A particular load has a pt of 0.78 logging.The power delivered to the load is 36KW from a 240V rms 40Hz line. If 200µF capacitor is placed in parallel with the load, What is the new power factor of the total load. Select one: O a. 0.826 lagging. O b. 0.5 leading. O c.0.94 logging O d. 0.7 leading.

Electricity for Refrigeration, Heating, and Air Conditioning (MindTap Course List)
10th Edition
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Russell E. Smith
Chapter7: Alternating Current, Power Distribution, And Voltage Systems
Section: Chapter Questions
Problem 7RQ
icon
Related questions
Question
A particular load has a pt of 0.78 lagging.The power delivered to the load is 36KW from a 240V rms 60Hz line. If 200μF
capacitor is placed in parallel with the load, What is the new power factor of the total load.
Select one:
O a. 0.826 logging.
O b. 0.5 leading.
O c.0.94 logging
O d. 0.7 leading.
Transcribed Image Text:A particular load has a pt of 0.78 lagging.The power delivered to the load is 36KW from a 240V rms 60Hz line. If 200μF capacitor is placed in parallel with the load, What is the new power factor of the total load. Select one: O a. 0.826 logging. O b. 0.5 leading. O c.0.94 logging O d. 0.7 leading.
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Analysis of Multiple Order System and Steady State Error
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Electricity for Refrigeration, Heating, and Air C…
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning