how to balance this using shortesr-time operation rule? and their efficiency too . Im not too sure of my diagram
Q: Your organization has decided to hire 2 new project managers. As you know when someone is hired…
A: Effective project estimation and planning play pivotal roles in the success of any organizational…
Q: Given the following information, compute the economic order quantity, annual holding cost, annual…
A: Find the given details below:
Q: You are newly employed by Shoprite in your area as a supply chain specialist. Shoprite wants to…
A: Total revenue R120,000,000Total no. of customers8,000,000Total no. of ordersR 2500,000Average order…
Q: TJ, Inc., makes three nut mixes for sale to grocery chains located in the Southeast. The three…
A: There are 3 products:Regular MixDeluxe MixHoliday Mix5 types of nuts are required to make the above…
Q: 15 X 10 6 15.5 1 3 (Max Flow Problem) 2 12 3 15 4.5 5 14.5 6 5 15.5 4.5 Z Find the maximum flow from…
A: Maximal-Flow The Maximal-Flow is subtype of Network Flow Model where networks have arcs with limited…
Q: Consider the following. Emotions are running wild during a current team meeting that you are…
A: When it comes to team collaboration, emotions can sometimes take centre stage, influencing meeting…
Q: Calculate the optimum order quantity of inventory for Playfair Limited over a one-year planning…
A: Storage costs: 3% Insurance = 1% Handling = 1% Obsolescence = 3% Opportunity costs = 10%D = Annual…
Q: True or False: “Groupthink” is a positive sign that shows a team is fully engaged and passionate…
A: Group decision-making is an important aspect of organizational dynamics. It involves a collective…
Q: What are certain contemporary challenges in the history of operations management.
A: In the organizational realm, operations management stands as a critical discipline steering the…
Q: Classify the cost elements shown below for the Impressive Printing Company into the proper quality…
A: Find the given details below:
Q: Develop a forecasting model, justifying its selection over other techniques, and project attendance…
A: AS IT APPEARS THAT WE HAVE A TREND IN INCREASING NO OF FANS EVERY YEAR. IN THIS CASE WE WILL USE THE…
Q: Discuss any five factors that Shoprite needs to consider when selecting its suppliers. Make use of…
A: The supply chain is comprised of all the steps that come into play in getting any product delivered…
Q: Consider the following service system. The average inter-arrival time is 10 minutes, and the…
A: The objective of the question is to calculate the flow rate of the process in customers per minute.…
Q: Compute the labor productivity for each of the weeks. On the basis of your calculations, what can…
A: WeekCrew size (C )Yards installed (Y)149623723492425053696252
Q: Required: 1.Using the organization chart of Mr. Osei Nyame Bekyere’s business, how would you put…
A: Nyame Bekyere Wholesale Supply and Distribution Company (NBWSDC) operates in the recreational…
Q: Dayton Electronics demands a part at a daily rate of 100 units. The lead time for replenishment is 5…
A: Safety stock is excess inventory that is held in reserve in case of unanticipated drops in supply or…
Q: How can be a successful flight attendant in the future? please answer in 30 mins thank you
A: Essential skills is important for fosters innovation and problem-solving. It's crucial in various…
Q: lease plot this on a graph
A:
Q: Homework Problem 2(Possible Answer 17) 5 X 12 P 3 Q 5 4 10 R S 10 N Find Maximum flow to Node Z from…
A: When considering the capacity limitations of the edges, the maximum flow in a flow network is the…
Q: It is summertime and your winter coat factory is trying to decide its production schedule and…
A: O = overtime , RE = regular employees, H = holding costRP = Regular production, D = demand Minimize…
Q: A chain of home health care firms in Louisiana needs to locate a central office from which to…
A: City trips per yearX co ordinate, Y coordinate ,…
Q: What are the consequences of a workplace with out much discipline? What are the benefits of having a…
A: Workplace discipline is a foundational component of organizational culture, influencing every facet…
Q: The Baton Rouge Police Department has five detective squads available for assignment to five open…
A: CasesSquadABCDE11034521281271221313252426841473727520712630
Q: Identify a policy Lucy could develop to reduce unpaid balances. Explain your answer. Describe two…
A: The objective of the question is to identify a policy that Lucy could develop to reduce unpaid…
Q: What sequencing rule should you use? For the rule you selected, find the best sequence using the…
A: MortgageProcessing Time (days)Due Date11545271431970410225163062357
Q: Acme has two manufacturing facilities (Plant1 and Plant2)for cement and has three customers (North,…
A: An example of a specialized linear programming (LP) problem is transportation LP, which addresses…
Q: List problems with hiring people from within an organization
A: Recruitment is an important part of human resource management. Recruiting the right people for the…
Q: What is the relationship of day-by-day performance evaluations and periodic performance reviews…
A: Management is an integral part of an organization. It helps in coordinating the efforts of various…
Q: Done Chapter 16 Assessment ( 25 eBook References ezto.mheducation.com Job V W X Y Z Processing Time…
A: An approach for scheduling jobs that gives priority to those with the lower processing times is…
Q: The following eight activities constitute an overall bar chart portrayal of a 4-month project. Two…
A: A project management methodology called earned value management (EVM) combines scope, expenses, and…
