PLEASE USE PTHREADS Write a program in C using PTHREADSthat will simulate the operations of the following Batch scheduling algorithms: PLease use Pthreads First-Come, First-Served Shortest Job First Your Program will implement threads for each algorithm plus the main thread. A linked list will be used to represent the list of jobs available to run. Each node will represent a Job with the following information: int PID Process ID int time; The time needed on CPU to finish executing Main thread: Your main code will request the user to input a list of jobs, and to fill the information in each job node until a sentinel value is reached, each data item will be stored in a separate node. Starts the FCFS thread, followed by SJF thread. Wait for both threads to finish before exiting. FCFS thread: The thread will simulate the First-Come, First-Served algorithm. Displays the data in a list in the order they were inserted. SJF thread: The thread will simulate the Shortest Job First algorithm. The thread will compare which job should run depending on the value of time inside the nodes. Display nodes according to the shortest job first order. You can remove nodes from the list after your display. Here is the sample output: Enter an ID and a value for a node to add to the list, Enter -1 to stop: 1 200 Enter an ID and a value for a node to add to the list, Enter -1 to stop: 2 30 Enter an ID and a value for a node to add to the list, Enter -1 to stop: 4 300 Enter an ID and a value for a node to add to the list, Enter -1 to stop: -1 -1   FCFS Job order: FCFS Jobs will be executed in the order they arrived: Linked List Contain the following values : Node ID 1 with value 200 Node ID 2 with value 30 Node ID 4 with value 300 FCFS Done   SJF Jobs Order: Shortest  Job to Run next is with ID: 2 and Time 30 Shortest  Job to Run next is with ID: 1 and Time 200 Shortest  Job to Run next is with ID: 4 and Time 300 SJF : All Jobs Completed All Threads complete

Computer Networking: A Top-Down Approach (7th Edition)
7th Edition
ISBN:9780133594140
Author:James Kurose, Keith Ross
Publisher:James Kurose, Keith Ross
Chapter1: Computer Networks And The Internet
Section: Chapter Questions
Problem R1RQ: What is the difference between a host and an end system? List several different types of end...
icon
Related questions
Question

PLEASE USE PTHREADS

Write a program in C using PTHREADSthat will simulate the operations of the following Batch scheduling algorithms: PLease use Pthreads

  • First-Come, First-Served
  • Shortest Job First

Your Program will implement threads for each algorithm plus the main thread. A linked list will be used to represent the list of jobs available to run. Each node will represent a Job with the following information:

  • int PID
    • Process ID
  • int time;
    • The time needed on CPU to finish executing

Main thread:

    • Your main code will request the user to input a list of jobs, and to fill the information in each job node until a sentinel value is reached, each data item will be stored in a separate node.
    • Starts the FCFS thread, followed by SJF thread.
    • Wait for both threads to finish before exiting.

FCFS thread:

    • The thread will simulate the First-Come, First-Served algorithm.
    • Displays the data in a list in the order they were inserted.

SJF thread:

    • The thread will simulate the Shortest Job First algorithm.
    • The thread will compare which job should run depending on the value of time inside the nodes.
    • Display nodes according to the shortest job first order.
    • You can remove nodes from the list after your display.

Here is the sample output:

Enter an ID and a value for a node to add to the list, Enter -1 to stop: 1 200

Enter an ID and a value for a node to add to the list, Enter -1 to stop: 2 30

Enter an ID and a value for a node to add to the list, Enter -1 to stop: 4 300

Enter an ID and a value for a node to add to the list, Enter -1 to stop: -1 -1

 

FCFS Job order:

FCFS Jobs will be executed in the order they arrived:

Linked List Contain the following values :

Node ID 1 with value 200

Node ID 2 with value 30

Node ID 4 with value 300

FCFS Done

 

SJF Jobs Order:

Shortest  Job to Run next is with ID: 2 and Time 30

Shortest  Job to Run next is with ID: 1 and Time 200

Shortest  Job to Run next is with ID: 4 and Time 300

SJF : All Jobs Completed

All Threads completed

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Recommended textbooks for you
Computer Networking: A Top-Down Approach (7th Edi…
Computer Networking: A Top-Down Approach (7th Edi…
Computer Engineering
ISBN:
9780133594140
Author:
James Kurose, Keith Ross
Publisher:
PEARSON
Computer Organization and Design MIPS Edition, Fi…
Computer Organization and Design MIPS Edition, Fi…
Computer Engineering
ISBN:
9780124077263
Author:
David A. Patterson, John L. Hennessy
Publisher:
Elsevier Science
Network+ Guide to Networks (MindTap Course List)
Network+ Guide to Networks (MindTap Course List)
Computer Engineering
ISBN:
9781337569330
Author:
Jill West, Tamara Dean, Jean Andrews
Publisher:
Cengage Learning
Concepts of Database Management
Concepts of Database Management
Computer Engineering
ISBN:
9781337093422
Author:
Joy L. Starks, Philip J. Pratt, Mary Z. Last
Publisher:
Cengage Learning
Prelude to Programming
Prelude to Programming
Computer Engineering
ISBN:
9780133750423
Author:
VENIT, Stewart
Publisher:
Pearson Education
Sc Business Data Communications and Networking, T…
Sc Business Data Communications and Networking, T…
Computer Engineering
ISBN:
9781119368830
Author:
FITZGERALD
Publisher:
WILEY