On a Professional Construction Management contract, can the Construction Manager be cited by OSHA for safety violations or is the contractor the only one that can be cited by OSHA?

check_circle

Expert Answer

Step 1

A professional construction management contract is defined as an agreement that legally binds the owner of the project and contractor of a commercial building. In this contract, the manager is provided the responsibility of supervision of construction and engaging with sub-contractors.

Step 2

Professionally efficient construction managers and individuals are involved in the team of professional construction management who plan, design and construct the projects integrally.

T...

Want to see the full answer?

See Solution

Check out a sample Q&A here.

Want to see this answer and more?

Solutions are written by subject experts who are available 24/7. Questions are typically answered within 1 hour.*

See Solution
*Response times may vary by subject and question.

Related Civil Engineering Q&A

Find answers to questions asked by student like you
Show more Q&A
add
question_answer

Q: Determine the Factor of Safety of the exit gradient at point C, the length of flow path in square C ...

A: Given: Length of square, Ls = 2 m Void ratio, e = 0.6 The flownet is shown below, Figure (1)  

question_answer

Q: The hydraulic gradient of groundwater in a certain location is 2 m/100 m. Here, groundwater flows th...

A: It is required to calculate the actual velocity. Here, K is the hydraulic conductivity, and i is th...

question_answer

Q: How many residences can be served? If we have a compactor truck which has a capacity of 30 yd3, each...

A: It is required to calculate the number of residences that can be served based on the given condition...

question_answer

Q: Assume an adult male who weighs 50 kg drinks 2L of water every day and the absorption factor the che...

A: Given data:

question_answer

Q: Consider the soil profile shown in Figure 11.44 subjected to the uniformly distributed load, Ds, on ...

A: Given:The net applied pressure is 26 kN/m2.The height of the sand layer 1 (H1) is 1.83 m.The height ...

question_answer

Q: Please refer to the attached drawing. For the given case study, do the following: a. At points 1 and...

A: a) The labelled figure is shown below:

question_answer

Q: Identify four important items of information that should be included on atypical purchase order.

A: To determine: The identification of four important item of information that should be included on a ...

question_answer

Q: P 8 in h0.2 12 in 6 in Fig. P7.60, P7.61 7.60 The force P applied to the brake handle enables the ba...

A: Let C be the breaking torque acting on the drum and the maximum safe value of load be P.The tensile ...

question_answer

Q: You have been offered a job by a General Contractor as a Project Engineer to work with a team to put...

A:  The bid proposal of the construction project worth is $100 million.The steps to take as a project e...