Problem 2. Consider a freeway section with three lanes in each direction and with a length of 1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h, from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft (3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1 exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp density if using international (km) units). All transit buses will be removed from traffic since the transit service will be replaced by a commuter rail service. However, by removing buses, new additional passage car demand is expected. It is estimated that for each removed bus, 7 new passenger cars will be added to the original traffic volume of 3,800 veh/h. Question: Determine the change in speed and traffic density before and after the bus removal.

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter9: Capacity And Level Of Service For Highway Segments
Section: Chapter Questions
Problem 8P
icon
Related questions
Question
Problem 2. Consider a freeway section with three lanes in each direction and with a length of
1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h,
from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the
hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft
(3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1
exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp
density if using international (km) units). All transit buses will be removed from traffic since the
transit service will be replaced by a commuter rail service. However, by removing buses, new
additional passage car demand is expected. It is estimated that for each removed bus, 7 new
passenger cars will be added to the original traffic volume of 3,800 veh/h.
Question: Determine the change in speed and traffic density before and after the bus removal.
Transcribed Image Text:Problem 2. Consider a freeway section with three lanes in each direction and with a length of 1.25mi (2km) and a +5% grade. In this freeway, the directional peak-hour volume is 3,800 veh/h, from which 76 are trucks and 152 are transit buses. The maximum 15-min volume within the hour of analysis is 1,055 vehicles. The lane widths are 12 ft (3.6m), and shoulder widths are 10 ft (3.1m). There are 2 exit ramps and 1 entrance ramp in the 3 miles in the upstream section and 1 exit ramp and 2 entrance ramp in the 3 miles in the downstream section (consider the same ramp density if using international (km) units). All transit buses will be removed from traffic since the transit service will be replaced by a commuter rail service. However, by removing buses, new additional passage car demand is expected. It is estimated that for each removed bus, 7 new passenger cars will be added to the original traffic volume of 3,800 veh/h. Question: Determine the change in speed and traffic density before and after the bus removal.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Geometric design of highway facilities
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning