should the jobs be allocated, one per employee, so as to minimize the total man-hours?
Q: Problem 2 22. The manager of a Burger Doodle franchise wants to determine how many sausage biscuits…
A: S = Number of Sausage biscuits to be produced H = Number of Ham biscuits to be produced Profit per…
Q: RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production…
A: Given Data, A ton of fuel additive is Material 1 mixes 25 tons Material 3 mixes 35 tons A ton…
Q: A) Ishwell Inc. is a growing company that just hired its 30th employee. Up until this point, they…
A: A management plan can be stated as the all-inclusive plan that gives the goals and objectives of any…
Q: Accompany makes two products (1&2) each product requires time on two machines (A&B). specification…
A: Linear programming, often known as linear optimization, is a method for obtaining the best result…
Q: The university is scheduling cleaning crews for its ten buildings. Each crew has a different cost…
A:
Q: A machine shop has an order for 12 000 pcs of a machine part that requires anti-corrosive…
A: Below is the solution:-
Q: Using stepping-stone method, the table becomes TOWN A TOWN B 300 500 O FACTORY X FACTORY Y DEMAND…
A: Stepping sotne method gives an optimal solution for the transportation proiblem. The optimal…
Q: 3.4-17. Comfortable Hands is a company which features a prod- uct line of winter gloves for the…
A: (a) Let M = number of men’s gloves to produce per week Let W = number of women’s gloves to…
Q: 8-1 (Production problem) Winkler Furniture manufactures two different types of china cabinets: a…
A: Let the number of French Provincial cabinets produced be F and Danish Modern cabinets be D. The Net…
Q: The university is scheduling cleaning crews for its ten buildings. Each crew has a different cost…
A: Given data is Objective function: Min Z=200x1+190x2+270x3+180x4+200x5+180x6+250x7+300x8 Subject to…
Q: A manufacturing plant 30m by 55 m, has inside 3 stamping machines 5 by 2m and 7 m in height and 37…
A: Safety and secure building of the Organization A safe structure will diminish the shot at security…
Q: 1. The Erlanger Manufacturing Company makes two products. The profit estimates are $35 for each unit…
A:
Q: 1. In the mechanical workshop, 5 different jobs are to be assigned to 4 different machines. Assign…
A: The Hungarian table looks like:
Q: A diet is being prepared for the University of Arizona dorms. The objective is to feed the students…
A: a)Solve the problem:
Q: Perdaris Enterprises had an expenditure rate of E′(x) = e0.1x dollars per day and an income rate of…
A: Expenditure rate E′(x) = e0.1x dollars per day and an income rate of I′(x) = 98.8 - e0.1x dollars…
Q: Determine the overhead application rates for the producing departments using each of the three…
A: THE OVERHEAD APPLICATION RATES UNDER THREE METHODS ARE AS BELOW:
Q: You own wheat warehouse with capacity of 20,000 bushels. At the beginning of month 1, you have…
A: wheat warehouse capacity = 20,000 bushels Inventory beginning of month 1= 6,000 bushels bought and…
Q: For each of the following scenarios, please identify the most appropriate Operations Research model.…
A: Operation Research model refers to the analytical method of solving problems and decision-making…
Q: The Ace Manufacturing Company has orders for three similar products. Orders Product (units) A 2,200…
A: Product Unit order A 2200 B 300 C 1100
Q: 7-17 The Outdoor Furniture Corporation manufactures two products, benches and picnic tables, for use…
A: Given data is Available labor hours = 1200 hours Available redwood = 3500 feet Profit from benches =…
Q: A factory produces four products, D, C, B, A, using two machines Mand M. The time taken and the cost…
A: First Calculate Profit per unit for each product. Unit Profit of product = Unit selling price – unit…
Q: 2) At the Departex Company, the Executive Committee is made up of the CEO Mr. Tsigaridis, the chief…
A: a) The following are the ethical dilemmas that are taking place Departex Company: Conflict of…
Q: A large CPA firm currently has 100 junior staffmembers and 20 partners. In the long run—say,20 years…
A: It is given in the question that a large firm (CPA) currently has junior 100 staff members and 20…
Q: RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production…
A: i. value of objective function = $1633.33 Dual price: highlighted in yellow: note: dual price…
Q: A company is developing its weekly production plan. The company produces two products, A and B,…
A: Given data is Fixed cost of A and B = $60 and $80 Unit profit of A and B = $17 and $21
Q: A manufacturing company has an aggregate planning of selling its beds in the following sizes (the…
