In Solver’s sensitivity report for the product mix model, the allowable decrease for available assembling hours is 2375. This means that something happens when assembling hours fall to 20,000 - 2375 = 17,625. See what this means by first running Solver with 17,626 available hours and then again with 17,624 available hours. Explain how the two solutions compare to the original solution and to each other.
Q: Bright Furnitures produces chairs and tables that go through M1 and M2. Making a 1 table and 1 chair…
A: The question is related to Linear Programming.The given problem is of Maximization. The details…
Q: A manufacturer produces both widgets and gadgets. Widgets generate a profit of $50 each and gadgets…
A: to solve this, we need to find the net profit by subtracting the setup cost incurred from the gross…
Q: A sporting goods store sells footballs, basketballs, and volleyballs. A football costs $7, a…
A: Given Information: Cost of a football = $ 7 Cost of a basketball = $ 15 Cost of a volleyball = $…
Q: For the product mix examples Discuss where you think the assumptions of a linear model are most…
A: Linear models use various assumptions such as linear relationship, independence, homoscedasticity,…
Q: A manufacturer produces both widgets and gadgets. Widgets generate a profit of $75 each and gadgets…
A: Given data:
Q: After entering the data shown below in cells B2, B3, B6, and B10, what values should appear in the…
A: Below is the solution:-
Q: ) John's Locomotive Works manufactures a model locomotive. It comes in two versions--a standard…
A:
Q: Use implicit enumeration to solve the following Integer Programing Model. min Z = 4x₁ - 8x₂ + 5x3 +…
A: Implicit enumeration: Implicit enumeration is based on the fact that each variable must equal 0 or 1…
Q: A firm wants to determine its production rate over the next twelve months. expected demand for its…
A: Decision Variable: Suppose Pi = Production in month-i for i=1,2,3...,12 Si = Shortage in month-i…
Q: The company produces two types of valves, each valve of the first type needs twice the time it takes…
A: Let the company (x) value of type-1 and (y) numbers value of the second type.
Q: A large sporting goods store is placing an order for bicycles with its supplier. Four models can…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: A manufacturer of two products (Widgets and Gadgets) makes a profit of $180 for each widget sold and…
A: Profit for each Widgets=$180 Profit for each gadget =$180 Waste charges of Widgets=3w2 (Where w is…
Q: Creative Sports Design (CSD) manufactures a standard-size racket and an oversize racket. The firm’s…
A: Given Information: Management has specified that at least 20% of the total production must be…
Q: Zippy motorcycle manufacturing produces two popular pocket bikes (miniature motorcycles with 49cc…
A:
Q: 1) When chef Paolo prices his speciality ‘pizza-n-all’ meal at £25, he sells 20 meals a day. When…
A: Given that - Price of ‘pizza-n-all’ meal = £25 Selling Quantity = 20 Total revenue = Price x…
Q: In the Dorian production model, suppose that the production quantity of compact cars must either be…
A: Given information, Production quantity of cars = 100 The greater quantity of car production = 1000…
Q: The operations manager of a mail order house purchases double (D) and twin (T) beds for resale. Each…
A: The LP modelThe decision variables are the number of double beds (D) and twin beds (T).The…
Q: A large sporting goods store is placing an order for bicycles with its supplier. Four models can be…
A: Linear programming or LP is one of the most simplistic methods to achieve optimization. It assists…
Q: FarmFresh Foods manufactures a snack mix called TrailTime by blending three ingredients: a dried…
A: Given Information: D = Number of ounces of dried fruit mix in the blend N = Number of ounces of nut…
Q: A company produces two types of tables a and be if it takes 2jours of cutting and 4hours of…
A: The problem can be solved by formulating an LPP. This will help in finding the optimal solution to…
Q: The American National Bus Lines is proud of its 8-week bus driver training program that it conducts…
A: The detailed solution to the question is given in the Step 2.
