The pavement that need to be constructed is a six-lane divided highway. The present AADT (both directions) of 6000 vehicles is expected to grow at 5% per annum. The percent of traffic on the design lane is 45%. Determine the design ESAL if the design life is 20 years and the vehicle mix is: Passenger cars (1000 lb/axle) 60% 2-axle single-unit trucks (5000 lb/axle) 30% 3-axle single-unit trucks (7000 lb/axle) 10% %3D
Q: Using IRC: 37 - 1984 "Guidelines for the Design of Flexible Pavements" and the following data,…
A: Given data- No of commercial vehicles when construction is completed-A=2723 veh/dayannual growth…
Q: Higher pavement thickness is required for: * O Larger carriageway width than the smaller…
A: The following requires higher pavement thickness:
Q: A six-lane divided highway is to be designed to replace an existing highway. The present AADT (both…
A: given data fd=design lane factor=45%AADT=6000SN=4pt=2.5design life=20year2 axle single unit…
Q: You have been asked to design the pavement for an access highway to a major truck terminal. The…
A: Given: Modulus of elasticity, EC=5 × 106 lb/in2 Modulus of rupture, S'c=600 ln/in2 Standard…
Q: A concrete pavement is to be constructed for a four-lane urban expressway on a subgrade with an…
A: Calculating design serviceability loss: Design serviceability loss=Initial serviceability…
Q: A lexible pavement is to be designed according to the AASHTO design method. The total expected ESAL…
A: Pavement is the subgrade of the structure which is very useful to transfer the load and also to give…
Q: Q2) The following results were obtained from testing a certain asphalt binder: Original Asphalt RTFO…
A: After analyzing the test results, the following conclusions were made,
Q: Answer the question based on the data given; SG bulk of the asphalt, 2.332 Theoretical maximum…
A: We will use formula for air voids.
Q: A 7-day average high temperature of the pavement at a ¾” depth is expected to be 138 degrees F (std.…
A: Pavement is a hard surface that's covered in concrete or asphalt, like a road or a driveway. If you…
Q: Q/ A flexible pavement was designed for the following daily traffic with a 12-year design life: 1300…
A: Solution; Given Data; D1=4 inch of HMA a1=0.44D2=4 inch of HMA a2=0.40D3=8 inch crushed stone…
Q: A pavement was designed to have 50 mm bituminous surface course, bituminous binder course 190 mm,…
A: Given, Bituminous surface course (BSC)=50 mm Bituminous binder course(BBC)=190 mm Crushed aggregate…
Q: An eight-lane divided highway is to be constructed on a new alignment. Traffic volume forecasts…
A: AADT in both directions = 20,000 Passenger Cars (1000lb/axle) = 40% 2- axle single unit trucks…
Q: B. A rigid pavement with a 10-inch slab thickness, 90 percent reliability, E. 4 million lb/in?, 600…
A: Given data - Slab thickness = 10inch Reliability = 90% Ec = 4 million lb/in2 Modulus of subgrade…
Q: Q2: Select one for each of the following: 1. Tire pressure affects the: a) pavement thickness b)…
A: 1. Answer:- quality of surface course (option b) Explaination:- Tire pressure affects the quality…
Q: a) You have to repair the wearing surface during wet weather using asphalt which can be used without…
A: Solution: Explanation:
Q: A 10-in. concrete pavement without concrete shoulders is placed on an untreated subbas e having the…
A: Given: Depth of concrete pavement, h = 10 in k value = 150 pci Number of applications of a given…
Q: If the pavement structure number (SN) is equal to 1 and the terminal serviceability index (TSI) is…
A: Given: Structure Number is 1. The terminal serviceability index is 2.5. The tandem axle load is…
Q: A flexible pavement is constructed with 4 inches of hot-mix asphalt wearing surface, 10 inches soil…
A: Given:- The depth of the hot-mix asphalt surface = D1 = 4 inch The depth of the soil cement base =…
Q: In specific gravity test, if D= 79g, B= 77g, C=75g, what is the unit weight of the used asphalt in…
A: It is required to determine the specific gravity. Gs=C-AB-A-D-C Here, A is the mass of pycnometer, B…
Q: 1- The wearing coarse of an asphalt pavement is compacted to density of 2.395gm/cm³ using 5.5…
A: VMA: VMA means Voids in Mineral Aggregate. It is defined as the void space between the mineral…
Q: A flexible pavement is constructed with 4 inches of hot-mix asphalt wearing surface, 10 inches soil…
A: Given data:- R=88%10 inches soil cement base, 10 inches crusshed stone rubbleResilance modulus=1200…
Q: A flexible pavement is constructed with 4 inches of hot-mix asphalt wearing surface, 10 inches soil…
A: Two methods of flexible pavement structural design are empirical design and mechanistic-empirical…
Q: An existing rural 4-lane highway is to be replaced by a 6-lane divided expressway (3 lanes in each…
A: Solution Since you have asked multiple questions, we will solve the first question for you. If…
Q: A flexible pavement is constructed with 4 inches of hot-mix asphalt wearing surface, 10 inches soil…
A: Two methods of flexible pavement structural design are empirical design and mechanistic-empirical…
Q: A six-lane divided highway is to be designed to replace an existing highway. The present AADT (both…
A: Given: 6 Lane divided highway. AADT = 6000 vehicles (2way directions) SN = 4 and pt = 2.5 Passenger…
Q: A flexible pavement is constructed with 3 inches of hot-mix asphalt (HMA) wearing surface, 6 inches…
A:
Q: The traffic on the design lane of a proposed four-lane rural interstate highway consists of 40…
A: AADT: AADT means Average Annual Daily Traffic. The average of the 24-hour volume of traffic is…
Q: 1. Discuss the structural components of a flexible pavement 2. A six lane divided highway is to be…
A: (Note - As per our Company Guidelines, We are supposed to answer only one question but first…
Q: A flexible pavement is constructed with 4 inches of hot-mix asphalt (HMA) wearing surface, 8 inches…
A: Given: Thickness of wearing surface = 4 inThickness of bituminous base = 8 inThickness of sub-base =…
Q: An existing rural 4-lane highway is to be replaced by a 6-lane divided expressway (3 lanes in each…
A: Calculating growth factor: Gm=1+rn-1rGm=1+0.03520-10.035Gm=28.28 Let's take pavement thickness 9in…
Q: Q7: 1. How can we achieve a good stability of asphaltic mixtures? 2. Differentiate between…
A: Note: Hi! Thank you for the question, As per the honour code, we are allowed to answer three…
Q: 4.3 A highway has the following pavement design daily traffic: 300 single axles at 10,000 lb each,…
A:
Q: 2. A flexible pavement is constructed with 3 inches of hot-mix asphalt (HMA) wearing surface, 6…
A: Answer We are given Thickness of hot mix asphalt wearing surface D1= 3 inch Thickness of emulsion/…
Q: Question 2 It is desired to design pavement layers of a 6. lanes principal arterial in a rural area…
A: Given data:- Thickness of HMA surface, D1 = 8 in Principle arterial in a rural area, R = 90% Design…
Q: B: The wearing course of asphalt is compacted to density of (2.395 gm/cm³). Using 5.5% asphalt…
A: Bulk specific gravity of mix (Gmb) = 2.395 Bulk specific gravity of aggregate (Gse) = 2.66Specific…
Q: Q14: A flexible pavement for a rural principal arterial highway is to be designed using the…
A: Solution
Q: A flexible pavement (SN = 4) is to be designed to last 14 years. The daily car traffic is 17,360,…
A: Given, Structural number= SN=4 Single unit truck: Daily truck traffic= 1212 8000 lb single…
Q: Q3: A flexible pavement is to be designed according to the AASHTO design method. The total expected…
A: American Association of State Highway and Transportation Official (AASHTO): It is a regression…
Q: A rigid pavement is designed with an 11-inch slab thickness, 90% Relliability (Zr = -1.282), Es = 4…
A: The given data is as follow: Thickness of slab=11 inchReliability=90%ZR=-1.282EC=4 million…
Q: 4.12 You have been asked to design the pavement for an access highway to a major truck terminal. The…
A:
Q: What will happen to the asphalt mixture if the selected bitumen content is too high or too low…
A: Answer - option d All of the above The strength, fatigue life, durability, ravelling, rutting,…
Q: Estimate the equivalent 18-kip single-axle load applications (ESAL) for a four-lane pavement (two…
A: Design life=20 years Equivalent axial load=18 kip Annual growth rate=5%
Q: A flexible pavement is constructed with 4 inches of hot-mix asphalt wearing surface, 10 inches soil…
A: Two methods of flexible pavement structural design are empirical design and mechanistic-empirical…
Q: A 10-in. concrete pavement without concrete shoulders is placed on an untreated subbas e having the…
A: Given values Concrete pavement depth(h)=10 in k=150 pci N=2 million=2×106
Q: by a 6-lane divided expressway (3 lanes in each direction). Traffic volume data on the highway…
A: We are asked to find the minimum depth of the concrete pavement, the below return formula is used to…
Q: A six-lane divided highway is to be designed to replace an existing highway. The present AADT (both…
A: The given values are: growth rate=5% per annum SN = 4 pt = 2.5 percent of traffic…
Q: B. A rigid pavement with a 10-inch slab thickness, 90 percent reliability, E, 4 million lb/in?, 600…
A:
Q: The traffic on the design lane of a proposed four-lane rural interstate highway consists of 40%…
A:
Q: An existing rural four-lane highway is to be replaced by a six-lane divided expressway (three lanes…
A: log10W18=ZRSo+7.35log10D+1-0.06+log10∆PSI31+1.624×107D+18.46…
Q: asphalt The wearing coarse of an asphalt pavement is compacted to density of 2.395gm/cm³…
A: Due to unavailability of math type i am providing Handwritten solution
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- An existing rural 4-lane highway is to be replaced by a 6-lane divided expressway (3 lanes in each direction). Traffic volume data on the highway indicate that the AADT (both directions) during the first year of operation is 24,000 with the following vehicle mix and axle loads. Passengercars=50percent 2-axle single-unit trucks (12,000lb/axle)=40percent 3-axle single-unit trucks (16,000lb/axle)=10percent The vehicle mix is expected to remain the same throughout the design life of 20 years, although traffic is expected to grow at a rate of 3.5 percent annually. Using the AASHTO design procedure, determine the minimum depth of concrete pavement required for the design period of 20 years. Pi=4.5J=3.2Pt=2.5Cd=1.0Sc=650lb/in.2So=0.3Ec=5106lb/in.2R=95k=130lb/in.3A six-lane divided highway is to be designed to replace an existing highway. The present AADT (both directions) of 6000 vehicles is expected to grow at 5% per annum. Assume SN = 4 and pt = 2.5. The percent of traffic on the design lane is 45%. The design life is 20 years and the vehicle mix is: Passenger cars (1000 lb/axle) = 60% 2-axle single-unit trucks (5000 lb/axle) = 30% 3-axle single-unit trucks (7000 lb/axle) = 10% Design a suitable pavement consisting of an asphalt mixture surface with an elastic modulus of 250,000 lb/in2, a granular base layer with a structural coefficient of 0.14 on a subgrade having a CBR of 10. Assume all mi values = 1. Use a reliability level of 85%, a standard deviation of 0.45, and a design serviceability loss of 2.0.The traffic on the design lane of a proposed four-lane rural interstate highway consists of 40 percent trucks. If classification studies have shown that the truck factor can be taken as 0.45, design a suitable flexible pavement if the Average Annual Daily Traffic (AADT) on the design lane during the first year of operation is 1000, initial serviceability (Po) = 4.4, and terminal serviceability (Pt) = 2.5. Growth rate = 4 percent Design life = 20 years Reliability level = 95 percent The pavement structure will be exposed to moisture levels approaching saturation 20 percent of the time, and will take about one week for drainage of water. California Bearing Ratio (CBR) of the subgrade material is 7. CBR of the base and subbase are 70 and 22 respectively, and Resilient Modulus (Mr) for asphalt concrete is 450,000 lb/in2.
- Problem No. 1A flexible pavement for an urban interstate highway is to be designed using the AASHTO method to carry a design ESAL of 3 x 106. It is estimated that it takes about a week for water to be drained from within the pavement and the pavement structure will be exposed to moisture levels approaching saturation for 30% of the time. The following additional information is available: Elastic modulus of asphalt concrete = 450,000 psiResilient modulus of base material = 35,000 psiResilient modulus of subbase material = 15,000 psiCBR of subgrade material = 8A flexible pavement is constructed with 4 inches of hot-mix asphalt wearing surface, 10 inches soil cement base and 10 inches crushed stone subbase. The subgrade has a soil resilient modulus of 12,000 lb/in2, M2 = 1.5 and M3=1.127 for the materials of the pavement structure. The overall standard deviation is 0.5, the initial PSI = 5.0 and the terminal serviceability index (TSI) is 2.5. The daily traffic has 3000 cars, 1000 trucks and 500 trailers. The axle weights are: How long in years would the pavement last if R = 98% ? (Final answer to 2 decimal places)A 10-in. concrete pavement without concrete shoulders is placed on an untreated subbas ehaving the k value 150 pci. Estimate the allowable corner deflection by the PCA erosio ncriterion if the pavement is subjected to 2 million applications of a given axle load .[Answer: 0 .0468 in . ]
- Q2: The traffic on the design lane of a proposed four-lane rural interstate highway consists of 40% trucks. If classification studies have shown that the truck factor can be taken as 0.45, design a suitable flexible pavement using the 1993 AASHTO procedure if the AADT on the design lane during the first year of operation is 1150, pi = 4.5, and pt = 2.5 . Growth rate = 3% Design life = 20 years Reliability level = 95% Standard deviation = 0.45 The pavement structure will be exposed to moisture levels approaching saturation 20% of the time, and it will take about one week for drainage of water. Effective CBR of the subgrade material is 7. CBR of the base and subbase are 70 and 22, respectively, and Mr for the asphalt mixture, 3102 MPa (450,000 lb/in2).Subject : Transportation Engineering Give me both a and b right solutions A 5 tonne wheel load is applied on a pavement and generates a surface deflection of 0.15 mm. (a) If the equivalent radius of tyre contact is 100 mm and Poisson’s ratio is 0.3, what is the pavement’s modulus of elasticity? (b) If the pavement is 125 mm thick, what is the vertical stress at the top of the subgrade?A dual wheel having a load per tire of 4000 Ib, 80 psi pressure and μ = 0.5. Calculate thetotal pavement deflections due to the dual wheel by two layer theory at the followingradial distances from the centerline of one tire: r=0, 7,14. Assume that E1 = 10 E2
- A pavement was designed to have 50 mm bituminous surface course, bituminous binder course 190 mm, 200 mm crushed aggregate road base, and 150 mm granular subbase. The designed was based on the number of ESALs for the base year is 1.4 million, design period is 20 years and average annual traffic growth factor is 4.5%. Using these data: Determine the Subgrade modulus design input value and Estimate the design traffic (ESAL DES).A dual wheel having a load per tire of 5000 Ib, 70 psi pressure and μ = 0.5. Calculate thetotal pavement deflections due to the dual wheel by one-layer theory at the followingradial distances from the centerline of one tire: r=0, 3.5,10.5. (Use Pavement Thickness= 8in).A six-lane divided highway is to be designed to replace an existing highway. The present AADT (both directions) of 6000 vehicles is expected to grow at 5% per annum. Assume SN =4 and pt = 2.5. The percent of traffic on the design lane is 45%. Determine the design ESAL if the design life is 20 years and the vehicle mix is: Passenger cars (1000 lb/axle) =60% 2-axle single-unit trucks (5000 lb/axle) =30% 3-axle single-unit trucks (7000 lb/axle) =10%