If the direct cost of materials, labor and equipment of CHB (4") laying work for 102.14 sq.m is Php 84,740.15. What is the unit cost per square meter if you are to include 15% profit?
Q: 55 kN 70 kN/m В C A 3 m 7 m
A:
Q: is the speed value which has the highest frequency of observation. is the 98th accumulated speed. 4-...
A: 4- Modal speed is the speed value which has the highest frequency of observation. Explanation: Mod...
Q: 4.31 As a valve is opened, water flows through the diffuser shown in Fig. P4.31 at an increasing flo...
A:
Q: Given: 1. Structural Component: Beam 300 mm x 400 mm Column 400 mm x 400 mm Slab thickness 110 mm 2....
A: Shear stress is a force that tends to produce material deformation by sliding along a plane or plane...
Q: Determine/derive the Shear and Moment Equations of each segment of the beam (kindly include the FBD)...
A:
Q: smooth transition section connects two rectangular channels as shown. The channel width increases fr...
A: Given: Channel width increases from 1.8 m to 2.1 m, and the water surface elevation is to remain the...
Q: A beam has a concentrated load (Pu) at midspan and has a fixed support at both ends. If the beam pro...
A: Given: The width of the beam is 271 mm. The height of the beam is 462 mm. The load Pu is 58.15 kN. T...
Q: Classify the following soil using the U.S. Department of Agriculture textural classification. Gravel...
A: Reference : USDA - US Department of Agriculture Textural Classification Refer the figure established...
Q: SITUATION. A column 400 mm x 400 mm square is supported by a 3 mx 3misolated spread footing whose fc...
A: Punching shear : Punching shear occurs when a concentrated force is delivered to a small area of a s...
Q: tem shown in Fig. P15.51. Determine the (a) pump operation point in terms of head and discharge, (b)...
A: Hydraulic loss: - It is a loss of energy in a fluid system in the container or pipe due to friction ...
Q: Provide a general description of crucible furnace used in Industrial Manufacturing of Steel.
A: Manufacturing is the process of transforming raw materials or parts into completed things using tool...
Q: Axial loads are applied to the compound rod that is composed of an aluminum segment rigidly connecte...
A: We have to determine the value of stress (in Mpa) in the bronze if given that P= 188 kN and the diag...
Q: A vertical 150-mm-diameter pipe leaves a water tank that has a surface elevation of 12m. Between the...
A: Velocity of flow at 0 elevation=Q/A Area=A=πd24 d=150/1000=0.15 m A=3.14×0.152/4=0.0177 m2 V=0.06/...
Q: 1.8 m 1.8 m 2 m
A: Uniform bar A cross section is when you cut an object in half and expose the shape inside. Uniform i...
Q: 5. Consider the embankment profile shown below. Determine the stress increase at points A and B. Bot...
A: Consider the load is distributed in the ration of 2H:1V
Q: A sanitary house drain is to be installed on a single-storey house to serve 1 water closet, 1 washba...
A: Discharge Q=50 gpm=0.0022×50=2ft/sec3 Velocity v=2ft/sec
Q: . A beam AB 8.5 m long is hinged at A and supported on rollers over a smooth surface inclined at 30°...
A:
Q: Calculate the active and passive earth pressures AND. determine the distance at which the net active...
A: Given: Dry density Saturated density Cohesion Angle of friction To find: Active earth pressure
Q: A steel rod 15mm diameter is held snugly (but without any initial stresses) between rigid walls by t...
A:
Q: Given: 1. Structural Component: Beam 300 mm x 400 mm Column 400 mm x 400 mm Slab thickness 110 mm 2....
A: The continuous and repetitive application of a load on an item or structural component in a horizont...
Q: In the diagram shown, the correct steps for drawing a triangle starting from point B in the AutoCAD ...
A: The steps are as: Draw the line of length 40.00 making an angle of 0° with horizontal. (Enter 40.00...
Q: What is the motion of a particle with respect to a fixed frame? Absolute Motion Independent Motion D...
A: To Determine The motion of a particle with respect to a fixed frame?
Q: Water is discharged under a sluice gate at a rate of 75 m3 /s into a frictionless, horizontal, recta...