Q: A company needs to schedule the monthly production of a certain item for the next 4 months. The unit…
A: Given data, Production cost estimated for the first 2 month = $12 For the last 2 month = $14…
Q: A retail chain has 8 stores in a region supplied from 4 supply sources. Trucks have a capacity of…
A: Assumptions: All trucks travel full.Batch size shipped from each supplier to each store = 40,000…
Q: Discuss the similarities and differences between minimization and maximization problems using the…
A: Whenever we discuss maximizing or minimizing a capacity what we mean is what can be the greatest…
Q: Kevin runs a factory that makes stereo tuners. Each S100 takes 9 ounces of plastic and 6 ounces of…
A: There are two types of stereo tuners. One is S100 and the second is G150. Let, S = Number of units…
Q: Part B:Please solve the problem using the graphical method
A: Linear programming is a process to reach the best result such as maximum profit or lowest cost in a…
Q: A manufacturer produces both widgets and gadgets. Widgets generate a profit of $70 each and gadgets…
A:
Q: A company manufactures dog leashes that sell for $18.64, including shipping and handling. The…
A: Given, Total revenue = $18.64*Q Fixed cost = $24,131 Total variable cost = 9.18*Q Total cost =…
Q: Famous Money Designs (FMD) manufactures a standard size tennis racket and an oversize tennis racket.…
A:
Q: Based on Zangwill (1992). Murray Manufacturingruns a day shift and a night shift. Regardless of…
A: Given information, cost = 8000 Night shift = 45000 Demand Day 1 - 2000 Night 1 = 3000 Day 2 =…
Q: Do you think it is possible to depict this production function with an isoquant? Justify your answer…
A: Since you have asked multiple question, we will solve the first question for you. If you want any…
Q: Hello, Below is the question from Statistic Chapter Linear Programming and the solution is required…
A: Following is the excel model:
Q: Bullseye Shirt Company makes three types of shirts: athletic, varsity, and surfer. The shirts are…
A: Decision Variable: Suppose- Xij be the yards of fabric of the ith ingredient used in the jth…
Q: The optimal solution is to produce of the men's model in month 1, of the men's model in month 2,…
A: Production theory refers to the theory that helps in devising methods of production that lead to…
Q: A manufacturer produces both widgets and gadgets. Widgets generate a profit of $45 each and gadgets…
A: Objective Functions and Constraints: Based on the given details, we found the…
Q: G z Product Mix Example Product 3 P01 P02 P03 P04 Profit/unit: 26 35 25 37 Hours : Machine available…
A: The question is related to optimum product mix. The limiting factor is machine hours. First we have…
Q: A manufacturer produces both widgets and gadgets. Widgets generate a profit of $45 each and gadgets…
A: Converting last 2 constraints so that the variables stay on the LHS, 9999y1 - x1 >= 0 9999y2 - x2…
Q: company operates a farm on which sheep are raised. The farm manager has determined that for the…
A:
Q: Software EG, a retail company, orders two kinds of software from TeleHard Software. Annually,…
A: Product 1: Annual Demand = D = 800 Purchasing Cost = $30 per unit Holding Cost = H = $5 per unit per…
Q: INFORMA Furniture buys two products for resale: big shelves (B) and medium shelves (M). Each big…
A: Linear Programming is also called Linear optimization. Linear programming is used to find the best…
Q: A cash register contains only quarters and twenty dollar bills. It contains three times as many…
A: Let the cash register contain X quarter and Y twenty dollar bills.
Q: To maximize its profit, what prices P2 and P5 should Woolworths choose?
A: Woolworths has two types of milk packages 2 litres & 5 litres Two types of customers: Small…
Q: LEASE USE SIMPLEX METHOD. Thank you! Suppose a company manufactures different electronic components…
A: Let us assume x1 as the no.of components of A to be produced, x2 for B and x3 for C. It is also…
Q: A company produces three types of items. A singlemachine is used to produce the three items on a…
A:
Q: Answer the following true or false.a. The lead time is always less than the cycle time.b. The…
A: Note:- We are authorized to answer one question at a time, since you have not mentioned which…
Q: ABC Co. produces a product in the United Kingdom at a cost of £0.55 per unit which it then sells in…
A: Cost of Product =£0.55 per unit Selling Price= €1.25 per unit.
