Question 31 A flownet is given below for flow under a concrete dam. The dam is 100 m long and has two 10 m sheet piles driven partially into the granular soil layer. The datum is at the surface of impervious bedrock, shown in the figure. The water level is H = 8 m above soil layer in the upstream and at the soil layer surface in the downstream. Calculate the uplift pressure at Point E under the dam. Unit: kPa 40 m Number of equipotential drops H: m 10 m 2 m sheet pile 10 m sheet pile 2 m 4. 11 B C D. 8.5 m (5.4) 6.4 6.9 (10.4) 7.4) 30 m (9.4) Datum C0.4 Impervious A F Scale: 0 10 m > E E.

Fundamentals of Geotechnical Engineering (MindTap Course List)
5th Edition
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter7: Seepage
Section: Chapter Questions
Problem 7.7CTP
icon
Related questions
Question
100%
Q31 Please provide justified answer asap to get a upvote
Question 31
A flownet is given below for flow under a concrete dam. The dam is 100 m long and
has two 10 m sheet piles driven partially into the granular soil layer. The datum is at
the surface of impervious bedrock, shown in the figure. The water level is H = 8 m
above soil layer in the upstream and at the soil layer surface in the downstream.
Calculate the uplift pressure at Point E under the dam. Unit: kPa
40 m
Number of
equipotential
drops
H: m
10 m
sheet pile
2 m
10 m
sheet pile o
2 m9
Y
4B
D
8.5 m
(5.4)
6.4)
(10.4)
3.5
30 m
(9,4)
(8.
Datum
C' 0.4
Impervious
A
F
Scale: 0
10 m
Vour Ancwor:
CS Scanned with CamScanner
Transcribed Image Text:Question 31 A flownet is given below for flow under a concrete dam. The dam is 100 m long and has two 10 m sheet piles driven partially into the granular soil layer. The datum is at the surface of impervious bedrock, shown in the figure. The water level is H = 8 m above soil layer in the upstream and at the soil layer surface in the downstream. Calculate the uplift pressure at Point E under the dam. Unit: kPa 40 m Number of equipotential drops H: m 10 m sheet pile 2 m 10 m sheet pile o 2 m9 Y 4B D 8.5 m (5.4) 6.4) (10.4) 3.5 30 m (9,4) (8. Datum C' 0.4 Impervious A F Scale: 0 10 m Vour Ancwor: CS Scanned with CamScanner
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Work breakdown structure
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning