Estimate the time required (in hours) for a dragline to excavate material to be placed and compacted on a parking lot construction site, where 7200 CCM of material is needed. Use the following information: Dragline size = 1.53 m³ Swing angle = 90° Average depth of cut = 3.36 m Material sand and gravel M Job efficiency = 45 min/h Soil shrinkage = 12% Your Answer: Answer

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 7RQ
icon
Related questions
Question
Estimate the time required (in hours) for a dragline to excavate material to be placed
and compacted on a parking lot construction site, where 7200 CCM of material is
needed. Use the following information:
Dragline size = 1.53 m³
Swing angle = 90°
4
Average depth of cut - 3.36 m
Material sand and gravel
Job efficiency = 45 min/h
Soil shrinkage 12%
Your Answer:
Answer
Transcribed Image Text:Estimate the time required (in hours) for a dragline to excavate material to be placed and compacted on a parking lot construction site, where 7200 CCM of material is needed. Use the following information: Dragline size = 1.53 m³ Swing angle = 90° 4 Average depth of cut - 3.36 m Material sand and gravel Job efficiency = 45 min/h Soil shrinkage 12% Your Answer: Answer
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,