A: Given Information: Total Production Bed Sizes Production Proportion Colors Proportion…
Q: Use the direct method to allocate service department costs. Calculate the overhead rates per…
A: 1. Calculation of service department cost using direct method. Overhead rate per direct labour hour…
Q: XYZ, Inc., is a small firm that produces a variety of chemical products. In a particular production…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-parts…
Q: 3.1-9.1 The Primo Insurance Company is introducing two new prod- uct lines: special risk insurance…
A: Linear programming (LP) is a broadly utilized numerical displaying method created to help chiefs in…
Q: A diet is being prepared for the University of Arizona dorms. The objective is to feed the students…
A: a) Following are the objective function and constraints of the problem: Let X be the number of…
Q: Consider the following tasks that must be assigned to four workers on a conveyor-paced assembly line…
A: This concept is from labor and working machine hours in operations management, where we calculate…
Q: A diet is being prepared for the University of Arizona dorms. The objective is to feed the students…
A: a)Solve the problem:
Q: In staffing the engineering organization, how may one determine the qualifications of a job…
A: Staffing : it is the process of hiring right candidates with right skills , to place in right…
Q: The Trim-Look Company makes several lines of skirts,dresses, and sport coats. Recently, a consultant…
A: Let ‘a’ be the number of skirts. Let ‘b’ be the number of dresses. Let ‘c’ be the number of sport…
Q: Ishwell Inc. is a growing company that just hired its 30th employee. Up until this point, they have…
A: A management plan can be stated as the formal planning mechanism that aims to design or outlines the…
Q: The Elastic Firm has two products coming on the market, Zigs and Zags. To make a Zig, the firm needs…
A: The question is related to Linear Programming. The details are given regarding two product Zigs and…
Q: 5. Myco is considering the introduction of three new products. For each product, the labor and raw…
A: The given information is as follows. The plants and capacity of the plants:
Q: In the Hungarian Methodology of solving the Assignment Model, upon eliminating the zeroes using the…
A: The Hungarian method is the technique used to solve the assignment problem where it states that if…
Q: 9. The Ace Manufacturing Company has orders for three similar products: Orders Product (units) A…
A: Given data is The capacity is more than orders so in the linear programming model there is no need…
Q: A company makes 2 products A and B from 2 resources. The products have the following resource…
A: Given information, Product 1 2 Avail resources Labor 3 2 150 Material 1 2 200 Profit…
Q: In a warehouse, the goods are usually moved around and stored on: Select one: a. Racks b. Containers…
A: There are 5 principal kinds of warehouse storage: Pallet racking Shelving Mobile Shelving…
Q: Answer the 3 subparts in 2 sentences each. For each of the following scenarios, please identify the…
A: Operational research is a scientific research for mathematical technique which is used in decision…
Q: he “fixed cost per unit function” may also be described as: a. the total cost line b. the total…
A: Fixed cost is the cost that is fixed irrespective of any production
Q: A paper-making company has five machines that can produce four different types of papers. The…
A: Given data is The given problem was an unbalanced matrix so to balance the matrix a dummy column is…
Q: A company manufactures two types of products. Each product type needs a turning process at the lathe…
A: Here we have (A) Decision Variables :Number of Type 1 Products = T1Number of Type 2 Products = T2
Q: RMC, Inc., is a small firm that produces a variety of chemical products. In a particular production…
A: given,
Q: A manufacturing fi rm has discontinued production of a certain unprofi table product…
A: Let X1 be the number of product X1 X2 be the number of product X2 X3 be the number of product X3
Q: Friendly Waste Co. runs three different factories and is required by law to safely dispose of…
A: THE ANSWER IS AS BELOW:
Q: 1. Consider four bases of operation B; and three targets T The tons of bombs per aircraft from any…
A: Here the data available is as follows,
Q: A. The Butterfield Company makes a variety of hunting knives. Each knife is processed on four…
A: The simplex method is a deliberate technique for testing the vertices as potential arrangements.…
A department has five employess with five jobs to be permormed. The time (in hours) each men will take to perform each job is given in the effectiveness matrix.
Employees | |||||
Jobs | I | II | III | IV | V |
A | 10 | 5 | 13 | 15 | 16 |
B | 3 | 9 | 18 | 13 | 6 |
C | 10 | 7 | 2 | 2 | 2 |
D | 7 | 11 | 9 | 7 | 12 |
E | 7 | 9 | 10 | 4 | 12 |
How should the jobs be allocated, one per employee, so as to minimize the total man-hours?
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- The eTech Company is a fairly recent entry in the electronic device area. The company competes with Apple. Samsung, and other well-known companies in the manufacturing and sales of personal handheld devices. Although eTech recognizes that it is a niche player and will likely remain so in the foreseeable future, it is trying to increase its current small market share in this huge competitive market. Jim Simons, VP of Production, and Catherine Dolans, VP of Marketing, have been discussing the possible addition of a new product to the companys current (rather limited) product line. The tentative name for this new product is ePlayerX. Jim and Catherine agree that the ePlayerX, which will feature a sleeker design and more memory, is necessary to compete successfully with the big boys, but they are also worried that the ePlayerX could cannibalize sales of their existing productsand that it could even detract from their bottom line. They must eventually decide how much to spend to develop and manufacture the ePlayerX and how aggressively to market it. Depending on these decisions, they must forecast demand for the ePlayerX, as well as sales for their existing products. They also realize that Apple. Samsung, and the other big players are not standing still. These competitors could introduce their own new products, which could have very negative effects on demand for the ePlayerX. The expected timeline for the ePlayerX is that development will take no more than a year to complete and that the product will be introduced in the market a year from now. Jim and Catherine are aware that there are lots of decisions to make and lots of uncertainties involved, but they need to start somewhere. To this end. Jim and Catherine have decided to base their decisions on a planning horizon of four years, including the development year. They realize that the personal handheld device market is very fluid, with updates to existing products occurring almost continuously. However, they believe they can include such considerations into their cost, revenue, and demand estimates, and that a four-year planning horizon makes sense. In addition, they have identified the following problem parameters. (In this first pass, all distinctions are binary: low-end or high-end, small-effect or large-effect, and so on.) In the absence of cannibalization, the sales of existing eTech products are expected to produce year I net revenues of 10 million, and the forecast of the annual increase in net revenues is 2%. The ePIayerX will be developed as either a low-end or a high-end product, with corresponding fixed development costs (1.5 million or 2.5 million), variable manufacturing costs ( 100 or 200). and selling prices (150 or 300). The fixed development cost is incurred now, at the beginning of year I, and the variable cost and selling price are assumed to remain constant throughout the planning horizon. The new product will be marketed either mildly aggressively or very aggressively, with corresponding costs. The costs of a mildly aggressive marketing campaign are 1.5 million in year 1 and 0.5 million annually in years 2 to 4. For a very aggressive campaign, these costs increase to 3.5 million and 1.5 million, respectively. (These marketing costs are not part of the variable cost mentioned in the previous bullet; they are separate.) Depending on whether the ePlayerX is a low-end or high-end produce the level of the ePlayerXs cannibalization rate of existing eTech products will be either low (10%) or high (20%). Each cannibalization rate affects only sales of existing products in years 2 to 4, not year I sales. For example, if the cannibalization rate is 10%, then sales of existing products in each of years 2 to 4 will be 10% below their projected values without cannibalization. A base case forecast of demand for the ePlayerX is that in its first year on the market, year 2, demand will be for 100,000 units, and then demand will increase by 5% annually in years 3 and 4. This base forecast is based on a low-end version of the ePlayerX and mildly aggressive marketing. It will be adjusted for a high-end will product, aggressive marketing, and competitor