Problem 17-1A (Algo) Comparing plantwide rate method and activity-based costing LO P1, P3 Craftmore Machining reports the following budgeted overhead cost and related data for this year. Budgeted Cost Activity Assembly Activity Cost Driver $ 497,250 Direct labor hours (DLH) 76,500 Engineering hours (EH) 25,500 Machine hours (MH) Product design Budgeted Activity Usage 13,000 1,500 10,200 510 Electricity 63,750 Setups $ 663,000 Setup Total Required: 1. Compute a single plantwide overhead rate assuming the company allocates overhead cost based on 13,000 direct labor hours. 2. Job 31 used 320 direct labor hours and Job 42 used 600 direct labor hours. Allocate overhead cost to each job using the single plantwide overhead rate from part 1. 3. Compute an activity rate for each activity using activity-based costing. 4. Allocate overhead costs to Job 31 and Job 42 using activity-based costing. Activity Cost Driver Direct labor hours (DLH) Engineering hours (EH) Machine hours (MH) Setups Activity Usage Job 31 320 37 40 5 Job 42 600 43 70 7

Managerial Accounting
15th Edition
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:Carl Warren, Ph.d. Cma William B. Tayler
Chapter4: Activity-based Costing
Section: Chapter Questions
Problem 3BE: Activity-based costing: factory overhead costs The total factory overhead for Bardot Marine Company...
icon
Related questions
Topic Video
Question

I want answer for  1,2 and 4

 

I need help for requirement number 1 , 2 and 4

 

 


please answer within the format by providing formula the detailed working
Please provide answer in text (Without image)
Please provide answer in text (Without image)
Please provide answer in text (Without image)

Problem 17-1A (Algo) Comparing plantwide rate method and activity-based costing LO P1, P3
Craftmore Machining reports the following budgeted overhead cost and related data for this year.
Budgeted Cost
Activity
Assembly
Activity Cost Driver
$ 497,250 Direct labor hours (DLH)
76,500 Engineering hours (EH)
25,500 Machine hours (MH)
Product design
Electricity
Budgeted Activity Usage
13,000
1,500
10,200
510
63,750
Setups
$ 663,000
Setup
Total
Required:
1. Compute a single plantwide overhead rate assuming the company allocates overhead cost based on 13,000 direct labor hours.
2. Job 31 used 320 direct labor hours and Job 42 used 600 direct labor hours. Allocate overhead cost to each job using the single
plantwide overhead rate from part 1.
3. Compute an activity rate for each activity using activity-based costing.
4. Allocate overhead costs to Job 31 and Job 42 using activity-based costing.
Activity Cost Driver
Direct labor hours (DLH)
Engineering hours (EH)
Machine hours (MH)
Setups
Activity Usage
Job 31
320
37
40
5
Job 42
600
43
70
7
Transcribed Image Text:Problem 17-1A (Algo) Comparing plantwide rate method and activity-based costing LO P1, P3 Craftmore Machining reports the following budgeted overhead cost and related data for this year. Budgeted Cost Activity Assembly Activity Cost Driver $ 497,250 Direct labor hours (DLH) 76,500 Engineering hours (EH) 25,500 Machine hours (MH) Product design Electricity Budgeted Activity Usage 13,000 1,500 10,200 510 63,750 Setups $ 663,000 Setup Total Required: 1. Compute a single plantwide overhead rate assuming the company allocates overhead cost based on 13,000 direct labor hours. 2. Job 31 used 320 direct labor hours and Job 42 used 600 direct labor hours. Allocate overhead cost to each job using the single plantwide overhead rate from part 1. 3. Compute an activity rate for each activity using activity-based costing. 4. Allocate overhead costs to Job 31 and Job 42 using activity-based costing. Activity Cost Driver Direct labor hours (DLH) Engineering hours (EH) Machine hours (MH) Setups Activity Usage Job 31 320 37 40 5 Job 42 600 43 70 7
Complete this question by entering your answers in the tabs below.
Required 1 Required 2 Required 3 Required 4
Allocate overhead costs to Job 31 and Job 42 using activity-based costing. (Round "Activity Rate" to 2 decimal places.)
Activity
Assembly
Product design
Electricity
Setup
Total
Activity
Assembly
Product design
Electricity
Setup
Total
Allocate overhead to Job 31
Activity Usage
Allocate overhead to Job 42
Activity Usage
< Required 3
Activity Rate
Activity Rate
Required 4 >
Allocated Cost
$
0
Allocated Cost
0
Transcribed Image Text:Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Allocate overhead costs to Job 31 and Job 42 using activity-based costing. (Round "Activity Rate" to 2 decimal places.) Activity Assembly Product design Electricity Setup Total Activity Assembly Product design Electricity Setup Total Allocate overhead to Job 31 Activity Usage Allocate overhead to Job 42 Activity Usage < Required 3 Activity Rate Activity Rate Required 4 > Allocated Cost $ 0 Allocated Cost 0
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps

Blurred answer
Knowledge Booster
Performance measurements
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Managerial Accounting
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub
Survey of Accounting (Accounting I)
Survey of Accounting (Accounting I)
Accounting
ISBN:
9781305961883
Author:
Carl Warren
Publisher:
Cengage Learning
Principles of Accounting Volume 2
Principles of Accounting Volume 2
Accounting
ISBN:
9781947172609
Author:
OpenStax
Publisher:
OpenStax College
Financial And Managerial Accounting
Financial And Managerial Accounting
Accounting
ISBN:
9781337902663
Author:
WARREN, Carl S.
Publisher:
Cengage Learning,