Q: You run a small grocery store and have the following fruits in storage: 1000 apples, 1500 oranges,…
A: The information provided is stated in the table below:Gift Set AGift Set BGift Set…
Q: by
A: a) To determine the number of skateboards required to break even, you need to cover the total costs,…
Q: Define work centre in supply chain along with an e
A: The supply chain is an important aspect for businesses to optimize costs, enhance product quality,…
Q: A post office has a single line for customers waiting for the next available postal clerk. There are…
A: The arrival rate is a measure of how quickly entities arrive at a system, and this concept is used…
Q: 1. Diesel is leaking from the ship onto the dock. Answer (circle one): interpretation sharing,…
A: The objective of the question is to identify the type of information sharing in each of the three…
Q: A manager wishes to build a 3-sigma range chart for a process. The sample size is five, the mean…
A: Givenx bar =45.75r bar = 10.30D3 = 0D4 = 2.115
Q: Find two similar products spot from two different manufacturers and list a set of design criteria to…
A: Exploring the intricacies of product design reveals a multifaceted undertaking. This process…
Q: Discussion Questions 1. If you were Christina, how would you design a pro- cess control plan to…
A: The objective of the question is to design a process control plan based on HACCP principles for…
Q: Worthington Hills grocery store has five regular checkout lines and one express line (12 items or…
A: The number of customers that can be processed daily if the store is running at full capacity is…
Q: Conduct a (9-quadrant) TOWS matrix analysis of the University of Professional Studies, Accra.
A: NOTE: We are allowed to do one question only in case of multiple questions. Please post the second…
Q: Need a Total productive maintenance total for this problem: The Tack articulation inspection is…
A: To calculate the Total Productive Maintenance (TPM) for the Tack Articulation Inspection problem, we…
Q: - Formulate the problem - Find the solution graphically
A: Let the number of Aqua Spa be xLet the number of Hydro-Lux be y.
Q: ABC has the following, master production plan Holding cost= 5$/unit/week Setup cost = 50$…
A: For any firm, inventory management is an essential component of supply chain management. A…
Q: A simple CPM network has five activities, A, B, C, D, and E. A is an immediate predecessor of B and…
A: The critical path is the path that takes the longest time to complete all the activities. The…
Q: How much must be spent on advertising to obtain a membership of 80 (000)?…
A: Regression equation: Y= 0.39X + 42.53 WhereY is the membershipX is the advertising
Q: TJ, Inc., makes three nut mixes for sale to grocery chains located in the Southeast. The three…
A: There are 3 products:Regular MixDeluxe MixHoliday Mix5 types of nuts are required to make the above…
Q: In this case study, we delve into the complex world of management within a global manufacturing…
A: A strong manufacturing sector is essential for national security, ensuring self-sufficiency in…
Q: The annual requirement of a part is 360,000 units. The order cost is $120 per order, the holding…
A: Annual requirements (D) = 360,000 unitsOrder cost (S) = $120 per orderUnit cost (C) = $2,500 per…
Q: Example of : Develop a communication management plan Define and enter the project name. Clearly…
A: The objective of this question is to develop a comprehensive communication management plan for a…
Q: Discuss the key components of a successful CRM implementation.
A: Customer Relationship Management (CRM) systems have become integral to businesses looking to enhance…
Can someone show me how to balance this using shortesr-time operation rule? and their efficiency too . Im not too sure of my diagram
Step by step
Solved in 3 steps with 1 images
Hello, thanks greatly but why did you use maximum time duration and not shortest time rule in finding the time to make one ball? ( D5 - A14 = 120 SEC )
- A dress-making operation is being designed as an assemblyline. Table 10-22 shows the tasks that need to be performed, theirtask times, and preceding tasks. If the goal is to produce 30 dressesper hour, answer the questions that follow the table. (a) Compute the cycle time.(b) Which task is the bottleneck?(c) What is the maximum output for this line?(d) Compute the theoretical minimum number of stations.(e) Assign work elements to stations, using the longest tasktime rule.(f) Compute the effi ciency and balance delay of yourassignment.Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40teddy bears per hour on its assembly line. The following information will assist in answering thequestions that follow:Task Information for Kiko Teddy BearWorkElementTask Description ImmediatePredecessorTask Time (inseconds)A Cut teddy bear pattern None 90B Sew teddy bear cloth A 75C Stuff teddy bear B 50D Glue on eyes C 20E Glue on nose C 15F Sew on mouth C 35G Attach manufacturer’s label B 15H Inspect and pack teddy bear D,E,F,G 40 d. What is the theoretical minimum number of workstations using the cycle time computed in” b “above? e. Assign tasks to workstations using the cycle time in “b” above. f. Calculate the efficiency and idle time percentage of the line.Burns Boats wants to assemble 50 boats per eight-hour day using a production line. Total task time for each boat is 45 minutes. a. (*) What is the tact time? What is the theoretical minimum number of workstations needed? b. (**) Suppose the longest individual task takes four minutes. Will Burns be able to accomplish its goal? Justify your answer.
- (Note: Task N is a dummy task. It must be included in the relationships, but its duration is 0. Be sure its duration is set to 0) Please see attached charts and diagram. Assign the following resources to the tasks. All resources will be full time. (Set the leveling to manual first). Task Resource Cost / Day A R1 200 B R2 300 C R3 300 D R4 300 E R2 300 F R4 300 G R1 200 H R5 200 I R6 400 J R5 200 K R1 200 L R3 300 M R2 300 N - - 2. Level if necessary. Then determine the new critical path and duration. 3. What is the total cost of the project (Fixed + Resource cost)? How much does the project need in the first, second, and third weeks?(Note: Task N is a dummy task. It must be included in the relationships, but its duration is 0. Be sure its duration is set to 0) Please see attached charts and diagram. Assign the following resources to the tasks. All resources will be full time. (Set the leveling to manual first). Task Resource Cost / Day A R1 200 B R2 300 C R3 300 D R4 300 E R2 300 F R4 300 G R1 200 H R5 200 I R6 400 J R5 200 K R1 200 L R3 300 M R2 300 N - - 1. Check for over-allocation. Which resources are over allocated? 2. Level if necessary. Then determine the new critical path and duration. 3. What is the total cost of the project (Fixed + Resource cost)? How much does the project need in the first, second, and third weeks?Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40teddy bears per hour on its assembly line. The following information will assist in answering thequestions that follow: Task Information for Kiko Teddy Bear Work Element Task Description ImmediatePredecessor Task Time (inseconds)A Cut teddy bear pattern None 90B Sew teddy bear cloth A 75C Stuff teddy bear B 50D Glue on eyes C 20E Glue on nose C…
- Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40teddy bears per hour on its assembly line. The following information will assist in answering thequestions that follow: Task Information for Kiko Teddy Bear Work Element Task Description ImmediatePredecessor Task Time (inseconds)A Cut teddy bear pattern None 90B Sew teddy bear cloth A 75C Stuff teddy bear B 50D Glue on eyes C 20E Glue on nose C…You are alone at home and have to prepare a bread sandwich for yourself. The following preparation activities and time taken are given in the table below: Task Description Predecessor Time (Minutes) A Purchase of bread - 20 B Take cheese and apply on bread A 5 C Get onions from freezer A 1 D Fry onions with pepper B,C 6 E Purchase sauce for bread - 15 F Toast bread B,C 4 G Assemble bread and fried onions F 2 H Arrange in plat G 1 Determine: a. While purchasing sauce, you met a friend and spoke to him for 6 minutes. Did this cause any delay in the preparation?The manufacturer of children’s toys designed a special toy truck that can be assembled in 8 basic steps.The required time and predecessors for the tasks can be seen in the table below. There are 7.5 productivehours available in a day and the manufacturer wishes to produce 400 units.Task Time (sec) PredecessorA 45 --B 50 AC 20 AD 55 AE 15 DF 65 DG 25 EH 35 B, C, F, G f. Calculate the efficiency of the line. g. Calculate the total idle time.
- Given the following data:ActivityPredecessorDuration (days)a-10b-15ca17db5eb4fc15gd7he8if12jg,h,i104.1 Draw the network (AON) and calculate and calculate the Critical Path. 4.2 Your organization has been appointed to co-ordinate the local government elections.Develop a Work Breakdown Structure (WBS) – graphical format for this project.A local toy maker uses a manufacturing line running eight hours a day that produces a toy which needs 7 tasks in total. The regular requirements are 100 toys. Task times are 2.73,2.01,2.13,2.0.2.11,2.71 and A,B,C,D,E,F and G, respectively, 2.95 minutes. However, there are precedent laws because of the essence of the substance that must be followed. This type of task has no predecessors; task B needs the completion of task A. To begin task C and task D, each task requires the completion of task B. Mission must be done until task E is defined. Goal F has to be done with Task D and Task Finally, task G will only start until task Fis has been completed. Since we extend the remaining job rule to balance the production line with the linkage broken in the longest working period, check circle is the task allocated to the THIRD stationCyclone Appliances has developed a new European-style convection oven that will be made on an assembly line. The schedule requires 80 ovens in an 8-hour day. The assembly includes seven tasks. The table below indicates the performance time and the sequence requirements for each task. Task Performance Time (minutes) Task must follow Task listed below A 1 B 2 A C 3 B D 2 B E 4 C, D F 1 E G 2 F i) What is the cycle time for this assembly operation? (3 marks) ii) What is the theoretical minimum number of workstations? (3 marks) iii) Draw the precedence diagram. (Please note that diagram can be drawn with the use of Microsoft shapes) (4 marks) b) iv) Briefly explain what "slotting" is. (4 marks) v) State the ethical issues which might arise with regard to slotting? (6 marks)