Determine the time of operation of a 5-ampere, 3-second overcurrent relay having a current setting of 125% and a time setting multiplier of 0-6 connected to supply circuit through a 400/5 current transformer when the circuit carries a fault current of 4000 A. Use the curve shown in Fig below. 12 10 4 6 8 10 12 14 16 18 20 P.S.M.-> Operating time (Seconds) 0 2

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter10: System Protection
Section: Chapter Questions
Problem 10.30P
icon
Related questions
Question
Please solve step by step subject: power system protection
Determine the time of operation of a 5-ampere, 3-second overcurrent relay having a current
setting of 125% and a time setting multiplier of 0-6 connected to supply circuit through a 400/5
current transformer when the circuit carries a fault current of 4000 A. Use the curve shown in
Fig below.
12
8 10 12 14 16 18 20
600A
Operating time (Seconds)
10
2
10
2
4
6
P.S.M.
Transcribed Image Text:Determine the time of operation of a 5-ampere, 3-second overcurrent relay having a current setting of 125% and a time setting multiplier of 0-6 connected to supply circuit through a 400/5 current transformer when the circuit carries a fault current of 4000 A. Use the curve shown in Fig below. 12 8 10 12 14 16 18 20 600A Operating time (Seconds) 10 2 10 2 4 6 P.S.M.
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
DC Generator
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning