An eight-lane freeway (four lanes in each direction) is on rolling terrain and has 11-ft lanes with a 4- ft right-side shoulder. The total ramp density is 1.5 ramps per mile. The directional peak-hour traffic volume is 5400 vehicles with 11% heavy vehicles. The peak 15-minute volume is 1421 vehicles. What are the freeway’s density and level of service
Q: 100KN 30° B с 120KN 6 D 60KN DETERMINE THE FORCES MEMBERS AB, FC, GF,
A: We have a truss structure.To find the force in members AB, FC, GF and GD-
Q: DETERMINE FORCES IN ALL IndiCATE WETHER FENSION COMPRESSION (C зм A 유 D 15m FIC 30° B 100 KN 30° с A…
A: To calculate the force in each member and indicate whether it is tension or compression.
Q: Example 7: The figure below shows a complex manometer. Calculate: 1. The gauge pressure of the air…
A:
Q: ular distance between 2 paralle ne long chord from PC to PT is Y > Compute the Compute the Compute…
A:
Q: 17.8 A topographic map has a contour interval of 1 ft and a scale of 1:4800. If two adjacent…
A:
Q: *4-12. Determine the shear and moment throughout the beam as a function of a. Prob. 4-12 4 m 600 N…
A: A simply supported beam with point load of . Roller support at point A and hinged support at point…
Q: For the built-up shape shown, determine: (a) the elastic section modulus and the yield moment (b)…
A: fy=345MPagiven sectionelastic sectional modulus=?yield moment=?plastic sectional modulus=?plastic…
Q: e is 2 L/hr. What is the concentration of tracer in the reactor 1 hr minated? The reactor had an…
A: To solve this problem, we'll use the principle of mass balance in a continuously stirred tank…
Q: What is the area and estimated error in square feet of a rectangular piece of property having…
A:
Q: The piping of the circuit in Figure is modified as follows. First, the pipeline from the upper…
A: The configuration of the piping in a hydraulic circuit can have a big impact on how well and…
Q: a 2.1-meter wide strip footing by 1.1 meter deep is underlain by a soil with a c'=0 psf, phi'=35…
A: B = 2.1 m Df = 1.1 m c' = 0 = 35o = 19.8 lb/ft3FS = 3
Q: has the dimensions of 16.0 m² (4 m by 4 m). At 22°C, the density of the oil is 913 kg m-3 and the…
A: given data,FINDi)verify boundary layer laminar or notii)thickness of boundary layer at 2m in the…
Q: 1₁ =151/ft 6ft $ft W2 = 2016/ft COMPUTE THE MIDSPAN DEFLECTION IN TERMS OF EI. HD
A: given datasimply supported beam is given Findmidspan deflection
Q: 1. A fine-grained soil has a liquid limit of 300% and a plastic limit of 55%. The natural water…
A: Given data - LL = 300%PL = 55%w = 80% Clay fraction = 60% Find out - Determine the plasticity index,…
Q: 2-27. Determine the reactions at the pin A and smooth supports B, D, and F. The members are pin…
A:
Q: omplete the earth work calculation sheet here and plot the resulting mass diagram. Divide ccy by 0.9…
A:
Q: Part A Determine the angle at which the 500-N force must act at A so that the moment of this force…
A: Apply equilbrium condition , Taking moment about point B
Q: Prob. 2.6-10. A rigid, weightless beam BD supports a load P and is, in turn, supported by two hanger…
A: L = 2 mLBD = 1.5 m P = 205 kN
Q: 150mm ↑ 415mm 100 mm 15mm V
A: fy= 345 MPa= 345 N/mm2the cross-section is given as follows
Q: A rectangular footing of 4mx 3 m is founded at a depth of 2m below the ground surface in a (C-4)…
A: Bearing capacity of foundation: It is defined as the maximum soil that can be bear the load from the…
Q: A gage on a small (1-acre) urban parking lot recorded the following incremental rainfall data. 1.5 2…
A:
Q: Problem 2 Two water manometers (20°C) are connected to a tank of air, as shown (EFM 11th ed, Problem…
A:
Q: 1. Use the method of sections to determine the magnitude of the internal forces (lbs) in members JK,…
A: Determine the forces in the member JK, CI and HI of the truss using Method of section.
Q: A sawn lumber column is used to support axial loads of PDead= 10 kips and PSnow= 15 kips. The…
A: Given data,
Q: Using the AASHTO soild classification system, classify a fine-grained soil (75% passing #200 sieve)…
A: given datafine-grained soil75% passing #200 sieveliquid limit of 70plastic limit of 20FINDclassify…
Q: ure 1 shows the plan view of an exhibition hall with dimensions L: x L₂. The structure is to…
A: L=4.55 mh=22.2 mt=122 mmDL=3.55 kPaLL= 4.55 kPafck= 25.5 Mpafy= 472 MpaTo design1) Loads2) Design…
Q: Problem 1 Classify each of the following trusses as statically determinate, statically…
A: The static determinacy of a plane truss can be checked using the following criteria:.m: no. of…
Q: what is the pore volume of the sample?
A:
Q: An electromagnetic catapult system is being designed to replace a steam-driven system on an aircraft…
A: Given data - M = 17000 kg S = 76 m v = 88 m/s Find out -The force catapult exert on the aircraft ?
Q: solve for the reactions using method of section and joint
A:
Q: The frame shown is supported by a roller acting on an inclined surface at point B and a pinned joint…
A: Given:Required:Internal moment, axial force and shear force at section CD
Q: Problem 3.134. Given: اده Solution: 3L- EL d = ? P = 0.75 SG=1.0 SG=1.2 Pater Find: To what depth d…
A: Given Density of body = 0.75 × density of waterWidth 6 LSpecific gravity = 1 and 1.2 To find out…
Q: An A992 W18x40 supports a steel deck oriented perpendicular to the beam. The total slab thickness is…
A: To determine the number of 5/8-inch shear studs required per half of the span, we need to calculate…
Q: 3. Using ASD determine the total service load that the column can carry Round your answer to 3…
A: Effective length factor (k) = 0.80 Ag = 5.01 in2rx = ry = 2.26 in Length (L) = 10 ft or 120 in
Q: Use the simplified version of the basic curve equation to calculate the minimum radius (m) for a…
A:
Q: Find the extreme fiber bending stress, fb, for a W-section used as a simple beam, with a uniformly…
A: W sectionSimply supported beam.Span length, Uniformly distributed load, To find: Maximum moment,…
Q: Compute for the following: INST. POSITION Near STA. A Mean D.E.1 INST. POSITION Near STA. B Mean…
A:
Q: 5 kips A 10 kips 8'-0" B 16'-0"
A:
Q: Design a rectangular beam for a 6 m simple span to support a uniform dead load of 15 kN/m and…
A:
Q: FTTR 10m 7W (kN/m) 10m 50m 3W (kN/m) rimm 10m pin 10m rim
A: Given data,continuous beam is given FINDSFD, BMD , elastic force and axial force diagram
Q: 2. A liquid limit test, conducted on a soil sample in the cup device, gave the following results:…
A:
Q: 4. What is the difference between lumped (hydrologic) routing and distributed (hydraulic) routing?
A: Routing, in hydrology, is used to prepare hydrological models and simulations of water flow in a…
Q: A rectangular beam reinforced for tension only has b=300mm, d = 490 mm. The tension steel area…
A: b = 300 mm d = 490 mm7-25 mm diameter rebarfy = 415 MPaf'c = 21 MPa
Q: Figure 1 below shows the CBR results for two materials (1 and 2) what is the CBR value for each…
A: Given,CBR results for two materialsto determine,for soil 1the resilient modulus of the subgrade soil…
Q: Can I obtain a soil’s volumetric water content (θ) from its gravimetric water content (w)?
A: Yes, you can obtain a soil's volumetric water content (θ) from its gravimetric water content (w) if…
Q: RKI Instruments manufactures a ventilation controller designed for monitoring and controlling carbon…
A: given datanet cash flow is givenyears are givenfind1) what do the wo rules about sign changes…
Q: 2) AT 25KN/M 2m Im 10KN/M -> 3m +6
A:
Q: determine the total hydrostatic force acting on the curved surface. the tank is 6m in length.
A: length of tank is 6mfig is givenFINDtotal hydrostatic force
Q: could you explain in detail how you made the direct runoff hydrograph how the table was made
A: Given:1 hr unit hydrographRainfall excess in 1st hour = 1 inchRainfall excess in 2nd hour = 2…
Q: hat are the possible proposed solutions for soil contamination on construction sites
A: Contamination of soil on construction sites can be a significant environmental concern, and…
An eight-lane freeway (four lanes in each direction) is on rolling terrain and has 11-ft lanes with a 4- ft right-side shoulder. The total ramp density is 1.5 ramps per mile. The directional peak-hour traffic volume is 5400 vehicles with 11% heavy vehicles. The peak 15-minute volume is 1421 vehicles. What are the freeway’s density and level of service
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 8 images
- A freeway is being designed to carry a heavy volume of 5000 veh/h on a regular weekday in rolling terrain. If the PHF is 0.9 and the traffic consists of 90% passenger cars and 10% trucks, determine the number of 12-ft lanes required in each direction if the highway is to operate at level of service C. The free-flow speed is 70 mi/h, there is no lateral obstruction, and interchanges are 3 mi apart.A four-lane basic freeway segment on level terrain is being redesigned. The current roadway has 12 ft lanes with 4 ft shoulders. The proposed alignment would expand to six 11-ft lanes with 2 ft shoulders. The road carries 3000 vehicles in the peak hour in one direction, with 925 coming in the peak 15 minutes. The truck mix is 70/30 and makes up 10% of traffic. What is the density and LOS (level of service) before and after the proposed change?A six-lane freeway (three lanes in each direction) in mountainous terrain has 10-ft lanes and obstructions 5 ft from the right edge. There are zero ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The traffic stream consists of mostly commuters with a peak hour factor of 0.84, peak-hour volume of 2500 vehicles, and 4% recreational vehicles. What is the level of service?
- A six-lane divided highway (three lanes in each direction) is on level terrain with 6 access points per kilometer and has 3.6-m lanes, with a 1.2-m shoulder on the right side and a 0.6-m shoulder on the left side. The peak-hour factor is 0.80, and the directional peak-hour volume is 3,500 vehicles per hour. There are 5% large trucks and 3% recreational vehicles. A significant percentage of non-familiar roadway users are in the traffic stream (the driver population adjustment factor is estimated as 0.85). No speed studies are available, but the posted speed limit is 80.5 km/h. Determine the level of service.A six-lane urban freeway (three lanes in each direction) is on rolling terrain with 11-ft lanes, obstructions 2 ft from the right edge of the traveled pavement, and nine ramps within three miles upstream and three miles downstream of the midpoint of the analysis segment. The traffic stream consists primarily of commuters. A directional weekday peak-hour volume of 2300 vehicles is observed, with 700 vehicles arriving in the most congested 15-min period. If the traffic stream has 15% large trucks and buses and no recreational vehicles and at some point, further along the roadway there is a 6% upgrade that is 1.5 mi long. (assuming that the proportion of vehicle types and the peak-hour factor remain constant) Determine the FFS value in mi/hDetermine the PHF or Peak Hour FactorDetermine the fHVDetermine the value of vpA six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLW = 6.0 mph) 4 ft from the right edge of the traveled pavement (fLC = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? Blank 1 What is the peak-hour factor (3 decimal places)? Blank 2 What is the heavy-vehicle adjustment factor (2 decimal places)? Blank 3 What is the service flow rate (whole number, nearest 5)? Blank 4 What is the service measure value if the average speed of the traffic stream is 65 mph (one decimal place)? Blank 5
- A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLW = 6.0 mph) 4 ft from the right edge of the traveled pavement (fLC = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? What is the peak-hour factor (3 decimal places)? What is the heavy-vehicle adjustment factor (2 decimal places)? What is the service flow rate (whole number, nearest 5)? What is the service measure value if the average speed of the traffic stream is 65 mph (one decimal place)?A four-lane urban freeway segment has a peak demand volume of 3,500 vehicles per hour for the two eastbound lanes. The PHF is 0.95 and there are no trucks, buses or RVs because the freeway is classified as a parkway and such vehicles are prohibited. The segment has 12 ft lanes, no lateral obstructions, 3 ramps within the influence area, and meanders through some beautiful rolling terrain. Assuming the road will be used by commuters and those familiar with the road, what is the flow rate (pcphpl)? Provide your answer to the nearest integer.A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLw = 6.0 mph) 4 ft from the right edge of the traveled pavement (fic = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). 1.) What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? 2.) What is the peak-hour factor 3.) What is the heavy-vehicle adjustment factor? 4.) What is the service flow rate? 5.) What is the service measure value if the average speed of the traffic stream is 65 mph
- A four-lane rural freeway segment has a 510 m grade length of 2% upgrade followed by a 630 m grade length of 3%. The freeway has 3.4-m lane, 1.5m left-shoulder lateral clearances and interchanges spaced at every 25 km. During the peak hour, there are 6% trucks, 2% buses, 2% recreational vehicles and the rest are passenger cars. Driver population adjustment is determined to be 0.90, peak hour factor is 0.90 and the BFFS is 110 km/h. At present, the freeway operates at capacity during the peak hour in the direction in question. If an additional 3.4 m lane is introduced, and all other factors stay the same, what will be the new level of service?A six-Lane urban freeway (three lanes in each direction) is on rolling terrain with 11 feet lanes, obstructions to 2 feet from the right edge of the travel pavement, and eight ramps within three miles upstream and three miles downstream of the mid point of the analysis segment. The traffic stream consist primarily of commuters. A directional weekly peak our volume of 2300 vehicles is observed, with 700 vehicles arriving in the most congested 15-min period. If the traffic stream has 15% large trucks and buses and no recreational vehicles, determine the level of serviceAn existing urban freeway with 4 lanes in each direction has the following characteristics: peak hour volume (in the peak direction) of 7070 veh/h, trucks are 10% of peak hour volume, lane width = 11 ft, shoulder-width = 6 ft no interchanges or ramps along this section and the terrain type is rolling. g) Determine Vp h) Determine the base free flow speed i) Determine the free flow speed. Level of Service on a scale of A to E?