The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 3 hours of wiring and 2 hour of testing and can be sold for a $275 profit. Each alternator requires 3 hours of wiring and 3 hours of testing and can be sold for a $190 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit. 1. Formulate the LP model for this problem. 2. Create the spreadsheet model and use Solver to solve the problem.
The Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 3 hours of wiring and 2 hour of testing and can be sold for a $275 profit. Each alternator requires 3 hours of wiring and 3 hours of testing and can be sold for a $190 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit. 1. Formulate the LP model for this problem. 2. Create the spreadsheet model and use Solver to solve the problem.
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section: Chapter Questions
Problem 73P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 5 steps with 8 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,