Jamila wants to set up a manufacturing unit, so she meets with Rashid, a human resource manager at her company. Rashid explains that in order to decide on the human resource needs for the unit, they should conduct a workflow analysis. She suggests they start by defining the outputs of the process. To do this, what should Jamila define?
Q: Identify the problem in this case and suggest certain measures to overcome this problem.
A: Case Study Analysis As we can see, the new VP of operations has bought about operational changes…
Q: Naranjo Company designs industrial prototypes for outside companies. Budgeted overhead for the year…
A: 1). Overhead rate based on direct labor cost:- Budgeted direct labor hour = 26,000 Average wage rate…
Q: The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4.…
A: Capacity of any system is equal to its bottleneck process output
Q: Jack has asked you to calculate the following for Work Center 2. Calculate the percentage of…
A: The Input-Output Report is prepared by calculating the deviation of (actual-planned) for both inputs…
Q: The following diagram shows a four-step process that begins with Operation 1 and ends with Operation…
A: Given details: Operation 1: 12/Hour Operation 2: 15/Hour Operation 3: 11/Hour Operation 4: 14/Hour
Q: You are given the processing time (hour) in the following table: Jobs Machine A Machine B Machine C…
A: The minimum time in the given table is 1, which corresponds to job 4 on machine B. So the allocation…
Q: 1.Briefly discuss value analysis and how can this concept be expanded. 2.Using a plausible…
A: Value Analysis is a process through which the value of a product or process can be improved by…
Q: A TV factory plans to add production lines for its new product and plans to produce as many as 200…
A: This problem can be solved using: Minimum no. of station = Total task time / Cycle time Cycle time =…
Q: Use the Hungarian method to obtain a plan that will minimize the processing costs in the following…
A: Undesirable combination means Job that should not to be sent on a particular machine. Job 3 cannot…
Q: In the book Operations Management, Eleventh edition, Global edition Lee J.krajewski professor…
A: Note: I have answered for Part (a). Kindly post the remaining sub-parts separately. Quarter 2 has…
Q: A company is designing a product layout for a new product. It plans to use this production line…
A: The last task performed at the second workstation
Q: a. How many pies must be sold in order to break even? b. What would the profit (loss) be if 1,000…
A:
Q: Max has identified the need to make changes in the efficiency of his customer service department. In…
A: Organizational change can be stated as the process adopted by an organization or business to modify…
Q: A new facility is to be designed to produce plastic toys for children. There is no such an existing…
A: d. Continuous: Through the deployment of a continuous improvement programme, waste motion, lost…
Q: employees who work as a team on a variety of tasks; each employee works a full 40 hours a week.…
A: A Small Introduction about Management Management is the accomplishment of authoritative objectives…
Q: Tribal Systems, Inc., is opening a new plant and has yet todecide on the type of process to employ.…
A: We know that Total cost = Fixed cost + (Variable cost * no of units produced) We can compare the…
Q: You are the owner of a business and must perform the work of ten clients during the day. It has four…
A: Let the decision variables be Xij where X11 is a binary value which tells us if Collaborator A is…
Q: Several valueadded activities like combining freight and breaking bulk are done in warehouses.…
A: A value-added service (VAS service) goes beyond “typical” warehousing. Value add includes kitting,…
Q: A processor makes two components, A and B, which are then packaged together as thei nal product…
A: Operation management in an organization aims at providing the highest efficiency possible. It…
Q: A computer factory in Tangerang plans to increase production line for new products and plan to…
A: Here, This question includes several sub-parts, I have answered the first three sub-parts in the…
Q: A company assembles a product that consists of three pieces called AA, BB, and CC. The AA and BB…
A: The total hours which the machine can work in an year: 50 weeks * 5 days * 8 hours = 2000 hours…
Q: WorkPro is a small manufacturer. It uses a job process for production. The following sample of jobs…
A: "Since you have asked multiple questions, we will solve the first one for you. To get remaining…
Q: In a job shop, effective capacity is only 43 percent of design capacity, and actual output is 71…
A: This is Operations Management question, here, given information are as stated below: Actual output…
Q: Susan Williams runs a small Flagstaff job shopwhere garments are made. The job shop employs eight…
A: SOLUTION: NUMBER OF WORKERS 8 HOURLY WAGE $10 WORKING HOURS PER WEEK 45 PRODUCTION…
Q: A manager has 5 subordinates and 5 tasks in his department. Each subordinate differs in efficiency.…
A: Find the given details below: Given details: Subordinate Task 1 2 3 4 5 A 9 10 11 8 8 B 9…
Q: A Missouri job shop has four departments machin- ** 0.2 ing (M), dipping in a chemical bath (D),…
A: a)
Q: 6. Assume the following process is used in production of a product. The are 3 workers in this…
A: Given data: Task A = 3 min/unitTask B = 6 min/unitTask C = 1 min/unit
Q: A foreman supervises A, B, and five other employees. The foreman states that he spends twice as…
A:
Q: Jack has gathered the following information for Work Center 2, the work center that directly feeds…
A: Given data:
Q: local market research fim has just won a contract for several thousand small projects involving…
A: a) Production (output per hour) for each alternative: Output Total Hours Labor Hours Production…
Q: Give important management practices to achieve optimum hen-day production in layers. Explain briefly
A: HEN DAY PRODUCTION The percentage of hens in lay at any one time is accounted for by hen-day egg…
Q: Sue Helms Appliances wants to establish an assem-bly line to manufacture its new product, the Micro…
A: Given information Activity Duration Immediate predecessors A 10 B 12 A C 8 A, B D…
Q: For each of the problems listed, indicate precisely what or who would correspondto jobs and who or…
A: Hospital Emergency room is described as a department of a hospital that is associated with the…
Q: In a job shop, effective capacity is only 88 percent of design capacity, and actual output is 69…
A: Design capacity can be referred to as the maximum production rate that can be utilized from…
Q: The first step to accomplishing a task is planning. Now, planning encapsulates various factors. It…
A: Planning is a fundamental piece of each and every business, whether that is through spreading out an…
Q: Akeley is a student working toward a bachelor’s degree in finance. In order to gain some work…
A: As per the equity theory if an individual faces inequity will, in general, diminish his/her…
Q: Choose the one correct answer Which of the following activities should be reduced or eliminated in…
A: 1. Training of laborers, moving time of work in process materials from one work station to another…
Q: A TV factory plans to add production lines for its new product and plans to produce as many as 800…
A: Production rate=800 units per hour Total Task time=60 sec Daily production time=8 hour
Q: A manufacturer is designing a product layout for a new product productionIt plans to use a…
A: The cycle time is the amount of time it carries to achieve a specific task from start to finish. You…
Q: 5. A farmer wants to hire workers to pick 1600 bags of beans. Each worker can pick 10 bags per hour…
A:
Q: Akeley is a student working toward a bachelor’s degree in finance. In order to gain some work…
A: 1. The equity theory can be used to explain Joshua’s behavior. It is based on the idea that…
Q: Explain with the appropriate theory in organizational justice, how someone making GH¢30 an hour…
A: Organization justice is the recognition of fairness level in the treatment of an individual or…
Q: Mariah Enterprises makes a variety of consumer electronicproducts. Its camera manufacturing plant is…
A: Value of process output for component A =$175 Value of process output for component B =$140 The…
Q: The Sail-Sea is a boat manufacturer. The assembly location is available for the production of 60…
A: Given that: Production Time = 240 minutes Production Unit = 60 boats
Q: The 4M’s in the production operation are the materials, manpower, machine and money. A. True B.…
A: The production operation can be referred to as the manufacturing process which an organization…
Q: 2. Use the assignment method to obtain a plan that will minimize the processing costs in the…
A: Given data is This is a balanced assignment problem because the number of rows and columns is…
Q: You are the owner of a business and must perform the work of ten clients during the day. It has four…
A: This is an Assignment problem. Given are the execution times in the table for each…
2. Jamila wants to set up a manufacturing unit, so she meets with Rashid, a human
resource manager at her company. Rashid explains that in order to decide on the
human resource needs for the unit, they should conduct a workflow analysis. She
suggests they start by defining the outputs of the process. To do this, what should
Jamila define?
A) the processes that will be involved in manufacturing
B) the number of people required for production
C) the type of products that will need to be manufactured
D) the special equipment, facilities, and systems needed for production
E) the data and information needed by the work unit
Step by step
Solved in 2 steps
- The Prime Manufacturing Company is a garment factory that employs about 1250 employees of varied skills. About 75 percent are women who are mostly in the production department. Men employees are assigned in the maintenance department and as operators of machines used in garment production. Women are mostly in the sewing department, packaging, and quality control. Mr. Duztin Fernando was hired to head the HR department. Prior to his assignment at Prime Manufacturing Company, Rod was in a construction firm, a medium-sized organization. His main concern was preparing the payroll and handling employees’ records. The Human Resource Department is composed of 5 employees, a payroll clerk, a personnel assistant, two supervisors, and Mr. Duztin Fernando as Manager. The record of Duztin Fernando in his academic achievements is quite satisfactory. His Bachelor’s degree is in the field of Engineering. Performance in the previous employment is quite satisfactory. The…You are the owner of a business and must perform the work of ten clients during the day. It has four collaborators who are capable of carrying out the different jobs with the same level of quality. Depending on the skills of the different collaborators and the complexity of the jobs, the execution times are different and are presented in the following table: Cliente A B C D Arkitex 3 3 2 1 Bravia 3 3 4 3 Cúbika 4 5 6 4 Doratta 8 6 5 7 Evergreen 3 4 2 2 Fenix 5 6 3 4 Golden 3 3 1 4 Horizon 6 8 6 5 Icónika 5 5 5 5 Luxus 4 4 1 2 Now consider that each employee can carry out at most three jobs during the day. State and solve the problem thorugh excel solver.You are the owner of a business and must perform the work of ten clients during the day. It has four collaborators who are capable of carrying out the different jobs with the same level of quality. Depending on the skills of the different collaborators and the complexity of the jobs, the execution times are different and are presented in the following table: Client A B C D Arkitex 3 3 2 1 Bravia 3 3 4 3 Cúbika 4 5 6 4 Doratta 8 6 5 7 Evergreen 3 4 2 2 Fenix 5 6 3 4 Golden 3 3 1 4 Horizon 6 8 6 5 Icónika 5 5 5 5 Luxus 4 4 1 2 Solve it through excel solver.
- You are the owner of a business and must perform the work of ten clients during the day. It has four collaborators who are capable of carrying out the different jobs with the same level of quality. Depending on the skills of the different collaborators and the complexity of the jobs, the execution times are different and are presented in the following table: Client A B C D Arkitex 3 3 2 1 Bravia 3 3 4 3 Cúbika 4 5 6 4 Doratta 8 6 5 7 Evergreen 3 4 2 2 Fenix 5 6 3 4 Golden 3 3 1 4 Horizon 6 8 6 5 Icónika 5 5 5 5 Luxus 4 4 1 2 b) Now consider that each employee must carry out at least one job during the day. State and solve the problem throught excel solverThe project manager of the gas station project shown inFigure 7.3 needs to change the project’s WBS so that itcan be compared with cost and productivity informationcollected by the company. Level II should be changedto General Field Administration, Earthwork, ConcreteWork, Masonry Work, Metal Work, Carpentry, and Others.Complete the WBS of this project using this new arrangementfor Level II.Chris has been with Drake Manufacturing for five years and was recently promoted to the position of shift supervisor. He is still learning his new position, and it is important to him to be liked and respected. At the most recent operations review meeting, the director reported that the company’s financials are troublesome, and managers should be prepared for a major reorganization. Several jobs will be eliminated, but it had not yet determined which departments would be affected. 1.Should he tell his employees what happened so that they can prepare for the change?
- WAI knows from historical records that approximately 40percent of its labor is used in Department 101 and 60 percentis used in Department 102. Th e reverse is true of machine time;60 percent is used in Department 101 and 40 percent is used inDepartment 102.(a) Calculate the labor and machine hours needed inDepartment 101 for each period of the MPS developed inProblem 4.(b) Calculate the labor and machine hours needed inDepartment 102 for each period of the MPS developed inProblem 4.local market research fim has just won a contract for several thousand small projects involving data gathering and statistical analysis. In the past, the firm has assigned each project to a single member of its highly trained professional staff. This person would both gather and analyze the data Using this approach, an experienced person can complete an average of 10 such projects in an eight-hour day. The firm's management is thinking of assigning two people to each project in order to allow them to specialize and become more efficient The process would require the data gatherer to fill out a matrix on the computer, check it and transmit it to the statistical analysis program for the analyst to complete. Data can be gathered on one project while the analysis is being completed on another, but the analysis must be complete before the statistical analysis program can accept the new data. After some practice, the new process can be completed with a standard time of 20 minutes…A computer factory in Tangerang plans to increase production line for new products and plan to produce as many as XX0 units per hour. Production process, production time and production process to continue the next production process are described in the table below: (1 day = 8 working hours) production process production time Production process that follows the next production according to the list below A 12 - B 15 A C 8 A D 5 B,C E 20 D a. What is the cycle time for the production of the new product? ( note : in second )b. What is the minimum number of workstations?c. Draw a diagram of the production process.d. Is it with the diagram that you have drawn, the production process can go according to plan? Describe the process from each workstation you've created!
- 2.6. The Colonial House Furniture Company manufactures four-drawer oak filing cabinets in six stages. In the first stage, the boards forming the walls of the cabinet are cut; in the second stage, the front drawer panels are woodworked; in the third stage, the boards are sanded and finished; in the fourth stage, the boards are cleaned, stained, and painted with a clear finish; in the fifth stage, the hardware for pulls, runners, and fittings is installed; and in the final stage, the cabinets are assembled. Inspection occurs at each stage of the process, and the average percentages of good-quality units are as follows:Stage Average Percentage Good Quality 1 87% 2 91% 3 94% 4 93% 5 93% 6 96% The cabinets are produced in weekly production runs with a product input for 300 units. a. Determine…A TV factory plans to add production lines for its new product and plans to produce as many as 800 units per hour. The production process, production time, and the production process to continue the next production process are described in the table below: (1 day = 8 working hours) Production Process Production Time (s) The production process that follows the next production according to the list below A 12 - B 15 A C 8 A D 5 B,C E 20 D Based on the data above. a. What is the cycle time for the production of the new product? (note: in seconds)b. What is the minimum number of workstations?c. Draw a diagram of the production process.d. With the diagram that you have described above, can the production process run properly according to the plan? Explain the process of each workstation that you have created!.A Manager’s Woes Kyle Peschken has been a manager for the discount store Zelmart for the past two years. It’s time for his annual performance review, and Kyle would like to make a big impression on the corporate staff. Walking through the store, he makes a mental note of which departments need to be straightened, which ones need to be reorganized, and which employees he’d like to schedule during the week of his review. And then he sees it—blocking the aisles, creating commotion, and looking very unprofessional—the long line in the electronics department. It’s time to confront Chris, the sales clerk. “Chris, what’s the holdup here?” “I’mwaiting for a manager to approve this $120 check. And then I have to show this lady a digital camera from the display cabinet. She’s been waiting half an hour, and then . . . .” “Alright Chris . . . I can help out for a while . . .Two hours later, Kyle exited the electronics department disheartened. That’s no way for a store manager to spend his…