A proposed road is to be built along a 15km stretch. The figures below show the profile and sections for excavation and backfilling. 1) ROAD PROFILE EXISTING GRADE REQUIRED ROAD GRADE CUT FILL -9.0km- -6.0km- SECTION FOR BACKFILLING (AREA = (1/2)*(B+B2)*(HEIGHT OF SECTION)) -10.0m- REQO ROAD GRADE FILL SECTION FOR EXCAVATION (AREA = (1/2)*(B,+B2)*(HEIGHT OF SECTION)) EXSITING GRADE CUT REGD ROAD GRAD 10.0m- ***Note: Volume for fill must be computed separately from volume for cut. Volumes for cut and fill shall be computed using the end area method for volume computation as given in the equations below. Volume for backfill = (1/2) • (A. + A2) * (Le) Where: A, = The area of the section at the start of the fill portion Az = The area of the section at the end of the fill portion Lf = Length of sections in fill shown in the road profile Volume for excavation = (1/2) • (A. + A2) * (L.) Where: A, = The area of the section at the start of the cut portion Az = The area of the section at the end of the cut portion L = Length of sections in cut shown in the road profile 1.a) Determine the quantity for Backfilling (m³) 1.b) Determine the quantity for Excavation (m) -3.0m- 2.0mt SEE ROAD
A proposed road is to be built along a 15km stretch. The figures below show the profile and sections for excavation and backfilling. 1) ROAD PROFILE EXISTING GRADE REQUIRED ROAD GRADE CUT FILL -9.0km- -6.0km- SECTION FOR BACKFILLING (AREA = (1/2)*(B+B2)*(HEIGHT OF SECTION)) -10.0m- REQO ROAD GRADE FILL SECTION FOR EXCAVATION (AREA = (1/2)*(B,+B2)*(HEIGHT OF SECTION)) EXSITING GRADE CUT REGD ROAD GRAD 10.0m- ***Note: Volume for fill must be computed separately from volume for cut. Volumes for cut and fill shall be computed using the end area method for volume computation as given in the equations below. Volume for backfill = (1/2) • (A. + A2) * (Le) Where: A, = The area of the section at the start of the fill portion Az = The area of the section at the end of the fill portion Lf = Length of sections in fill shown in the road profile Volume for excavation = (1/2) • (A. + A2) * (L.) Where: A, = The area of the section at the start of the cut portion Az = The area of the section at the end of the cut portion L = Length of sections in cut shown in the road profile 1.a) Determine the quantity for Backfilling (m³) 1.b) Determine the quantity for Excavation (m) -3.0m- 2.0mt SEE ROAD
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter4: Measuring Site Work, Excavation, And Piling
Section: Chapter Questions
Problem 11RQ
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning