Mechanix is a machine shop and a paper manufacturing plant gave it a P100,000.00 budget to fabricate a machine part needed for their preventive maintenance program. There are two material options, steel, and alloy steel which have approximately the same weight per item which is 0.36 kg. Steel costs P60.50 per kg and alloy costs P 100 per kg. Two sets of lathe and milling machines

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter9: Pricing Construction Equipment
Section: Chapter Questions
Problem 8RQ
icon
Related questions
Question

Answer: 1,840

Provide the solution.

Mechanix is a machine shop and a paper
manufacturing plant gave it a P100,000.00 budget
to fabricate a machine part needed for their
preventive maintenance program. There are two
material options, steel, and alloy steel which have
approximately the same weight per item which is
0.36 kg. Steel costs P60.50 per kg and alloy costs P
100 per kg. Two sets of lathe and milling machines
will do the work with their corresponding operators
and each has an operating rate cost of P88.67
per
hour. Utilizing all available sets of machines, steel
can be fabricated at a rate of 20 pieces per hr and
alloy can be done 16 pieces per hr but needs a
special tool with a cost of P2000.00 good for 220
pieces of finished alloy part.
How much is the difference in terms of pcs of
STEEL to that of ALLOY type can be manufactured
by Mechanix, in pcs?
Choose the next whole number say for example,
23.2= 24 pcs or 23.6= 24 pcs
Transcribed Image Text:Mechanix is a machine shop and a paper manufacturing plant gave it a P100,000.00 budget to fabricate a machine part needed for their preventive maintenance program. There are two material options, steel, and alloy steel which have approximately the same weight per item which is 0.36 kg. Steel costs P60.50 per kg and alloy costs P 100 per kg. Two sets of lathe and milling machines will do the work with their corresponding operators and each has an operating rate cost of P88.67 per hour. Utilizing all available sets of machines, steel can be fabricated at a rate of 20 pieces per hr and alloy can be done 16 pieces per hr but needs a special tool with a cost of P2000.00 good for 220 pieces of finished alloy part. How much is the difference in terms of pcs of STEEL to that of ALLOY type can be manufactured by Mechanix, in pcs? Choose the next whole number say for example, 23.2= 24 pcs or 23.6= 24 pcs
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Crack detection
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,