Gasoline tanker truck. When gasoline is loaded onto a tanker truck or dispensed from it into an underground tank at a gasoline station, great care must be taken so that a spark from electrostatic charges does not ignite the vapor. That charge is produced by the sloshing of the gasoline as it moves through hoses or when the truck travels along a road. For gasoline vapor, the critical value for the spark energy is critical - 24 mJ. To avoid fire and explosion, the truck must be grounded before gasoline is poured into it or poured out of it. The grounding is by means of a conducting cable with a resistance of 9.930, with one end buried in the ground and the other clipped to the truck (see the figure below). If a truck has a 669 pF capacitance and an initial potential energy of 2.50 J, how much time is required to discharge the truck to the critical value of potential energy?

Introduction to Chemical Engineering Thermodynamics
8th Edition
ISBN:9781259696527
Author:J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Publisher:J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Chapter1: Introduction
Section: Chapter Questions
Problem 1.1P
icon
Related questions
Question
View Policies
Current Attempt in Progress
Gasoline tanker truck. When gasoline is loaded onto a tanker truck or dispensed from it into an underground tank at a gasoline station,
great care must be taken so that a spark from electrostatic charges does not ignite the vapor. That charge is produced by the sloshing
of the gasoline as it moves through hoses or when the truck travels along a road. For gasoline vapor, the critical value for the spark
energy is Ucritical = 24 mJ. To avoid fire and explosion, the truck must be grounded before gasoline is poured into it or poured out of it.
The grounding is by means of a conducting cable with a resistance of 9.930, with one end buried in the ground and the other clipped to
the truck (see the figure below). If a truck has a 669 pF capacitance and an initial potential energy of 2.50 J, how much time is required
to discharge the truck to the critical value of potential energy?
Number
Units
Saferack
Transcribed Image Text:View Policies Current Attempt in Progress Gasoline tanker truck. When gasoline is loaded onto a tanker truck or dispensed from it into an underground tank at a gasoline station, great care must be taken so that a spark from electrostatic charges does not ignite the vapor. That charge is produced by the sloshing of the gasoline as it moves through hoses or when the truck travels along a road. For gasoline vapor, the critical value for the spark energy is Ucritical = 24 mJ. To avoid fire and explosion, the truck must be grounded before gasoline is poured into it or poured out of it. The grounding is by means of a conducting cable with a resistance of 9.930, with one end buried in the ground and the other clipped to the truck (see the figure below). If a truck has a 669 pF capacitance and an initial potential energy of 2.50 J, how much time is required to discharge the truck to the critical value of potential energy? Number Units Saferack
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Recommended textbooks for you
Introduction to Chemical Engineering Thermodynami…
Introduction to Chemical Engineering Thermodynami…
Chemical Engineering
ISBN:
9781259696527
Author:
J.M. Smith Termodinamica en ingenieria quimica, Hendrick C Van Ness, Michael Abbott, Mark Swihart
Publisher:
McGraw-Hill Education
Elementary Principles of Chemical Processes, Bind…
Elementary Principles of Chemical Processes, Bind…
Chemical Engineering
ISBN:
9781118431221
Author:
Richard M. Felder, Ronald W. Rousseau, Lisa G. Bullard
Publisher:
WILEY
Elements of Chemical Reaction Engineering (5th Ed…
Elements of Chemical Reaction Engineering (5th Ed…
Chemical Engineering
ISBN:
9780133887518
Author:
H. Scott Fogler
Publisher:
Prentice Hall
Process Dynamics and Control, 4e
Process Dynamics and Control, 4e
Chemical Engineering
ISBN:
9781119285915
Author:
Seborg
Publisher:
WILEY
Industrial Plastics: Theory and Applications
Industrial Plastics: Theory and Applications
Chemical Engineering
ISBN:
9781285061238
Author:
Lokensgard, Erik
Publisher:
Delmar Cengage Learning
Unit Operations of Chemical Engineering
Unit Operations of Chemical Engineering
Chemical Engineering
ISBN:
9780072848236
Author:
Warren McCabe, Julian C. Smith, Peter Harriott
Publisher:
McGraw-Hill Companies, The