Q: Answer the following true or false e. For a finite production rate model, the optimal lot size to…
A: It is basically an extension of the EOQ model. The finite production run model is also called the…
Q: A manufacturer of two products (Widgets and Gadgets) makes a profit of $140 for each widget sold and…
A: The optimization model will be as follows: Max Z = overall net profit = 140W + 100G - 2W^2 - 2G^4W,…
Q: A manufacturer produces both widgets and gadgets. Widgets generate a profit of $45 each and gadgets…
A: Given, Profit Margin widgets-$45 Profit Margin gadgets-$55 Set-up cost Margin widgets-$300 Set-up…
In Solver’s sensitivity report for the product mix model, the allowable decrease for available assembling hours is 2375. This means that something happens when assembling hours fall to 20,000 - 2375 = 17,625. See what this means by first running Solver with 17,626 available hours and then again with 17,624 available hours. Explain how the two solutions compare to the original solution and to each other.
Step by step
Solved in 2 steps
- In a production process model such as Repco’s, certain inputs make no sense in the usage table (the range B7:D9 of the model). For example, suppose that, in addition to current usages, each unit of drug A -requires one unit of drug C. Why does this result in a nonsensical problem? What happens if you run Solver on it anyway? What happens if you run Solver on it after adding a constraint that the sum of the units produced (over all three drugs) must be at least 1?A company produces three types of items. A singlemachine is used to produce the three items on a cyclicalbasis. The company has the policy that every item isproduced once during each cycle, and it wants to determinethe number of production cycles per year that will minimizethe sum of holding and setup costs (no shortages areallowed). The following data are given:Pi number of units of product i that could be producedper year if the machine were entirely devoted toproducing product iDi annual demand for product iKi cost of setting up production for product ihi cost of holding one unit of product i in inventoryfor one yeara Suppose there are N cycles per year. Assuming thatduring each cycle, a fraction N1of all demand for eachproduct is met, determine the annual holding cost andthe annual setup cost.b Let qi* be the number of units of product i producedduring each cycle. Determine the optimal value of N(call it N*) and qi*. c Let EROQi be the optimal production run size forproduct i if…Can you show how to put it in Excel? XYZ store sells regular and premium nut mixes. Premium mix contains three quarters pound of cashews and one quarter of peanuts, and the regular mix has half pound of cashews and half pound peanuts per bag. The shop has 200 pounds of cashews and 300 pounds of peanuts to work with. Cashews cost $1.50 per pound, and peanuts cost 60 cents per pound. Premium mix will sell for $2.90 per pound, and the standard mix will sell for $2.55 per pound. The owner esimtes that no more than 200 bags of one types can be sold. What is the best combinations of products that maximizes profits? Make sure to create a feasible solution with countable number of products (no partials)
- FarmFresh Foods manufactures a snack mix called TrailTime by blending three ingredients: a dried fruit mixture, a nut mixture, and a cereal mixture. Information about the three ingredients (per ounce) is shown below. Ingredient Cost Volume Fat Grams Calories Dried fruit 0.35 0.25 cup 0 150 Nut mix 0.50 0.375 cup 10 400 Cereal mix 0.20 1 cup 1 50 Let D = number of ounces of dried fruit mix in the blend; N = number of ounces of nut mix in the blend ; C = number of ounces of cereal mix in the blend. The constraint that would ensure the mixture has no more than 25 grams of fat is:The Silly Nut Company makes two mixtures of nuts: Mixture A and Mixture B. A pound of Mixture A contains 12 oz of peanuts, 3 oz of almonds and 1 oz of cashews and sells for $4. A pound of Mixture B contains 12 oz of peanuts, 2 oz of almonds and 2 oz of cashews and sells for $5. The company has 1080 lb. of peanuts, 240 lb. of almonds, 160 lb. of cashews. How many pounds of each of mixtures A and B should the company make to maximize profit? (Hint: Use consistent units. Work the entire problem in pounds by converting all values given in ounces into fractions of pounds).An ad campaign for a new snack chip will be conducted in a limited geographical area and can use TV time, radio time, and newspaper ads. Information about each medium is shown below. Medium Cost per Ad # Reached Exposure Quality TV 500 10,000 30 Radio 200 3000 40 Newspaper 400 5000 25 Let T = number of TV ads; R = number of radio ads; and N = number of newspaper ads. The objective function that will produce the least total cost is:
