Bill of Material for Office Table (1 required) required) Office Table Final Assembly Gross Requirements Scheduled Receipts Projected On-Hand Inv Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) Lot Size (48 required) MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most popular tables. The graphic above shows the bill of material for this item. Below are the MRP tables for the top-level assembly (the Office Table Final Assembly) and one of its sub-assemblies (the Table-Top Assembly Table-Top Assembly Gross Requirements Scheduled Receipts Projected On-Hand Inv Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) Lot Size Table Hinal Assembly 320 100 130 Support Assembly (1 required) 3/1 Center Support 150 8/1 8/8 8/15 8/22 3/29 200 200 500 Side Support required) 3/8 8/15 3/22 915 9/12 9/19 9/26 300 For the Office Table above, what are the Planned Order Receipts in the week of 8/8? Number 31/5 3/12 3/19 3/26 For the Office Table above (the first MRP table), what is the Projected On-Hand Inventory in the week of 9/197 Number For the Table-Top Assembly above, what are the Net Requirements in the week of 9/19? Number For the Table-Top Assembly above, what are the Planned Order Releases in the week of 9/5? Number

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Bill of Material for Office Table
Top Assembly
(1 required)
Bracket
(required)
Office Table Final Assembly
Gross Requirements
Scheduled Receipts
Projected On-Hand Inv
Net Requirements
Planned Order Receipts
Planned Order Releases
Lead Time (in weeks)
Lot Size
Table-Top Assembly
Gross Requirements
Scheduled Receipts
Projected On-Hand Inv
Net Requirements
Planned Order Receipts
Planned Order Releases
Wood Screw
(48 required)
Lead Time (in weeks)
Lot Size
MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most popular tables. The graphic above shows the bill of
material for this item. Below are the MRP tables for the top-level assembly (the Office Table Final Assembly) and one of its sub-assemblies (the Table-Top
Assembly
Final Assembly
320
1
100
130
2
50
Support Assembly
8/1
Center Support
(1 required)
150
8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26
200 200
500
300
800 400
Side Support
[2 required)
8/3 8/15
315 3/12 9/19 3/26
For the Office Table above (the first MRP table), what is the Projected On-Hand Inventory in the week of 9/19?
Number
For the Office Table above, what are the Planned Order Receipts in the week of 8/8?
Number
For the Table-Top Assembly above, what are the Net Requirements in the week of 9/19?
Number
For the Table-Top Assembly above, what are the Planned Order Releases in the week of 9/5?
Number
Transcribed Image Text:Bill of Material for Office Table Top Assembly (1 required) Bracket (required) Office Table Final Assembly Gross Requirements Scheduled Receipts Projected On-Hand Inv Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) Lot Size Table-Top Assembly Gross Requirements Scheduled Receipts Projected On-Hand Inv Net Requirements Planned Order Receipts Planned Order Releases Wood Screw (48 required) Lead Time (in weeks) Lot Size MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most popular tables. The graphic above shows the bill of material for this item. Below are the MRP tables for the top-level assembly (the Office Table Final Assembly) and one of its sub-assemblies (the Table-Top Assembly Final Assembly 320 1 100 130 2 50 Support Assembly 8/1 Center Support (1 required) 150 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 200 200 500 300 800 400 Side Support [2 required) 8/3 8/15 315 3/12 9/19 3/26 For the Office Table above (the first MRP table), what is the Projected On-Hand Inventory in the week of 9/19? Number For the Office Table above, what are the Planned Order Receipts in the week of 8/8? Number For the Table-Top Assembly above, what are the Net Requirements in the week of 9/19? Number For the Table-Top Assembly above, what are the Planned Order Releases in the week of 9/5? Number
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.