A power grid is to be created in a city. There are several buildings and there are paired connections between the buildings. Not every building is connected to every other building.  In particular, there may be buildings that are not connected to any other building. Based on the mentioned connections, a power grid is to be designed now. Thereby starting from a given building (the electricity factory), so that as many buildings as possible are in the network. as many buildings as possible are in the network. A power cable can be laid only between connected buildings and there will be exactly one power cable is needed for a connection between two buildings. A building is in the power grid if it can be reached from the power factory by one or more power cables. Specify an algorithm in pseudo code that, given buildings and connections, calculates a power grid that satisfies the above properties with as few power cables as possible. Determine the running time of your algorithm and give a justification for its correctness.

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
Question

Hey,

A power grid is to be created in a city. There are several buildings and there are paired
connections between the buildings. Not every building is connected to every other building.
 In particular, there may be buildings that are not connected to any other building.
Based on the mentioned connections, a power grid is to be designed now. Thereby
starting from a given building (the electricity factory), so that as many buildings as possible are in the network.
as many buildings as possible are in the network.
A power cable can be laid only between connected buildings and there will be exactly
one power cable is needed for a connection between two buildings. A building is in the
power grid if it can be reached from the power factory by one or more power cables.

Specify an algorithm in pseudo code that, given buildings and connections, calculates a power grid
that satisfies the above properties with as few power cables as possible.
Determine the running time of your algorithm and give a justification for its correctness.

Expert Solution
steps

Step by step

Solved in 4 steps with 1 images

Blurred answer
Knowledge Booster
ECL logic gate
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,