Raytherm makes heat shrinkable tubing for the electronics industry. The following standards have been developed by the industrial engineering department of Raytherm for 1/4 inch heat shrinkable tubing: Raw Material Standard: Irradiated polyethylene plastic: .1 ounces per foot of tubing at 5 cents per ounce ($.80 per pound). Direct Labor Standard: .001 hours per foot at $25 per hour including benefits. During the month 900,000 feet of tubing was produced and the following costs were incurred: Actual raw material purchased: 12,250lbs (196,000oz) for a total cost of $9,500. Actual raw material used; 6,225 lbs (99,600oz) Actual direct labor incurred: Direct labor hours incurred: 980 Total payroll cost including benefits: $26,700 Required: Use the following equations to calculate the following variances: PPV (AP-SP)AQP MUV=(AQ-SQ)SP LRV=(AR-SR)AH+ LEV=(AH-SH)SR B STANDARD COST MATL. 5 SP SQA 0.05 0.1 PER FOOT 6 7 8 DIR LABOR SR SHA 96 9 25.00 0.001 11 ACTUAL TOTAL COST AMT PURCH. 12 Plastic $ 13 9,500 9,500.00 196,000 AMT USED 90,000 14 AMT USED 15 99,600 16 17 TOTAL COST HRS WK 18 Dir. Labor $ 26,700 980 19 26 MUV 29 LRV 32 LEV 21 TOTAL UNTS 23 PPV 24 222222222232233 900,000 (AP AQP) -(SP AQP) VAR 5 (AQU SP) (SQA SP) VAR 5 (AR*AH) (SR*AH) VAR 5 LO (AH*SR) (SHA*SR) VAR + 5
Raytherm makes heat shrinkable tubing for the electronics industry. The following standards have been developed by the industrial engineering department of Raytherm for 1/4 inch heat shrinkable tubing: Raw Material Standard: Irradiated polyethylene plastic: .1 ounces per foot of tubing at 5 cents per ounce ($.80 per pound). Direct Labor Standard: .001 hours per foot at $25 per hour including benefits. During the month 900,000 feet of tubing was produced and the following costs were incurred: Actual raw material purchased: 12,250lbs (196,000oz) for a total cost of $9,500. Actual raw material used; 6,225 lbs (99,600oz) Actual direct labor incurred: Direct labor hours incurred: 980 Total payroll cost including benefits: $26,700 Required: Use the following equations to calculate the following variances: PPV (AP-SP)AQP MUV=(AQ-SQ)SP LRV=(AR-SR)AH+ LEV=(AH-SH)SR B STANDARD COST MATL. 5 SP SQA 0.05 0.1 PER FOOT 6 7 8 DIR LABOR SR SHA 96 9 25.00 0.001 11 ACTUAL TOTAL COST AMT PURCH. 12 Plastic $ 13 9,500 9,500.00 196,000 AMT USED 90,000 14 AMT USED 15 99,600 16 17 TOTAL COST HRS WK 18 Dir. Labor $ 26,700 980 19 26 MUV 29 LRV 32 LEV 21 TOTAL UNTS 23 PPV 24 222222222232233 900,000 (AP AQP) -(SP AQP) VAR 5 (AQU SP) (SQA SP) VAR 5 (AR*AH) (SR*AH) VAR 5 LO (AH*SR) (SHA*SR) VAR + 5
Chapter8: Standard Costs And Variances
Section: Chapter Questions
Problem 4EA: Use the information provided to create a standard cost card for production of one glove box switch....
Related questions
Question
![Raytherm makes heat shrinkable tubing for the electronics industry. The
following standards have been developed by the industrial engineering
department of Raytherm for 1/4 inch heat shrinkable tubing:
Raw Material Standard:
Irradiated polyethylene plastic: .1 ounces per foot of tubing at 5 cents per
ounce ($.80 per pound).
Direct Labor Standard:
.001 hours per foot at $25 per hour including benefits.
During the month 900,000 feet of tubing was produced and the following costs
were incurred:
Actual raw material purchased:
12,250lbs (196,000oz) for a total cost of $9,500.
Actual raw material used;
6,225 lbs (99,600oz)
Actual direct labor incurred:
Direct labor hours incurred: 980
Total payroll cost including benefits: $26,700
Required:
Use the following equations to calculate the following variances:
PPV (AP-SP)AQP
MUV=(AQ-SQ)SP
LRV=(AR-SR)AH+
LEV=(AH-SH)SR](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F77ff0dc1-7282-4fa0-94cd-a91857c24dd6%2F46083f41-40e7-4236-8f5f-1f9af570ced4%2Fltr37n_processed.jpeg&w=3840&q=75)
Transcribed Image Text:Raytherm makes heat shrinkable tubing for the electronics industry. The
following standards have been developed by the industrial engineering
department of Raytherm for 1/4 inch heat shrinkable tubing:
Raw Material Standard:
Irradiated polyethylene plastic: .1 ounces per foot of tubing at 5 cents per
ounce ($.80 per pound).
Direct Labor Standard:
.001 hours per foot at $25 per hour including benefits.
During the month 900,000 feet of tubing was produced and the following costs
were incurred:
Actual raw material purchased:
12,250lbs (196,000oz) for a total cost of $9,500.
Actual raw material used;
6,225 lbs (99,600oz)
Actual direct labor incurred:
Direct labor hours incurred: 980
Total payroll cost including benefits: $26,700
Required:
Use the following equations to calculate the following variances:
PPV (AP-SP)AQP
MUV=(AQ-SQ)SP
LRV=(AR-SR)AH+
LEV=(AH-SH)SR
![B STANDARD COST
MATL.
5
SP
SQA
0.05
0.1
PER FOOT
6
7
8 DIR LABOR
SR
SHA
96
9
25.00
0.001
11 ACTUAL
TOTAL COST
AMT PURCH.
12 Plastic
$
13
9,500
9,500.00
196,000
AMT USED
90,000
14
AMT USED
15
99,600
16
17
TOTAL COST
HRS WK
18 Dir. Labor
$
26,700
980
19
26 MUV
29 LRV
32 LEV
21 TOTAL UNTS
23 PPV
24
222222222232233
900,000
(AP AQP)
-(SP AQP)
VAR
5
(AQU SP)
(SQA SP)
VAR
5
(AR*AH)
(SR*AH)
VAR
5
LO
(AH*SR)
(SHA*SR)
VAR
+
5](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F77ff0dc1-7282-4fa0-94cd-a91857c24dd6%2F46083f41-40e7-4236-8f5f-1f9af570ced4%2Fzyy84t7_processed.jpeg&w=3840&q=75)
Transcribed Image Text:B STANDARD COST
MATL.
5
SP
SQA
0.05
0.1
PER FOOT
6
7
8 DIR LABOR
SR
SHA
96
9
25.00
0.001
11 ACTUAL
TOTAL COST
AMT PURCH.
12 Plastic
$
13
9,500
9,500.00
196,000
AMT USED
90,000
14
AMT USED
15
99,600
16
17
TOTAL COST
HRS WK
18 Dir. Labor
$
26,700
980
19
26 MUV
29 LRV
32 LEV
21 TOTAL UNTS
23 PPV
24
222222222232233
900,000
(AP AQP)
-(SP AQP)
VAR
5
(AQU SP)
(SQA SP)
VAR
5
(AR*AH)
(SR*AH)
VAR
5
LO
(AH*SR)
(SHA*SR)
VAR
+
5
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Recommended textbooks for you
Principles of Accounting Volume 2
Accounting
ISBN:
9781947172609
Author:
OpenStax
Publisher:
OpenStax College
![Managerial Accounting](https://www.bartleby.com/isbn_cover_images/9781337912020/9781337912020_smallCoverImage.jpg)
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub
Principles of Accounting Volume 2
Accounting
ISBN:
9781947172609
Author:
OpenStax
Publisher:
OpenStax College
![Managerial Accounting](https://www.bartleby.com/isbn_cover_images/9781337912020/9781337912020_smallCoverImage.jpg)
Managerial Accounting
Accounting
ISBN:
9781337912020
Author:
Carl Warren, Ph.d. Cma William B. Tayler
Publisher:
South-Western College Pub