Calculate the cost
Q: Uusing the indices proved below compute the estimate of a house having 65,000 m2 of floor area, the…
A: Given, Cost index for Delhi = 1.20 Cost index for Agra = 1.14
Q: The success of the Roman Empire was largley due to the contrsuction of some 400,000 km of roads, of…
A: The Roman Empire was the post-Republican period of ancient Rome. As a polity, it included large…
Q: The time it takes to build a highway varies directly with the length of the road, but inversely with…
A: Time taken by 120 workers to build 9 miles of highway:
Q: Baguio City wants to build a new bypass between two major roads that will cut travel time for…
A:
Q: An equipment costing P250,000 has an estima life of 15 years with a book value of P30,00 at book…
A:
Q: Activity Predecessor Duration (days) Resources 3 K 3. 2 5. 7. 5. 3. 3 H. For Project given above,…
A: The network diagram for the project is as follows: Project Duration = 17 days. Critical Path =…
Q: A new route for 19000 trips will be open. Using the data below, what is the most likely mode of…
A: Given, A new route for 19000 trips v tij w tij t tij Fij ϕj Coefficient (a) 0.007 0.002…
Q: Q2. Compute the flow in the distribution network in Figure 1 with the help of Hardy Cross Method.…
A: Analysis of the water distribution system includes determining quantities of flow and head losses…
Q: According to the information in the following sagittal grid, it is required to find the duration of…
A:
Q: 4. It is the capacity of transportation infrastructures and modes over a geographically defined…
A: Transportation engineering is the utilization of innovation and logical standards to the plan,…
Q: Following is the population of a city as obtained from the census records. 2000 2010 21,400 32,800…
A:
Q: 1. The following is the population data of a city, available from past census records. Determine the…
A: Note- Since we only answer up to 3 sub-parts, we’ll answer the first3. Please resubmit the question…
Q: Three routes connect an origin to a destination with the following link performance functions: t_1 =…
A: Given data, t1 = 8+0.5x1 t2 = 1+2x2 t3 = 3+0.75x3 x1+x2+x3 = 4000
Q: If sales are 43,453, 44,251 and 38,501 for 2018, 2019 and 2020, what would you forecast for 2021…
A: Given:- 2018 sale 43 ,453 2019 sale 44,251 and 2020 sale 38,501 weight=0.82 To find:- forecast for…
Q: With the help of following data, estimate the future population of town in the year 2050 using: 1.…
A: Hi! Thank you for the question, As per the honor code, we are allowed to answer three sub-parts at a…
Q: The population of a city in previous consecutive decades were 600000, 720000, 815000, 1250000. The…
A:
Q: A suspension bridge was constructed for P 24M, after which it will have a major repair of P 5M every…
A:
Q: Consider the Poisson trip generation model in Example 8.4. Suppose that a household has five members…
A: Given data:- Annual income $150000 and retail employment 320. We have to determine the probability…
Q: Suppose the annualized cost of purchasing, fuelling and maintaining a compacter truck is given by…
A: Solution Given that Annualized cost(Rs/year)=1050000+21000V
Q: A new route for 19000 trips will be open, Using the data below, what is the most likely mode of…
A:
Q: Q3): Income from an operation has been decreasing uniformly for 5 years. If income in year 1 was…
A:
Q: 4 1 Trips 1 3 4 4 8 per 5 7 8 day Ey m 3
A:
Q: Create a linear schedule for the construction of a 20 mile long highway. The activities and their…
A:
Q: The population growth (P) at any time in a city is governed by the equation dP (B-Dr)P, where r is…
A: Given, B = 0.1 D = 10-6 Po = 10000
Q: Formulate a mathematical model to obtain the minimum time.
