Assume that the load is measured twice with a watt-hour meter which has a meter constant of 7.2 and the following data are obtained: Revolutions of disk Time interval for revolutions of disks First Reading 32 59 Determine the instantaneous demands and the average demand. Second Reading 27 40

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter11: Transient Stability
Section: Chapter Questions
Problem 11.19P
icon
Related questions
Question
Assume that the load is measured twice with a watt-hour meter which has a meter constant of 7.2
and the following data are obtained:
Revolutions of disk
Time interval for revolutions of disks
First Reading
32
59
Determine the instantaneous demands and the average demand.
Second Reading
27
40
Transcribed Image Text:Assume that the load is measured twice with a watt-hour meter which has a meter constant of 7.2 and the following data are obtained: Revolutions of disk Time interval for revolutions of disks First Reading 32 59 Determine the instantaneous demands and the average demand. Second Reading 27 40
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Stability Analysis in Power System
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning