The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring vtime and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit. a. Formulate an LPmodel for this problem. b. Suppose that Electrotech's management decides that they need to make at least 20 generators and at least 20 alternators. Reformulate your LPmodel to account for this change.

Algebra & Trigonometry with Analytic Geometry
13th Edition
ISBN:9781133382119
Author:Swokowski
Publisher:Swokowski
Chapter9: Systems Of Equations And Inequalities
Section: Chapter Questions
Problem 8T
icon
Related questions
Question
i need the answer quickly
The Electrotech Corporation manufactures two
industrial-sized electrical devices: generators and
alternators. Both of these products require wiring
and testing during the assembly process. Each
generator requires 2 hours of wiring and 1 hour of
testing and can be sold for a $250 profit. Each
alternator requires 3 hours of wiring and 2 hours of
testing and can be sold for a $150 profit. There are
260 hours of wiring vtime and 140 hours of testing
time available in the next production period and
Electrotech wants to maximize profit.
a. Formulate an LPmodel for this problem.
b. Suppose that Electrotech's management
decides that they need to make at least 20
generators and at least 20 alternators.
Reformulate your LPmodel to account for this
change.
Transcribed Image Text:The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring vtime and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit. a. Formulate an LPmodel for this problem. b. Suppose that Electrotech's management decides that they need to make at least 20 generators and at least 20 alternators. Reformulate your LPmodel to account for this change.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Recommended textbooks for you
Algebra & Trigonometry with Analytic Geometry
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:
9781133382119
Author:
Swokowski
Publisher:
Cengage
College Algebra
College Algebra
Algebra
ISBN:
9781938168383
Author:
Jay Abramson
Publisher:
OpenStax