A: Given data in question Discharge Width Downstream depth To find out Depth upstream Froude's numbe...
Q: A rectangular concrete beam 250 mm wide and 600 mm deep is pre-stressed by means of 16 high tensile ...
A: GIVEN, A rectangular concrete beam of width=250mmDepth=600mmDiameter of wire=7mmEffective pre-stres...
Q: The box slides down the slope described by the equation y = (0.05x²) m, where x is in meters. If v, ...
A:
Q: A square footing is to be used to support a 300mm by 300mm RC column loaded with 500 kN dead load an...
A:
Q: Two pipes 1 and 2 are connected in series. Pipe 1 is 200 mm in diameter and 300 m long while pipe 2 ...
A:
Q: Two plates, subjected to direct tension, each of 10 mm thickness and having widths of 100 mm and 175...
A:
Q: complete solution!! Calculate the minimum wall thickness for a cylindrical vessel that is to carry...
A: Given data, A cylindrical vessel,having Diameter= 2ft = 2×12 in = 24in. Pressure= P= 1500lb/in² All...
Q: Problem 1. Determine Xg and Yg SECOND TO THE LAST DIGIT DIMENSION OF YOUR STUDENT NO. USE USE DIMENS...
A:
Q: 3. A stratum of normally consolidated clay is 25 feet thick and the water content is measured as 50%...
A:
Q: 2. A manufacturing firm contemplates retiring an existing machine at the end of 2002. The new machin...
A:
Q: Given: E= 29x10^6 psi A= 2in^2 Determine the deformations members AB, BC, BE, DE and DF. Please show...
A: We have to determine the value of deformations in members AB, BC, BE, DE and DF as per the given dat...
Q: In the diagram shown, the correct steps for drawing a triangle starting from point A TO point C in t...
A:
Q: The T beam was designed to support a maximum factored moment of 880kN.m. f'c= 21 MPa, fy= 415 MPa, s...
A: Answer We are given Factored Moment = 880 Kn.m f'c = 21 Mpa fy = 415 Mpa concrete cover = 40 mm reb...
Q: A ball of mass 5kg and a block of 12 kg are attached by a light weight cord that passes over a frict...
A: Given, The ball of mass m1 is 5 Kg, The block of mass m2 is 12 Kg, g=9.8 m/sec2
Q: b) Determine the reaction forces and/or reaction moments at pin (You can neglect the height of the b...
A:
Q: A 12 mm thick plate is connected to two 8 mm thick plates, on either side through a 16 mm diameter p...
A:
Q: 34. Design the following simply supported interior beam using compression reinforcement as nart of t...
A:
Q: Shear and Moment Diagram: 600 lb/ft 1200 lb - ft 6 ft 4 ft 4 ft Point of Zero Shear: Value of Moment...
A:
Q: Discuss the importance of the proper selection of tubing, fitting, and hose installation in a hydrau...
A: It is very important to select the correct tubing, fitting and hose installation in a hydraulic syst...
Q: Two pipes 1 and 2 are connected in series. Pipe 1 is 200 mm in diameter and 300 m long while pipe 2 ...
A:
Q: 50 kips 20 kips/ft 560 kip-ft В D | F 6 ft 10 ft 6 ft 12 ft 6 ft
A:
Q: 7. The steel shaft is formed by attaching a hollow shaft to a solid shaft. Determine the value of to...
A: We have to determine the value of torque T that can be applied to the ends of the shaft without exce...
Q: The previous, zoom :command is used to Its usefulness is to enlarge the drawing page. This command i...
A:
Q: Problem 2 CE Board Nov 2018 If a spiral 80 m long connects with a 6.5 degrees circular curve, determ...
A:
Q: Use the method of sections to determine the forces in each member. State whether the forces is in te...
A: Given: The value of P is 20 kN. The value of Q is 12 kN.
Q: Question 8 Classify the following soil using the U.S. Department of Agriculture textural classificat...
A: The given data is shown below: Sand=45Silt=35Clay=20
Q: The angle between the prolongation of the preceding line and the forward line of a traverse is calle...
A:
Q: Bronze A= 400 mm? A = 600 mm? A= 300 mm? ЗР 2P 4P - 4 m -3 m- -5m-
A:
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- Discuss “Contract System” of CNW KPK for civil construction work from inviting of tender to allotment of workCalculate the cost per cu.m. to excavate trench if the volume to be excavated is 25 cu.m., using a 0.25 m3 bucket excavator Php 3,500.00 per hour including equipment operator and consumables. The output for a 0.25 m3 bucket excavator is 5 m3 per hour. One (1) spotter is also needed on site to guide the equipment with a labor rate of Php 101.50 per hour. Consider a 20% Contractor's Profit and 10% overhead cost for this activity. a. Php 936.30 / cu.m. b. Php 1,872.78/ cu.m. c. Php 3,662.40 / cu.m. d. Php 4,576.39 / cu.m.Under a unit-price contract with a 25 percent guarantee requirement of all unit prices quoted, the engineer’s estimate of earthwork quantities totals 9,270 cubic meters. If the actual quantities measured in the field for paypurposes total 10,650 cubic meters, is a change order justified for the quantity change?
- Indirect cost is Php 15,000.00 per day. Create an optimum time cost plan and identify how many days can the project be crashed.Task 2 Currently, contractors have over 6 projects on the books; however, the construction of a fully-fledged academy with specialist water sports facilities, valued at £12m, has been experiencing challenges. The challenges on the project relate to overspending, slow progress, and inadequate protocols for efficient processing of interim payments. Explain you could go about investigating the challenges on the fully-fledged Academy site. With a help of templates, tables, or diagrams, explain how you would institute a workable earned value analysis system to resolve the problems affecting the fully-fledged academy site. Create a site management structure that can implement commercial decisions to help the cash flow management on the fully-fledged academy project.Q1: Use the following data; draw arrow network diagram and manually level your resources so that you may not use more than nine laborers per day at any time. Laborers Duration IPA Activity 3 2 - A 2 4 A B 4 6 A C 3 9 A D 4 5 B E 2 7 B,C F 4 3 D,E,F G Civil Engineeing Subject=Construction Management
- How is the extended home office overhead is computed under the Eichleay formula?A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers’ paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are referred as project-in-charge by reliable connections and the contractor can only choose one; Firehouse Firm referred CJ, a very strict PIC who finishes 0.4% of the entire project every hour, but is only available 5 hours daily on weekdays. Has a rate of 1400php/hr. Bad English Firm referred Johnny, a very calm PIC who finishes 0.28% of the entire project every hour, but is only available 4 hours every day. Has a rate of 920php/hr. Steelheart Firm referred Miljenko, a very fine and attentive PIC who finishes 0.25% of the entire project…b) For the selected site, how much profit can be made if it is paid P362.25 per cubic meter delivered to the job site? Sol’n to bREVENUE = ?PROFIT = ?
- Part 2- Estimate Build Costs The land you are planning to buy for the brewery is for sale for $100,000. You are planning on contracting out the parts of the job yourself. From the various specialties you receive the following cost ranges: Specialty Optimistic Cost Most Likely Cost Pessimistic Cost Site Preparation & Foundation $15000 22500 31000 Structure 400000 525000 600000 Utilities 30000 37000 40000 Equipment Install 150000 200000 275000 Finishing 50000 70000 100000 Using three-point estimation, determine the cost estimate to build the brewery. Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.Estimating & Costing Civil Q Create a rough estimate for the building project with the total Based on the statistics below, the total building's plinth area is 800 square metres. i) Plinth area fee is Rs. 4500 per square metre Water supply costs are 7% of building costs. Cost of electrical and sanitary installations, each at 7% of the price of iv) The price of architectural features is 1% of the cost of the structure. v) The cost of streets and lawns, which is 5% of building costs. vi) P&S and contingency costs at 4% of building costs. Calculate the project's overall cost.Calculate for the labor cost per square meter of CHB laying considering the following data: Labor Productivity = 12 sq.m. per day Gang Rates: Labor Rate @ 1 mason per diem = Php 856.00 Labor Rate @ 1 Labor per diem = Php 581.00 a. Php 119.75 per sq.m b. Php 958.00 per sq.m c. Php 1,077.75 per sq.m d. Php 2,155.50 per sq.m