A: Given data: job time (hour) Job1 Job2 Job3 5 4 9 4 10 8 10 6 3
Q: Figure 6 Q/In Figure 6 up, if the height of the house from the street level is 60 cm, discuss how to…
A: The slope of the ramp used without damage to the car is 1 : 12. This slope provides the minimum…
Q: 3. Calculate the severity ratio of the recorded number of accidents in a certain city date from 2016…
A:
Q: MASS DIAGRAM Given below are the volumes of cut and fill along the length successive stations 100 m…
A:
Q: The growth and number of population in any city can be estimated with the following model growth:…
A: The growth model of a city is necessary to know various information about the city. It is very…
Q: Two routes connect an origin and destination with performance function t; = a; + (x¡/cj)² (with t's…
A: Consider the given equation, ti=ai+xici2 For route 1 from the table, t1=5+x122 ...1 For…
Q: Q1) For the project data shown in table below. Find the probability of completing the project in 34…
A: The Expected Time For Each Activitry is Given as : TE=O+4M+P6.Standard Daviation =P-O6
Q: Assuming user equilibrium before and during reconstruction, which proportion of the total demand…
A: Given data:- The flow X1 on route 1 before the reconstruction, X1=2.206×103 Vehicles The peak hour…
Q: A Car hire has two cars which it hires out day by day. The number of demands for a car in each day…
A:
Q: A building will be constructed at A as shown in the figure below. Calculate the estimated cost of…
A:
Q: conducted earlier this year and yielded the number of trips between each zone a in the table below.…
A: Given:- Kij=1 three different zones To find:- trip distribution calculation
Q: Discuss the ‘Logistic curve method’ for determining the future population of a locality. Derive a…
A:
Q: A transport engr. observed that in five zones of the city, the number of gas stations (Y) in…
A:
Q: Direction: solve and analyze each of the following problem in neat and orderly manner. Do this in…
A:
Q: 12.000 m 1600 m- Transport Costs (m3 /$) Effective Transport Distances (m) mj= Vx 1 l= 160 m2= Vx 2…
A: Given data Effective transport distance Transport cost To find Total cost
Q: At a construction project, the amount of material used in a day's construction is either 100 units…
A: Probability of using 100 units = P(100u) = 0.60 Probability of using 200 units = P( 200u)= 0.40…
Q: VEN A TRANSPORTATION PROBLEM WITH THE FOLLOWING COSTS, SUPPLY, DEMAND, FD HE OPTIMAL SOLUTION: TO…
A: The given information is we have to calculate the optimal solution of the above question
Q: if you need to build a road of length 1Km and width 16ft in three layers. calculate the total cost…
A:
Q: The total number of trips from ABC to XYC is 4500. All of the trips are made using car. The…
A:
Q: B. Find the weighted unit cost per square meter for the project data shown and determine the cost of…
A: Note- We’ll answer the first question since the exact one wasn’t specified. Please submit a new…
In the diagram of masses with a single peak given in the figure, draw quadratic transport lines and the total transport Calculate the cost. The transportation vehicles to be used on the construction site are T1, T2 and T3, transportation costs and effective transportation distances given in the table.
V value=9513
Step by step
Solved in 2 steps with 2 images
- Solve for the probability of using motor as mode of transport. U = a-0.02X1 - 0.05X2 MODE A X1 X2 CAR -0.21 37 30 MOTOR -0.34 30 40 BUS -0.15 45 27The following are the data of a simple summit mass haul diagram STATION MASS ORDINATE (m3) 0+000 -80 0+500 -130 Mass ordinate at initial point of the limit of free haul distance = +600 Mass ordinate at initial point of the economical haul distance = +200 Limit of Economic Haul = 450m Cost of Haul = P120.00 per cubic meter per meter station a. Determine the volume of borrow and its overhaul volume. b. Determine the length of overhaul if the cost of hauling is 00If 7 % is considered the minimum attractive rate of return which alternative should be selected year. A B 0. -$14500 -$23000 1. 5900. 9200 2 5900 9200 3 5900 9200
- At 7.8%, a bridge cost P220M with a life of 18 years. The bridge must be partially rebuilt at a cost if P90M at the end of each 18 years. Calculate the capitalized cost if an annual maintenance of P590,000 is required.A water line is to be built from point P to point S and must pass through regions where construction costs differ (see figure). The cost per kilometer (in dollars) is 3k from P to Q, 2k from Q to R, and k from R to S. Find x and y such that the total cost C will be minimized.at 6.2% a bridge cost P 220M with a life of 23 years. the bridge must be partially rebuilt at a cost of P 80 M at the end of each 23 years. calculate the capitalized cost if an annual maintenance of P 530000 is required. Express your answer in whole number.
- if you need to build a road of length 1Km and width 16ft in three layers. calculate the total cost of materials , labor and equipments used to make this road in 10 days. The rates are givenDetermine the length of overhaul if the cost of hauling is P192000.0I need a solution in 20 minutes, please / Subject : Transport phenomena
- For the project in Problem 10.7,sketch the $/cy vs, trucks curve(±2truck) if each excavator operates at $110/hr and each truck operates at$70/hr.For example, if you select 6 trucks, develop data points and acurve for 4,5,6,7,and 8 trucksThe distance covered by a tourist bus between Allahabad to varanasi and back on the same day is 150 kms. one way.The bus will make 8 trips in a month with an occupancy of 90%. The seating capacity of the bus is 50. The total passenger kms. in a month are: a.3,00,000 b.1,08,000 c.2,30,000 d.90,000On a road project, cost of borrow is 407.33 in pesos and cost of hauling is 38.89 pesos in meters of station. if the lenght of the free haul distance is 56 m, detrmine the lenght of economic haul in meters if stationing is standard at 20m.