behavior. The adjustments with no competing product appear in Table 2.3. The adjustments with a competing product appear in Table 2.4. Each adjustment is to demand for the ePlayerX in each of years 2 to 4. For example, if the adjustment is 10%, then demand in each of years 2 to 4 will be 10% lower than it would have been in the base case. Demand and units sold are the samethat is, eTech will produce exactly what its customers demand so that no inventory or backorders will occur. Table 2.3 Demand Adjustments When No Competing Product Is Introduced Table 2.4 Demand Adjustments When a Competing Product Is Introduced Because Jim and Catherine are approaching the day when they will be sharing their plans with other company executives, they have asked you to prepare an Excel spreadsheet model that will answer the many what-if questions they expect to be asked. Specifically, they have asked you to do the following: You should enter all of the given data in an inputs section with clear labeling and appropriate number formatting. If you believe that any explanations are required, you can enter them in text boxes or cell comments. In this section and in the rest of the model, all monetary values (other than the variable cost and the selling price) should be expressed in millions of dollars, and all demands for the ePlayerX should be expressed in thousands of units. You should have a scenario section that contains a 0/1 variable for each of the binary options discussed here. For example, one of these should be 0 if the low-end product is chosen and it should be 1 if the high-end product is chosen. You should have a parameters section that contains the values of the various parameters listed in the case, depending on the values of the 0/1 variables in the previous bullet For example, the fixed development cost will be 1.5 million or 2.5 million depending on whether the 0/1 variable in the previous bullet is 0 or 1, and this can be calculated with a simple IF formula. You can decide how to implement the IF logic for the various parameters. You should have a cash flows section that calculates the annual cash flows for the four-year period. These cash flows include the net revenues from existing products, the marketing costs for ePlayerX, and the net revenues for sales of ePlayerX (To calculate these latter values, it will help to have a row for annual units sold of ePlayerX.) The cash flows should also include depreciation on the fixed development cost, calculated on a straight-line four-year basis (that is. 25% of the cost in each of the four years). Then, these annual revenues/costs should be summed for each year to get net cash flow before taxes, taxes should be calculated using a 32% tax rate, and taxes should be subtracted and depreciation should be added back in to get net cash flows after taxes. (The point is that depreciation is first subtracted, because it is not taxed, but then it is added back in after taxes have been calculated.) You should calculate the company's NPV for the four-year horizon using a discount rate of 10%. You can assume that the fixed development cost is incurred now. so that it is not discounted, and that all other costs and revenues are incurred at the ends of the respective years. You should accompany all of this with a line chart with three series: annual net revenues from existing products; annual marketing costs for ePlayerX; and annual net revenues from sales of ePlayerX. Once all of this is completed. Jim and Catherine will have a powerful tool for presentation purposes. By adjusting the 0/1 scenario variables, their audience will be able to see immediately, both numerically and graphically, the financial consequences of various scenarios.According to the XYZ Apartment Rental Company ER diagram, which of the following is true? Each building must have more than one builder Each building must have multiple apartments Each building must have at least 8 apartments Each building must have more than 2 apartments Answer: ____The university is scheduling cleaning crews for its ten buildings. Each crew has a different cost and is qualified to clean only certain buildings. There are eight possible crews to choose from in this case. The goal is to minimize costs while making sure that each building is cleaned. The management science department formulated the following linear programming model to help with the selection process. Min 270x1 + 290x2 + 250x3+ 270x4 + 230x5 + 180x6 + 180x7 + 280x8s.t. x1 + x2 + x5 + x7 ≥ 1 {Building A constraint}x1 + x2 + x3 ≥ 1 {Building B constraint}x6 + x8 ≥ 1 {Building C constraint}x1 + x4 + x7 ≥ 1 {Building D constraint}x2 + x7 ≥ 1 {Building E constraint}x3 + x8 ≥ 1 {Building F constraint}x2 + x5 + x7 ≥ 1 {Building G constraint}x1 + x4 + x6 ≥ 1 {Building H constraint}x1 + x4 + x8 ≥ 1 {Building I constraint}x1 + x2 + x7 ≥ 1 {Building J constraint}xj = {1, if crew j is selected0, otherwisexj = 1, if crew j is selected0, otherwise Set up the problem in Excel and find…
