Master production schedule (MPS) states what .is to be made and when
Q: Typical standard form of contract enables the contract administrator to approve the extensions of…
A:
Q: true/false for all three questions 8) Design-Build projects have a higher cost than…
A: 8) True 9) True 10) True
Q: ct forms: NEC, FIDIC, GCC and JBCC
A: introduction While South African development experts may, previously, have "squeezed by" with an…
Q: Q: Figure I shows the activities of a small project with their details. 1. Draw the Gantt chart of…
A: Introduction- A project organization diagram depicts the logical and sequential link between…
Q: What is the process that engineering managers use to ensure that a project is completed on time and…
A: The process that engineering managers adopt to ensure that the project is completed on time and…
Q: A client engages the services of a civil engineer to design and prepare the plans for a proposed…
A: When an agreement is made between two parties and the conditions are established and the…
Q: 11 - The Following is(are) the responsibility(ies) of the project manager.
A: Building management is a professional company that offers project owners effective planning, cost,…
Q: Which type of information can be added to BIM? All the answers are correct Schedule Cost…
A: Answer:- All the answers are correct. BIM: Building Information Modelling is the holistic process of…
Q: assess how time, cost and quality affect the selection of a contract
A: Estimation and Costing : The practice of estimating or assessing a number through the estimation,…
Q: A contract can be terminated during the construction of a project. There are a variety of reasons…
A: To Explain: Three types of termination of contract which impact the cycle of project and…
Q: Defined as the work needed for the project to be done. It includes management, preparation, and…
A: The correct answer for the given question is option A i.e, Logistics The term logistics is defined…
Q: What is the Project Managers role under NEC contracts?
A: The Project Manager's role is a realistic guide for those who perform the function of Project…
Q: Explain the contractural relationship between the client with design and construction team with the…
A: The contractual relationship between the client with design and construction team is shown below:…
Q: What are the two types of project delivery systems for construction?
A: The two types of project delivery system for construction are: 1 Construction Manager at Risk (CMAR)…
Q: Explain the role of computers in “Estimation and Tender Documentation Preparation”. Explain Time…
A: Solution: Estimation and tender documentation are the most important of building projects. As they…
Q: in which construction contract is given an accurate price fo
A: Introduction- A construction agreement is a legally enforceable contract between two parties based…
Q: You have recently completed construction on a project that was contracted under a CCDC2 contract.…
A:
Q: In the execution of any project, the client's role and responsibility is to: O a. Prepare design…
A: Execution of project contains all the team members with their own roles. Without this, the project…
Q: Classify the under listed instances into the appropriate types of contracts. a. A standard form of…
A: Where Particular Conditions can be used, FIDIC contracts provide guidelines on project-specific…
Q: Determine the % of risk that has been transferred to sub-contractors given the following…
A: The given data is as follows: Materials=$150,000Labor=$158,000Equipment=$22,000Bonded…
Q: Valid contracts require an offer, an acceptance, and a consideration.Identify these elements in the…
A: A valid contractor is selected on the basis of qualification, type of work he has done, upto what…
Q: 8) Estimated cost depends on: a. Designed Plans and Drawings b. As built drawings c. Shop drawings…
A: Let us analyse the question in step 2.
Q: What is one situation (that involves the owner) that may result in the general contractor’s failure…
A: If contractor fails to complete work on time then owner has right to fire them. Owner can file claim…
Q: Identify the typical duties within an IT function and describe howthose duties should be segregated…
A: The installation of computer and its maintenance, it use to store transmit data is known as…
Q: (c) Describe the role of the following personnel in the management of a building project with…
A: Brief concept introduction- Construction management process- From start to finish, construction…
Q: Question One: (4) List any two advantages and two disadvantages cf MATRIX organization chart when…
A: Matrix organization chart are used in construction management.
Q: Differentiate contractual obligations of parties between a main contractor and an employer (client)…
A: A lawful consideration and lawful object and which are not expressly declared to be void by any…
Q: D3 justify the most appropriate production planning technique and it's suitability for a particular…
A: Producing is both an art and a science. When done correctly, it can make your operations run more…
Q: Your construction company plans to be involved in a Design and Build (DB) project. As a project…
A: Assuming, as a project manager of the company there are certain stages of the project staging and…
Q: what is difference between EPS, OBS AND WBS in construction engineering and management . DEVELOP an…
A: EPS - Enterprise Project Structures, is a hierarchical structure that represents how your projects…
Q: the 4 types of contracts according to its advantage to a project contractor. Discuss why by citing…
A: four types of contracts are as given below : 1. Lump sum contracts 2. Time and materials contracts…
Q: What are two major economic benefits of a good constructionprogram?
A: Among the research, there have been three stages to characterize construction. The building is…
Q: ) Briefly describe the role of the following personnel in the management of a building project: (i)…
A: a project consists of many stockholder and many processes. each process is done by a specific…
Q: A design–build firm may be (check all that apply):(a) a single firm with both design and…
A: Before giving any conclusion for the above problem, let’s understand the concept of design: In…
Q: The GFA method is usually used for estimating building services components. It can produce a very…
A: Area of upper part of building with dimensions 300×125mA1=300-0.23×125-0.23=37402m2Area of Middle…
Q: Q: Figure 1 shows the activities of a small project with their details. 1. Draw the Gantt chart of…
A: Gantt Chart can be prepared in excel also.
Q: Are the cost of delays caused due to the change orders?
A: Change order is an official request for additional time and funding for completion of the revised…
Q: A chew – good restaurants, Inc. grew from a highly successful first restaurant made from two…
A:
Q: The Iron Triangle of project management shows the objectives of time (delivery), quality and cost.…
A: The Main Components in the Triangle of a Project is,
Q: Project manager controls the project by adopting different tools and techniques. Elaborate by giving…
A: Project manager- PRoject manager one who prapare detailed planning for complete project cycle. He…
Q: Under a construction management (CM) contract,should the CM firm’s responsibilities normally begin…
A: The construction management has the responsibility of supervising the planning, scheduling,…
Step by step
Solved in 2 steps
- Question 2 As a Project Engineering had been tasked to make an analysis and to recommend to your company on the economic justification on option to purchase a used 250MT mobile crane. The decision is in between Brand X or Brand Y 250 MT mobile crane to be used for the company’s project construction activities as well as providing some rental business for three years. As the crane is not used for the whole time, 10-days a month it is being rented out. The Brand X is the newer crane which having better fuel efficiency and lower maintenance cost. Based on your data gathering, you have this information derived for the analysis. (Refer to the picture attached) a) Based on Return of Investment (ROI) evaluation, which unit will you recommend to your management to be purchased and why? b) From Life Cycle Cost (LCC) Analysis, would you Brand X or Brand Y crane? What is your recommendation and why? c) Based on the Minimum Acceptable Rate of Return (MARR), if the company hurdle rate is 20 %,…A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers’ paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are referred as project-in-charge by reliable connections and the contractor can only choose one; Firehouse Firm referred CJ, a very strict PIC who finishes 0.4% of the entire project every hour, but is only available 5 hours daily on weekdays. Has a rate of 1400php/hr. Bad English Firm referred Johnny, a very calm PIC who finishes 0.28% of the entire project every hour, but is only available 4 hours every day. Has a rate of 920php/hr. Steelheart Firm referred Miljenko, a very fine and attentive PIC who finishes 0.25% of the entire project…Given the following information, select the scraper type of that is the best option for the job based on economy. Also assume that the mobilization costs are $500, $700, and $1,300 for the 621, 631, and 657 scrapers, respectively.
- Question: a. Compute the overhaul volume. b. Compute the length of overhaul if total cost of hauling is P105,750.00 c. Compute the total cost of borrow.answer comple solution ASAPavmgamennproeessnmeofzzshours Theaysfi:ifi works 2 shifts of 8 hours each. There are breaks that 1 hours in each shift. The machines are subject to failure. They have a mean time to failure of 115 hours with a mean time to repair of 5.5 hours. Calculate the capacity of the workstation in jobs per day. Put your answer here (keep two decimal places): Jjobs per day.
- Service Output MethodGiven:FC = 800,000.00 pesosSV = 200,000.00 pesosn = 5 yearsOutput in year 1 = 300 unitsTotal output in 5 yrs = 1000 unitsa. Depreciation per unit = ?b. BV1 = ?Pls answer wt complete solution. Asap i need it in 15 minsThis is I'm uploading second time. Give me right solution with clear calculations