If you are the designer, how are you going to resolve disputes that may arise between the owner and the contractor.
Q: A rectangular concrete beam 120 x 300 mm is prestressed by straight cable, effective force 180 kN at…
A:
Q: Find Pace for data shown in table below which below represents speed spot study (SSS) data that…
A:
Q: For the loaded truss shown in Fig. 2 Calculate the internal axial force in the following members CF,…
A:
Q: Determine the moments of inertia about the y-axis of the circular area without and with the central…
A:
Q: 7 4 The precast floor system consists of a 150-mm-thick concrete slab carry its self weight as well…
A:
Q: -mm diameter steel bolts on 500 diameter bolt circle and eight 12 r diameter steel bolts on 300 mm d
A: Shear Stress = τ = F/A Max Torque = τ x J Where J is polar moment of inertia Steel Bolt 16 mm…
Q: A36 steel and 3/4 in bolts are used in the bolted splice shown in figure P4.48 . Consider yield,…
A: For A36 grade yeild stress Fy = 36 ksiUltimate stress = 58 ksisince all the members of connection…
Q: Directions: Find and locate the equivalent concentrated load(s) for the uniformly distributed…
A:
Q: Please
A:
Q: Can you explain how did that happen the one that is written in blue ballpen? Thank you
A: Explanation is required in some steps.
Q: Compute the equivalent radius of resisting section of 20 cm slab, if ratio of radius of wheel Load…
A: Given data, Slab thickness = 20 cm Wheel load distribution = 0.6
Q: 6 kN/m 3 m
A:
Q: PROBLEM 2: For the indeterminate beam shown below, construct the qualitative influence diagrams of…
A:
Q: A rectangular concrete beam 120 x 300 mm is prestressed by straight cable, effective force 180 kN at…
A: Given:- Rectangular concrete Beam is 120×300mm Effective force (P) = 180KN Eccentricity (e) =…
Q: Determine the equilibrium speed and cant to be provided on a BG curve of 3 degree if the speeds of…
A:
Q: 16 Q2) Fill the following blanks with suitable word(s): 1. The various types of heat-treating…
A: The Heat treating process: It is the combination of operations that involves the heating and cooling…
Q: The soil profile from a geological map of a project site obtained during a Phase I investigation is…
A: The steps to be followed: 1. Making plans for a soil exploration campaign. 2. Taking soil or rock…
Q: What is the factor of safety and where is the most critical failure surface? - Assume planar…
A: Solution: Planar surface analysis: The factor of safety: F=ccm Where: c = stability cm = mobilized…
Q: A pre tensioned concrete beam 100 mm wide and 300 mm deep, initial force of 150 kN at an…
A: Given 100 mm wide 300 mm deep Initial force P =150 kN at eccentricity e = 50 mm Moment of inertia…
Q: Three reservoir are connected as shown in figure 1. What is the discharge in each line? All pipes…
A: The given figure is shown below:
Q: Hydraulic jump occurs when supercritical flow converts to subcritical flow crossing critical flow.…
A:
Q: How :- Design the one way slab system
A:
Q: 04:Draw the shear and moment diagrams for the beam shown below, assume El is constant. Using: Moment…
A: A beam is given as shown in the figure, and it has been asked in the question to draw the shear…
Q: Problem 4 The 7/8 in diameter pins at A and C that support the structure are in single shear. Find…
A:
Q: A steel gear, with 80-mm diameter rod co nnected to it is used to transmit 600 HP a t 200 rpm. If…
A: Given that:- Diameter = d = 80 mm Length = L = 6m N = 200 rpm G = 83 GPa Power = 600 HP To determine…
Q: For the shown vertical curve. Determine: 1- Stations & Elevations for PVC & PVI 2- STA & Elev for…
A:
Q: The beam shown in the figure carries distributed I oads. Design the square (a x a) cross-section of…
A:
Q: Design a rigid boundary canal carrying 50 m³/sec. Take Manning's n= 0.014 and longitudinal slope of…
A:
Q: Calculate the total mass of CO2 in the atmosphere. State all assumptions. Compare this to the actual…
A: The total mass of CO2 in the atmosphere is not a fixed number, as it is constantly changing due to…
Q: A rectangular concrete beam 120 × 300 mm is prestressed by straight effective force 180 kN at…
A:
Q: How to make the three types of foundation below sustainable 1) Isolated foundation 2) Combined…
A: (1). Isolated foundation An isolated foundation is a type of foundation that supports a single…
Q: Determine the column effective length using the alignment chart for the columns (A, B, C, D, E) in…
A: Answer Since E is same for all the members we need to calculate G factors at the joints of the…
Q: Q.1 (a) A sluice gate in a 2.0 m wide horizontal rectangular channel is discharging freely as shown…
A:
