An arched underpass has the shape of a parabola. A road passing under the arch is 24 feet wide, and the maximum height of the arch is 14.4 feet. How wide must a truck to be able to pass through the underpass with vertical clearance of 10.8 ft?
Q: What is the shifting taper length required to shift a vehicle lane 5 feet on a roadway with a speed…
A: taper length L for speed 40mph or less=WS260=5*35260=102.083 ft shifting taper length…
Q: f the most efficient of all cross sections can be used, what shape and size of open channel would…
A: In an open channel flow condition, the Hydraulically efficient channel section is defined s the…
Q: Compute the volume between the two stations using prismoidal formula. Compute the volume between the…
A:
Q: It is the minimum width of two-lane farm to market road having an average daily traffic of less than…
A: The minimum width of two-lane farm to market road having an average daily traffic of less than 200…
Q: An architetect wants to design a semicircular tunnel so that two average trucks measuring 8 feet…
A: Given: A semicircular tunnel in which two average trucks measuring 8 feet wide and 12 feet tall can…
Q: 1. Determine the SSD for a roadway with a 50 mph design speed on a down grade of 23%.
A: Given data : Design speed (V)=50 mphreaction time (t)=2.5 secassumed deceleration rate (a)=11.2…
Q: B A railroad crossing with a passive control is formed by a two-lane highway with a design speed of…
A:
Q: Consider a single span rectangular beam supporting a pedestain bridge, if you calculated the…
A: If the deflection due to live load is higher than what code allows then bridge is NOT SAFE .
Q: A section of Texas Highway 83 (Tx83) has a capacity in the eastbound direction of 4,000 vehicles per…
A:
Q: 1. Compute the minimum length of guardrail required to shield a hazard located 25 ft from the…
A: Given data: Lateral distance from pavement edge to hazard (LA)=25 ftLateral distance from pavement…
Q: An urban freeway presently has three 12-ft lanes on a 3 percent upgrade 1.75 mi long. The traffic…
A: An urban freeway is the reducing the public policy of urban planning policy to recreate the freeways…
Q: HW: A traffic stream is carrying 4500 veh/hr in three lanes in one direction. What is the average…
A:
Q: A six lane highway (three 12-ft lanes in cach direction) has a superelevation of 6%, and a design…
A:
Q: Draw a space – time diagram for traffic within a tunnel. Assuming there exist a 2-lane before the…
A: Required: To draw a space – time diagram for traffic within a tunnel. Assume that…
Q: Find the grade resistance, to the nearest ten pounds, for a 2100-lb car traveling on a 1.8° uphill…
A:
Q: 2 A vehicle initially traveling at (75 mile/hr.), skids to a stop taking (170) m to do so. the…
A: Stopping sight distance is the length on highway which is sufficient for stopping a vehicle…
Q: With the aid of a well-labeled diagram, explain the stages involved in a bathtub curve
A:
Q: A Class II two-lane highway needs to be redesigned for an area with rolling terrain. During the peak…
A:
Q: A new transportation engineer is charged with the design of a horizontal curve for the Malaysian…
A: Assumption: Let the design speed for the highway be 80 km/h. The maximum super elevation is 7%. The…
Q: A golf ball is driven with the initial velocity of 161fps upward at 30° to the horizontal from an…
A:
Q: A two-lane major road with 40 mph east west direction crosses a two-lane minor road with 30 mph at a…
A:
Q: A car is traveling at 30 mph in the country at night on a wet road through a 273 ft. long crest…
A: G1 = 4% = 0.04 G2 = -3% = -0.03 L = 273 ft
Q: What is the lane distribution factor recommended by the AASHTO design guide for a 6-lane highway (3…
A: Answer From AASHTO design guide we have Lane distribution factors as follows Number of Lanes in…
Q: 3. What is the force that tend to slide the vehicle outward of its curved path?
A:
Q: A proposed highway is to be designed with adequate shoulder and clearance in a level terrain with…
A: AADT = 25,000 pcu/day. D% = 65%. K=9%. To Find: - The number of lanes that will provide LOS C.
Q: Structural analysis is an integral part of any structural engineering project, its function being…
A: Structural analysis is an integral part of any structural engineering project, its function being…
Q: Explain THREE (3) purposes of lift traffic control.
A: Purpose of lift traffic control:
Q: proposed highway is to be designed with adequate shoulder and clearance in a level terrain with the…
A:
Q: How can we tell what the effect is likely to be without building the freeway?
A: Freeway, highway, or corridor is a long length of road that connects various small or large roads at…
Q: escribe traffic tunnels. What are the characteristics of traffic tunnels?
A: Traffic tunnel is a tunnel is an underground passageway. It is dug through the surrounding soil/…
Q: Identify and briefly discuss at least 3 risks that may be associated with this project. Highway…
A: Risk assessment is important for the preparation and the executives of dangers to limit the…
Q: 2. Determine the speed of the block if
A:
Q: crosswalk is 11 ft. How much for these pedestrians? A. 52.8 sec Tips should be set B. 21.2 sec C.…
A:
Q: For a bridge with a 56 feet gutter to gutter (clear roadway width), what is the designed "n" (number…
A: Load and Resistance Factor design or LRFD specifications are used for designing and evaluation of…
Q: Compute the volume between the two stations using using end area applying prismoidal correction.…
A:
Q: A two-tier system to repair bridges is supported by two steel cables for each platform. All the…
A:
Q: A car weighing 40 tons is switched to a 2% upgrade with a velocity of 30mph. If the train resistance…
A:
Q: a 2000 lb car (innova) has an available tractive force of 255 lb. and is travelling along an…
A:
Q: If the width of the road, b=12 m, calculate the slope of the side slopes of the sections. If the…
A: 1. side slope of the section - b =12m. (half width=122=6) 123+00 right Vertical…
Q: A developer has requested permission to build a large retail store at a location adjacent to the…
A: Following is the given data: Speed limit on major road = 35 mi/h and speed limit on minor road = 50…
Q: During peak periods, “Trotro” drivers use the shoulders as travel lanes on the section of the Kasoa…
A:
Q: or the bridge structure what should be the vertical clearance to be observed between the bottom of…
A:
Q: Compute the minimum length of guardrail required to shield a hazard located 25 ft from the pavement…
A: Given data: lateral distance from pavement edge to barrier L2=12 ftlateral distance from pavement…
Q: ) The driver of an automobile moving with the velocity of 90 km/h on a 4% graded descending highway…
A:
Q: Length of vehicles does not affect CA) Extra widening O(B) Minimum radius of turning OC) Passing…
A: Length of vehicle effect : Passing sight distance Minimum radius of turning Extra widening…
Q: What is traffic capacity of a highway link? What factors affect the handling capacity of a highway?
A: Traffic capacity of a highway link- It is the capacity of the highway link to accommodate traffic…
Q: A developer has requested permission to build a large retail store at a location adjacent to the…
A: Sight distance: It is a surface length of road which a driver can see with a tolerable level of…
Step by step
Solved in 3 steps with 3 images
- INSTRUCTION: COMPLETE SOLUTION WITH FIGURES. BOX YOUR FINAL ANSWER. An underpass crossing a reinforced concrete bridge along the Shaw Blvd has a symmetrical vertical curve, having a downward grade of -4% meeting an upward grade of +7.5% at the vertex V at elevation 70 m and stationing of 7+700, exactly underneath the center line of the bridge having a width of 10 m. If the required minimum clearance under the bridge is 5 m, and the elevation of the bottom of the bridge is 78.10 m. a) Determine the length of the vertical parabolic curve that shall connect the two tangents. b) Determine the stationing of the point a catch basin (lowest point) will be placed. c) Determine the elevation of the point where a catch basin (lowest point) will be placed.There is a 26ft high parabolic arch that spans a parkway. Determine the width of the arch if the center section of the parkway, a section which is 47 ft wide, has a minimum clearance of 13ft?2. A truck has to pass under an overhead parabolic arch bridge which has a span of 20 meters and is 16 meters high. If the tank is 14 meters wide, is placed in the truck with its sides vertical, and the top of the tank is 7.5 meters above the street level, what is the smallest clearance from the top of the tank so that the truck can pass under the bridge?
- A two-lane major road with 40 mph east west direction crosses a two-lane minor road with 30 mph at a 90- degree angle. The Intersection is uncontrolled. A proposal is being made to construct a building at the south-east corner of the intersection. If the building is placed 41 feet from the center of the approach lane (nearest lane to the building) on minor road, what distagce the building should be constructed from the edge of the travel way on major road to satisty sight distance requirements. Alsume each lane is 12 feet.Determine the cross sectional area for a 10m wide roadway at Sta 12+198 using the given cross section notes: Round your answer to 3 decimal places.The following cross-section notes of the road was examined to calculate volumes. The width of the roadway is 12m -12 -3 +6 -6 +24 -9 STA 5+040 -15 -4.5 +6 -8 -6 -30 -12 -6 -7 STA 5+140 a. What is the cross section at STA 5+040? STA 5+140?
- As SR361 enters Middletown from the NW, it must curve to the south between two historic buildings. At this point, SR361 consists of two 11-foot lane. The building to the right of traffic, is only 10 feet from the edge of the 5-foot wide shoulder. Local policy is that the superelevation rates not exceed 0.06 inches per inch. Will the minimum SSD be available from vehicles moving at 60 mph through this curve?Draw the cross-section for a typical long roadway tunnel. The question above is for my transportation engineering class. That's the only information that was provided for the question. Thank you so much in advance! 2RING 1 RING 2 $1 2 DJL $5 MAJOR STREET lead-lag lag-lag none $2 $6 BARRIER = Phase Number = Protected Movement $3 MINOR STREET $4 = Permitted Movement = Pedestrian Movement In this ring and barrier diagram, what sequencing is used for the protected left turns? O lead-lead BARRIER
- A bridge 10-m wide is to be placed across a proposed underpass. This underpass is designed to have a grade of -4% and an ascending grade of +8%, where its vertex will be located at 4+420 with an elevation of 140m. It is required that the centerline of the bridge is exactly placed above the vertex of the curve, its bottom elevation is 148.10m and it should have a minimum vertical clearance of 6m under it. a) Determine the length of the vertical parabolic curve. b) Determine the location of the lowest point of the curve. c) Determine the elevation of the lowest point. d) Determine the stationing and elevation of PC. e) Determine the stationing and elevation of PT.What super-elevation rate would you recommend for a roadway with a design speed of 110 kph and a radius of 1400 ft? Assume f=0.11.Distinguish the three major classes of cable-stayed bridge designs.