The City of Forty-Five (population 465,565) has requested your assistance in evaluating its solid waste collection system. Determine the mean time per collection stop plus the mean time to reach the next stop, the number of pickup locations per load, and the minimum number of trucks the city must own. The City of Forty-Five collection data are as follows: Average truck capacity = 12.5 m3; Average observed compaction ratio = 2.87 Crew size = 2;  Number of pickups = 1 /wk (no rear-of-house service) Average number of cans per stop = 2.63/wk at 0.1136 m3/can Average number of residents per stop = 5 Average uncompacted density = 105.76 kg/m3 Average transport time to disposal site including delays and dumping = 1.78 h/trip Average number of trips to disposal site = 2/d; Rest breaks = 2 at 28.0 min Average maintenance downtime = 37.0 min/d; Average workday = 8.00 h Average percent of trucks out of service for major repairs = 15.0% Number of workday per week = 5

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter2: Municipal Solid Waste Characteristics And Quantities
Section: Chapter Questions
Problem 2.14P
icon
Related questions
Question
  • The City of Forty-Five (population 465,565) has requested your assistance in evaluating its solid waste collection system. Determine the mean time per collection stop plus the mean time to reach the next stop, the number of pickup locations per load, and the minimum number of trucks the city must own. The City of Forty-Five collection data are as follows:

Average truck capacity = 12.5 m3; Average observed compaction ratio = 2.87

Crew size = 2;  Number of pickups = 1 /wk (no rear-of-house service)

Average number of cans per stop = 2.63/wk at 0.1136 m3/can

Average number of residents per stop = 5

Average uncompacted density = 105.76 kg/m3

Average transport time to disposal site including delays and dumping = 1.78 h/trip

Average number of trips to disposal site = 2/d; Rest breaks = 2 at 28.0 min

Average maintenance downtime = 37.0 min/d; Average workday = 8.00 h

Average percent of trucks out of service for major repairs = 15.0%

Number of workday per week = 5

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 8 images

Blurred answer
Knowledge Booster
Collection systems
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,