following data resulted from a time study made on a horizontal milling machine: Mean manual effort time per cycle: 4.62 min Mean cutting time (power feed): 3.74 min Mean performance rating: 115 percent Machine allowance (power feed): 10 percent Fatigue allowance: 15 percent   questions: 1.) What is the Basic Time for the manual effort?  2.) What is the Standard Time for the manual effort?  3.) What is the Standard Time for the machine

Precision Machining Technology (MindTap Course List)
2nd Edition
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Chapter8: Computer Numerical Control
Section8.2: Introduction To Cnc Turning
Problem 4RQ: Name three major collet styles used in toolholding. a. ________________________ b....
icon
Related questions
Question

Standard time & work sampling

 

The following data resulted from a time study made on a horizontal milling machine:

Mean manual effort time per cycle: 4.62 min

Mean cutting time (power feed): 3.74 min

Mean performance rating: 115 percent

Machine allowance (power feed): 10 percent

Fatigue allowance: 15 percent

 

questions:

1.) What is the Basic Time for the manual effort? 

2.) What is the Standard Time for the manual effort? 

3.) What is the Standard Time for the machine?

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Power Plant Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Precision Machining Technology (MindTap Course Li…
Precision Machining Technology (MindTap Course Li…
Mechanical Engineering
ISBN:
9781285444543
Author:
Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:
Cengage Learning