Q: The beam shown in the figure below has the following properties:28-ft simple span f'c = 4000 psi…
A: Given, Compressive strength of concrete, f'c = 4000 psi Flexural strength of concrete, fr = 7.5f'c…
Q: Explain scouring in the sedimentation tank
A: Context: Scouring in sedimentation tank
Q: Q2) Fill the blank with suitable word or words: 1) The various types of heat-treating processes are…
A:
Q: A beam with a W360x45 section (Beam weight 45 kg) is used as a cantilever beam 7.5 m long. Find the…
A:
Q: Determine the overall column length that, if exceeded, would cause the column to buckle elastically…
A: Answer To calculate the overall column length which causes the column to buckle elastically before…
Q: A sluice gate in a 2.0 m wide horizontal rectangular channel is discharging freely as shown in…
A: The following are the given data. Width of channel, B=2 m Depth at a small distance upstream, y1 =…
Q: What techniques have been utilized by designers to solve these challenges? What specific sustainable…
A: SOM's Pertamina Energy Tower for Jakarta is the striking centerpiece of the new consolidated…
Q: What is causing the shift to large cities? Why are vertical cities emerging as a new urban form?…
A: The migration to major cities is being driven largely by two factors: the rise in population and the…
Q: 5. Determine the spring constant kl (N/m) if the spring constant of the whole system is 7.9 Nm. Use…
A:
Q: An A992 W14x48 14ft long beam column is pinned at the top and pinned at the bottom. It has a…
A: Given data Pn = 170 kips Mn = 32.5 kip-ft Condition = both ends are pinned
Q: What will be the metacentric height of a rectangular block having dimension 6 x 3 x 1.5 m if the…
A:
Q: If wheat requires 7.5 cm of water after every 28 days and the base period of wheat is 140 days, what…
A: Given data, Wheat requires 7.5 cm of water after every 28 days. Base period of wheat= 140 days…
Q: A soil element is loaded from state A to B. The stress values for the two states are A(p'=50 kPa,…
A: Given: Stress values at state A and B Volumetric strain increment=?
Q: Select the lightest ASTM A992 W-shape column to carry an axial dead load of 200 kips and a live load…
A: Select the lightest W-shape column
Q: Determine the largest force P (kN), directed as shown in the figure that can be applied to the…
A: Given:- The cross-sectional area (A) = 8000 mm2 The moment of inertia (I) = 50×106 mm4 The…
Q: A rectangular column section of 300 mm x 450 mm is reinforced with five steel bars of grade Fe-500…
A:
Q: A post tension beam section drawn below consists of three cables of 100 mm2 area. Initial…
A:
Pls Answer briefly. Thank you
- If you are the designer, how are you going to resolve disputes that may arise between the owner and the
contractor.
Step by step
Solved in 2 steps
- If the specifications are silent on the subject, but a contractor asks you, as the Resident Project Representative or inspector, how to perform the work, which of the following is the recommended procedure? a. Be ready to help by telling the contractor your opinions,because as a member of the construction team,it is your responsibility. b. Politely decline because construction means andmethods are the sole prerogative of the contractor.c. Direct the contractor how to perform the workbecause you know that if the contractor asked you,it meant that he or she did not know how to execute the work, and the project may otherwise suffer delays or failures.If you could help me with part f id greatly appreciate it, I will rate immediatley thank you.What is the Main Contractor responsible for?
- You are a licensed Civil Engineer. Your brother prepared a drawing plan and structural design for one of his projects. However, since he is not yet a Licensed CE, he requested you for your approval and signature of the same, offering you a certain amount as payment. Will you give your approval/signature for the said plan and design? Why?How do the Owners and the Contractors set the pace?What is one situation (that involves the owner) that may result in the general contractor’s failure to complete the work on schedule.
- A client plans to construct a manufacturing plant that involves multiple engineering disciplines. Calculate the total engineering fees including taxes based on the following: Mechanical Works, $1,540,000 Electrical Works, $1,780,000 Earth Works, $950,000 Civil Works, $2,125,100 Environmental Works, $1,325,000 Basis B fees = 14% There are no office feesDo not include the Contractor payment in the engineering fees. Taxes = 13%What are the responsibilities of a general contractor?What questions should the owner consider before giving the responsibilities to the contractor?