- A company produces two types of tables a and be if it takes 2jours of cutting and 4hours of assembling to produce table a .it takes 10 hours of cutting and 4hours of assembling to produce table b. The company has at most 112 hours of cutting and 54 hours of assembly.the company profit is birr 60 for each table a and 170 for each table b .how many of each type of table should produces inorder to maximize profitFormulate and then solve a linear programming model of this problem, to determine how manycontainers of each product to produce tomorrow to maximize profits. The company makes fourjuice products using orange, grapefruit, and pineapple juice.Product Retail Price per QuartOrange juice $1.00Grapefruit juice .90Pineapple juice .80All-in-One 1.10The All-in-One juice has equal parts of orange, grapefruit, and pineapple juice. Each product isproduced in a one-quart size (there are four quarts in a gallon). On hand are 400 gallons of orangejuice, 300 gallons of grapefruit juice, and 200 gallons of pineapple juice. The cost per gallon is$2.00 for orange juice, $1.60 for grapefruit juice, and $1.40 for pineapple juice.In addition, the manager wants grapefruit juice to be used for no more than 30 percent of thenumber of containers produced. She wants the ratio of the number of containers of orange juice tothe number of containers of pineapple juice to be at least 7 to 5.LINGO SOFTWARE Consider a production-mix problem where we are concerned with what mix of four products we should produce during the upcoming week. For each product, each unit produced requires a known amount of production time on each of the three machines. Each machine has a certain number of hours of production time available per week. Each product provides a certain profit per unit produced. Figure 3S1.2 shows three types of data: machine-related data, product-related data, and data related to combinations of a machine and product. The objective is to determine how much to produce for each product so that total profit is maximized while not exceeding the limited production capacity of each machine. Requirement: Solve this problem in LINGO software.
- Four cleaning crews are available for a job that requires an area of 5000 square feet to be cleaned. Each cleaning crew charges a fixed cost that is only charged if the company is hired and a variable cost that is dependent on the number of square feet cleaned (see below). The job can be performed either by a single cleaner or by a combination of cleaners. Company A Cost = 0.01x2 + x + 25,000 Company B Cost = 0.14x2 - 11x + 20,000 Company C Cost = 0.07x2 - 6x + 3000 Company D Cost = 0.15x2 -10x +1000 Formulate and solve a mathematical programming model that will determine which crews to hire and how much (in square feet) of the job that each should do. What is the solution if, instead of 5000 square feet, we need to clean 10,000 square feet?A manufacturer produces two sizes of leather handbags. It takes longer to cutand dye the leather for the smaller bag, but it takes more time sewing the largerbag. The production constraints and profit for each type of bag is given in thetable below.Cutting anddyingSewing ProfitLarge bag 0.6 hr 2 hr $30Small bag 1 hr 1.5 hr $25The machinery limits the number of bags produced to at most 1000 per week. Ifthe company has a maximum of 900 hours per week available for cutting anddying and a maximum of 1800 hours available per week for sewing, determinethe number of each type of bag that should be produced weekly to maximiseprofit. (Assume that all bags produced are also sold).Please no written by hand and no emage Kindly create a spreadsheet from the problem description. Find the optimal solution using Excel Solver (Please show working with steps on a spreadsheet) : The Heinrich Company manufactures two types of plastic hangerracks (Foldaways and Straightaways) especially suited for mountingnear clothes dryers. Because permanent press clothing must be hungon hangers immediately after removal from the dryer, these items havebeen especially popular. However, there is some concern that thePreppie movement (popularized by its own handbook) will extinguishpolyester clothing; Heinrich is terribly interested in doing the best withthe resources it has while its products are still in demand. The firsttype of hanger rack, the Foldaway, requires 10 ounces of plasticmaterial and 0.3 hours of labor. Plastic costs Heinrich 10 cents anounce; labor costs Heinrich $20 per hour. The second type of hangerrack, the Straightaway, requires 15 ounces of plastic and 0.175…