- The university is scheduling cleaning crews for its ten buildings. Each crew has a different cost and is qualified to clean only certain buildings. There are eight possible crews to choose from in this case. The goal is to minimize costs while making sure that each building is cleaned. The management science department formulated the following linear programming model to help with the selection process. Min 270 x1 + 230x2 + 240x3+ 220x4 + 190x5 + 270x6 + 230x7 + 220x8 st. x1 + x2 + x5 + x7 ≥ 1 (Building A constraint] x1 + x2 + x3 ≥ 1 (Building B constraint} x6 + x8 ≥ 1 (Building C constraint} x1 + x4 + x7 ≥ 1 (Building D constraint} x2 + x7 ≥ 1 (Building E constraint] x3 + x8 ≥ 1 (Building F constraint) x2 + x5 + x7 ≥ 1 (Building G constraint} X1 + x4 + x6 ≥ 1 (Building H constraint] x1 + x4 + x8 ≥ 1 (Building I constraint} x1 + x2 + x7 ≥ 1 (Building J constraint} xj= {1, if crew j is selected {0, otherwise Set up the problem in Excel and find the optimal solution. a. What…A company uses raw material to produce two products. For $175, a unit of raw material can be purchased and processed into 3 units of product 1 and 4 units of product 2. If x1 units of product 1 are pro- duced, they can be sold at 300 2 x1 dollars per unit. If x2 units of product 2 are produced, they can be sold at 160 2 x2 dollars per unit. (Negative prices are not per- mitted.) The company can choose the number of units of raw material that are purchased and processed. How can the company maximize its profit?Use the simplex iteration method each of the objective function using the same constrains Maximize Z=3X1-X2+3X3+4X4 Minimize Z=5x1-4x2+6x3-8x4 Constrains x1+2x2+2x3+4x4=<40 2x1-x2+x3+2x4=<8 4x1-2x2+x3-x4=<10 x1, x2, x3, x4=>0
- Is my solution correct and did I fully answer the questions? (see attachment for my solution) Question: There are three factories on Momiss River. Each emits two types of pollutants, labeled P1 and P2, into the river. If the waste from each factory is processed, the pollution in the river can be reduced. It costs $1,500 to process a ton of factory 1 waste, and each ton processed reduces the amount of P1 by 0.10 ton and the amount of P2 by 0.45 ton. It costs $2,500 to process a ton of factory 2 waste, and each ton processed reduces the amount of P1 by 0.20 ton and the amount of P2 by 0.25 ton. It costs $3,000 to process a ton of factory 3 waste, and each ton processed reduces the amount of P1 by 0.40 ton and the amount of P2 by 0.50 ton. The state wants to reduce the amount of P1 in the river by at least 125 tons and the amount of P2 by at least 175 tons. a. Use Solver to determine how to minimize the cost of reducing pollution by the desired amounts. Are the LP assumptions…The values of the same 15 student in two subject A and B are given below the two numbers within the brackets denoting the ranks of the same student in A and B respectively.(1,10), (2,7), (3,2), (4,6), (5,4), (6,8), (7,3), (8,1), (9,11),(10,15), (11,9), (12, 5), (13, 14), (14,12), (15, 13). Find the rank correlation coefficient.A company manufactures two types of trucks. Eachtruck must go through the painting shop and the assembly shop. If the painting shop were com-pletely devoted to painting type 1 trucks, 650 per day could be painted, whereas if the painting shopwere completely devoted to painting type 2 trucks,550 per day could be painted. If the assembly shopwere completely devoted to assembling truck 1engines, 1400 per day could be assembled, whereasif the assembly shop were completely devoted toassembling truck 2 engines, 1000 per day could beassembled. It is possible, however, to paint bothtypes of trucks in the painting shop. Similarly, it ispossible to assemble both types in the assemblyshop. Each type 1 truck contributes $2500 to profit; each type 2 truck contributes $3000. Use Solver to maximize the company’s profit. (Hint: One ap-proach, but not the only approach, is to try a graphi-cal procedure first and then deduce the constraints from the graph.)