Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders. Embassy produces the engines for both models at its Des Moines, Iowa plant. Each EZ-Rider engine requires 6 hours of manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2,100 hours of engine manufacturing time available for the next production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-Sport frame is more complex and the supplier can only provide up to 240 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Lady-Sport model. A maximum of 800 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2,400 for each EZ-Rider produced and $1.000 for each Lady-Sport produced. (a) Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. (Let E represent the EZ-Rider model and let & represent the Lady-Sport model) 2.400 +1000 Max s.t. (E +(3 1✔ 2.100 L=240 2E + 2.5Ls 880 E, LE 0 (b) Solve the problem graphically. What is the optimal solution? (8.4)-(350.160 ✓ Engine manufacturing time Lady-Sport maximum Assembly and testing time

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 107P
icon
Related questions
Question

Please help with solving Part B

Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders.
Embassy produces the engines for both models at its Des Moines, Iowa plant. Each EZ-Rider engine requires 6 hours of manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2,100 hours of engine manufacturing time available for the next production period.
Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-Sport frame is more complex and the supplier can only provide up to 240 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each
Lady-Sport model. A maximum of 880 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2,400 for each EZ-Rider produced and $1,800 for each Lady-Sport produced.
(a) Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. (Let & represent the EZ-Rider model let & represent the Lady-Sport model.)
Max
s.t.
6
2,400€ +
1800
✓ E+ (3
X
]
✓
)²
4*2,100
Ls 240
2E+2.5Ls 880
E, LEO
(b) Solve the problem graphically. What is the optimal solution?
(E, L) =
350,160
✔
✓
Engine manufacturing time.
Lady-Sport maximum
Assembly and testing time
Transcribed Image Text:Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders. Embassy produces the engines for both models at its Des Moines, Iowa plant. Each EZ-Rider engine requires 6 hours of manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2,100 hours of engine manufacturing time available for the next production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-Sport frame is more complex and the supplier can only provide up to 240 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Lady-Sport model. A maximum of 880 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2,400 for each EZ-Rider produced and $1,800 for each Lady-Sport produced. (a) Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. (Let & represent the EZ-Rider model let & represent the Lady-Sport model.) Max s.t. 6 2,400€ + 1800 ✓ E+ (3 X ] ✓ )² 4*2,100 Ls 240 2E+2.5Ls 880 E, LEO (b) Solve the problem graphically. What is the optimal solution? (E, L) = 350,160 ✔ ✓ Engine manufacturing time. Lady-Sport maximum Assembly and testing time
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,