At what height is it necessary to install guardrails? O Sec 26.3 (1) O Sec 26.3 (2) O Sec 26.3 (3) O Sec 26.3 (4)
Q: -:The critical path is
A: In the analysis of project duration . The critical path is defined as the path having the longest…
Q: To help with water drainage, sidewalks are slightly slanted toward the A contractor is…
A: Given data, Slope = 0.008 Width of sidewalk = 4 ftH How much higher is the outside edge of the…
Q: How did the architect and his design team, and the construction team solved or attended to the above…
A: During design phase: Its done based on axisymmetric conditions which is quite tough to analyse…
Q: Distinguish the three major classes of cable-stayed bridge designs.
A: There are major three types of classes of cable- stayed bridge as below, 1. Harp type 2. Fan type…
Q: A truck has to pass under an overhead parabolic arch bridge which has a span of 20 meters and is 16…
A: Introduction- Suspension bridges are utilised to transfer goods over vast distances due to their…
Q: A classroom building (Education facility) is to be designed and it is 48 ft tall. The site has Sps…
A: ASCE 7- Minimum design loads for buildings and other structure, American Society of civil engineers.…
Q: SITUATION. A three-story building has interior columns spaced 8-m apart in two perpendicular…
A: Axial load : The force operating on an item parallel to and on its axis is known as axial load. Due…
Q: A 10-meter long curved gate has a radius of 6 meters. If theta = 60 degrees, determine the…
A:
Q: Kindly summarise the Channel Tunnel's history, building process,
A: The Channel Tunnel, also known as the Chunnel or Eurotunnel, is a railway tunnel. It runs under the…
Q: Air flows isentropically in a variable area channel from section (1) section (1) is equal to (2.0).…
A:
Q: A building 40 ft high is located on a riverbank. A guard, 6 ft tall, is manning the roof while…
A: Given Data: Height of the building is HB=40 ft. Height of the guard 1 standing on the roof is hG1=6…
Q: ds and . Use LRFD and determine whether this
A:
Q: Find the grade resistance, to the nearest ten pounds, for a 2400-lb car traveling on a -2.4°…
A:
Q: What are limitation in Etabs ? Please answer the question according to your practice course
A: Note- Since you have asked multiple questions, we will solve the first question for you. If you want…
Q: 8. Which of the following statements about the setting of seismic joints is incorrect
A: During an earthquake, a complex building can be divided geometrically into smaller components that…
Q: 3. Determine the gutter and the downspout size requirement of the following roof detail: Assign 2…
A:
Q: Two-way slab supported by beams (h=600mm,bw=400mm) constricted of many panels (6mx7m). Find out the…
A: The minimum thickness of slab for αm>2 is given by: h=ln(0.8+fy1400)36+9β≥90 mm Where, ln = Clear…
Q: Determine the gutter and the downspout size requirement of the following roof detail: Assign 2…
A:
Q: There is a 26ft high parabolic arch that spans a parkway. Determine the width of the arch if the…
A:
Q: Discuss TWO (2) advantages of a cable-stayed bridge over a suspension bridge.
A: The two advantages of a cable-stayed bridge over a suspension bridge have to be discussed.
Q: 4) Determine the minimum path tree from zone 7 to all other zones.
A:
Q: ineering the subject is bridge engineering, A bridge is on freeway, its calculated span is 35m,…
A: given span l=35m grade-III highway
Q: What are the provisions in UBC-97 that NSCP did not fully adopt?
A: The National Structural Code of the Philippines (NSCP) and Uniform Building Code are the structural…
Q: What size pipe should be used to supply 1300 gpm so that the velocity does not exceed 3.0 ft/sec…
A:
Q: A shopping center is being designed for a location in Chicago. The building will be located in a…
A: Roof snow load would be completely depandent on the snow fall intensity of that perticular area. In…
Q: When are ground fault circuit interrupters (GFCI) required? O Sec 195.1 (1) O Sec 195.2 (a) (b) O…
A: Sections : 181 to 195.3 tells about the electrical hazards ....
Q: On one side, water stands level with the top of a vertical rectangular gate 4 ft wide and 6 ft high,…
A: Hydrostatic force: Hydrostatic force is defined as the force exerted by the liquid on a submerged…
Q: Define Pedestrian live loads
A: Live loads- These are the loads in addition to the self weight of the structure. For example-…
Q: A two-story reinforced concrete art museum is to be built using an unusual architecturaldesign. It…
A: The given data is as follows: Column spacing=5m to 8 m
Q: fence has a dimension of 6 meters long and 10 meters high including the portion below normal grade…
A: No.of block of 200*400mm^2 Total area 6*10m^2 10% wastage
Q: Explain what is the sucker deck principle for variable depth bridge decks?
A: Solution:- Sucker deck principle for variable depth bridge decks: In variable depth bridge deck, the…
Q: 9- The slope of sewer shall be : A-Given in the direction of natural slope of ground B-Given in the…
A: The slope of sewer shall be :- Given option A) Given in the direction of natural slope of ground B)…
Q: All installations shall be set back not less than forty-six hundredths (0.46) metre from the rear…
A: The given rule is used for providing encroachments on streets which states that:
Q: We have a 1.50m ladder. wide and in a single section, of the counterpass is 0.175m. If the stair has…
A: perpendicular dimension of this fig if see in 3D that is width of passage
Q: Act. Dur. 1-2 2-3 2-4 34 3-5 4-5 3. 5-6 Find total duration to finish the project And find critical…
A: The Program Evaluation Review Technique is a project scheduling tool for determining how long it…
Q: A 12 ft long wooden plank is used to make a ramp to a loading dock. If the incline of the ramp is…
A: Schematic diagram of the given problem as per the statement:
Q: The main span of Bridge A (2100 feet) is _____percent shorter than the main span of bridge B (4300…
A: Given data in question Main span A Main span B To find out Percentage shorter
Q: How long after leaving the pier will the boats be 1600 ft apart?
A:
Q: A pumper is pumping through 550 feet of single 2.5" hose. The line is laid up a 25 percent grade.…
A: Length of pipe = 550 feetDiameter of hose = 2.5"Grade = 0.25
Q: What distance must a ladder extend beyond of the step-off point? O Sec 78 (1) O Sec 80(a) O Sec 81…
A: As per Sec 82 (2)(a) , a ladder must extend beyond of step off point at a distance of 90cm.
Q: 2. In Mechanized Construction, please explain the construction process of “Precast Segmental…
A: When the bridges span in the range of 50 m - 250 m, the construction method of balanced cantilever…
Q: Select the correct answer using the following slab: 3m 6m ВЗ B1 (3 (2) B5 В4 (1 Floor slab Select…
A:
Q: 10. Design and draft a pedestrian refuge with two curb ramps according to Caltrans standards. Add…
A: Medians or refuge islands make a two-stage crossing for walkers, making it simpler and more secure…
Q: The four-story apartment building has 8 rooms, averaging 2.5 per room. d. Determine the minimum…
A: A trench is generally a hollow cut into the ground of the construction site and it is normally with…
Q: Sprinkler protection must be provided for exterior balconies in an apartment building of which…
A: Building : A building is a permanent construction that is generally roofed and walled. Rudimentary…
Step by step
Solved in 2 steps