Monthly billing demand (0.85 divided monthly average PF). The PF penalty shall not be applied when the consumers monthly PF exceeds 0.85. Monthy demand charge = $20.00/kW. Monthly energy charge shall be: 2.50 cents/kWh for first 1000 kWh, 2.00 cents/kWh for next 3000 kWh and 1.50 cents/kWh for all 30-min monthly maximum KW demand multiplied by the ration of excess of 4000kWh. Assume that two consumer, as shown in Fig.01. Solve the monthly bill for each consumer.

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
Question
GENCO NL & NP utility company has the following Rate Structure
Monthly billing demand = 30-min monthly maximum KW demand multiplied by the ration of
(0.85 divided monthly average PF). The PF penalty shall not be applied when the consumers
monthly PF exceeds 0.85. Monthy demand charge = $20.00/kW. Monthly energy charge shall be:
2.50 cents/kWh for first 1000 kWh, 2.00 cents/kWh for next 3000 kWh and 1.50 cents/kWh for all
excess of 4000kWh. Assume that two consumer, as shown in Fig.01. Solve the monthly bill for
each consumer.
Distribution
substation bus
Customer's
meter (or
service)
Customer A
Customer B
30-min Dmas = 22 kW/month 30-min Dmax = 39 KW/month
WA = 7,000 kWh/month
PF, = 0.90 lag
WB = 7000 kWh/month
PF = 0.76 lag
Fig.01
Transcribed Image Text:GENCO NL & NP utility company has the following Rate Structure Monthly billing demand = 30-min monthly maximum KW demand multiplied by the ration of (0.85 divided monthly average PF). The PF penalty shall not be applied when the consumers monthly PF exceeds 0.85. Monthy demand charge = $20.00/kW. Monthly energy charge shall be: 2.50 cents/kWh for first 1000 kWh, 2.00 cents/kWh for next 3000 kWh and 1.50 cents/kWh for all excess of 4000kWh. Assume that two consumer, as shown in Fig.01. Solve the monthly bill for each consumer. Distribution substation bus Customer's meter (or service) Customer A Customer B 30-min Dmas = 22 kW/month 30-min Dmax = 39 KW/month WA = 7,000 kWh/month PF, = 0.90 lag WB = 7000 kWh/month PF = 0.76 lag Fig.01
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
HVDC
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,