Determine the design flood discharge (allowing an increase of one third) for a bridge site with the following data : catchment area = 2 x 105 hectares, duration of storm = 8 hr, storm precipitation = 3 cm, time of concentration = 2 hr, gauged discharge for a past flood with average maximum daily rainfall of 18 cm was 3400 m3/sec.
Determine the design flood discharge (allowing an increase of one third) for a bridge site with the following data : catchment area = 2 x 105 hectares, duration of storm = 8 hr, storm precipitation = 3 cm, time of concentration = 2 hr, gauged discharge for a past flood with average maximum daily rainfall of 18 cm was 3400 m3/sec.
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter16: Highway Drainage
Section: Chapter Questions
Problem 17P
Related questions
Question
100%
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 5 steps with 5 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning