Field conditions require a highway curve to pass through a fixed point. Compute a suitable equal-tangent vertical curve and full-station elevations: Compute L, and the elevations at the full

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter15: Geometric Design Of Highway Facilities
Section: Chapter Questions
Problem 16P
icon
Related questions
Question

Field conditions require a highway curve to pass through a fixed point. Compute a suitable equal-tangent vertical curve and full-station elevations: Compute L, and the elevations at the full stations)

Grades of g1 = −2.50% and g2 = +1.50%, VPI elevation 2560.00 ft at station 315 + 00 Fixed elevation 2567.00 ft at station 314 + 00.

Show ALL of your work.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Follow-up Questions
Read through expert solutions to related follow-up questions below.
Follow-up Question

L = 1268.46 ft

2567 = 2560 + 2.5(L/2) − 2.5(L/2 − 1) + (1.5 + 2.5)/(2L) (L/2 − 1)2 L2 −13L+4=0

BVC Station = 308+65.77
BVC Elevation = 2575.8
Minimum elevation = 2,565.95 @ station 316+58.56.
 
This is what the textbook lists, I just wasn't sure how L was calculated and how the values in the table were calculated.
Station
321+34.23
321+00.00
320+00.00
319+00.00
318+00.00
317+00.00
316+00.00
315+00.00
314+00.00
313+00.00
312+00.00
311+00.00
310+00.00
309+00.00
308+65.77
x (Sta)
12.68
12.34
11.34
10.34
9.34
8.34
7.34
6.34
5.34
4.34
3.34
2.34
1.34
0.34
0
gl*x
-31.71
-30.86
-28.36
-25.86
-23.36
-20.86
-18.36
-15.86
-13.36
-10.86
-8.36
-5.86
-3.36
-0.86
0
r/2*x*x
25.37
24.02
20.28
16.87
13.76
10.97
8.50
6.34
4.50
2.97
1.76
0.87
0.28
0.02
0
Elevation
2,569.51
2,569.02
2,567.78
2,566.87
2,566.26
2,565.97
2,566.00
2,566.34
2,567.00
2,567.97
2,569.26
2,570.87
2,572.78
2,575.02
2,575.86
===
Transcribed Image Text:Station 321+34.23 321+00.00 320+00.00 319+00.00 318+00.00 317+00.00 316+00.00 315+00.00 314+00.00 313+00.00 312+00.00 311+00.00 310+00.00 309+00.00 308+65.77 x (Sta) 12.68 12.34 11.34 10.34 9.34 8.34 7.34 6.34 5.34 4.34 3.34 2.34 1.34 0.34 0 gl*x -31.71 -30.86 -28.36 -25.86 -23.36 -20.86 -18.36 -15.86 -13.36 -10.86 -8.36 -5.86 -3.36 -0.86 0 r/2*x*x 25.37 24.02 20.28 16.87 13.76 10.97 8.50 6.34 4.50 2.97 1.76 0.87 0.28 0.02 0 Elevation 2,569.51 2,569.02 2,567.78 2,566.87 2,566.26 2,565.97 2,566.00 2,566.34 2,567.00 2,567.97 2,569.26 2,570.87 2,572.78 2,575.02 2,575.86 ===
Solution
Bartleby Expert
SEE SOLUTION
Knowledge Booster
Highway surveys and location
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning