From the given soil profile, a surcharge load of 120 kPa is acting at the top of the ground surface. If the ground water table is located 2 m below the ground surface, determine the following: a. Primary consolidation settlement of the AP=120 kPa normally-consolidated clay layer. b. If a pre-consolidation pressure of 100 kPa existed before, what is the primary 2m Sand consolidation pressure for the over- V ground waưer table consolidated clay layer? Assume swell index to be 1/5 of the compression index. Sand 3m e=0.50 c. If the primary settlement was completed after 2 years, determine the secondary G#2.70 consolidation 3 years after the start of the primary settlement. Clay 2.5m 5m G=2,60 Pa LI 40%

Principles of Foundation Engineering (MindTap Course List)
8th Edition
ISBN:9781305081550
Author:Braja M. Das
Publisher:Braja M. Das
Chapter16: Soil Improvement And Ground Modification
Section: Chapter Questions
Problem 16.9P
icon
Related questions
Question
From the given soil profile, a surcharge load of 120 kPa is acting at the top of the ground surface. If the
ground water table is located 2 m below the ground surface, determine the following:
a. Primary consolidation settlement of the
normally-consolidated clay layer.
b. If a pre-consolidation pressure of 100 kPa
existed before, what is the primary
AP=120 kPa
2m Sand
consolidation pressure for the over-
V ground water table
consolidated clay layer? Assume swell index
to be 1/5 of the compression index.
Sand
3m
e=0,50
If the primary settlement was completed
C.
after 2 years, determine the secondary
G=2.70
consolidation 3 years after the start of the
primary settlement.
Clay
2.5m
5m
G=2.60
LL=40%
Transcribed Image Text:From the given soil profile, a surcharge load of 120 kPa is acting at the top of the ground surface. If the ground water table is located 2 m below the ground surface, determine the following: a. Primary consolidation settlement of the normally-consolidated clay layer. b. If a pre-consolidation pressure of 100 kPa existed before, what is the primary AP=120 kPa 2m Sand consolidation pressure for the over- V ground water table consolidated clay layer? Assume swell index to be 1/5 of the compression index. Sand 3m e=0,50 If the primary settlement was completed C. after 2 years, determine the secondary G=2.70 consolidation 3 years after the start of the primary settlement. Clay 2.5m 5m G=2.60 LL=40%
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Calculation of settlement
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning