A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 120 engines to these assembly plants. It costs $35 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant il gives similar $15 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost? How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints? The number of engines to send to plant I is The number of engines to send to plant IlI is

Linear Algebra: A Modern Introduction
4th Edition
ISBN:9781285463247
Author:David Poole
Publisher:David Poole
Chapter2: Systems Of Linear Equations
Section2.4: Applications
Problem 3EQ: A florist offers three sizes of flower arrangements containing roses, daisies, and chrysanthemums....
icon
Related questions
Topic Video
Question
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The
company can send at most 120 engines to these assembly plants. It costs $35 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives
the manufacturing company $20 in rebates toward its products for each engine they buy, while plant il gives similar $15 rebates. The manufacturer estimates
that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize
shipping costs? What is the minimum cost?
How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints?
The number of engines to send to plant I is
The number of engines to send to plant IIl is
Transcribed Image Text:A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 120 engines to these assembly plants. It costs $35 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant il gives similar $15 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost? How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints? The number of engines to send to plant I is The number of engines to send to plant IIl is
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Optimization
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, algebra and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Linear Algebra: A Modern Introduction
Linear Algebra: A Modern Introduction
Algebra
ISBN:
9781285463247
Author:
David Poole
Publisher:
Cengage Learning
Algebra: Structure And Method, Book 1
Algebra: Structure And Method, Book 1
Algebra
ISBN:
9780395977224
Author:
Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:
McDougal Littell