The traffic on the design lane of a proposed four-lane rural interstate highway consists of 40% trucks. If traffic classification studies have shown that the truck factor (average number of ESAL per truck) can be taken as 0.45. The AADT (average annual daily traffic) on the design lane during the first year of operation is projected to be 1000. Traffic growth rate annually = 4% Design life = 20 years Reliability level = 95% Standard deviation = 0.45 Design a three-layer flexible pavement using the 1993 AASHTO procedure. The pavement structure will be exposed to moisture levels approaching saturation 20% of the time and it will take about one week for drainage of water. Effective CBR of the subgrade material is 7. CBR of the base and subbase are 70 and 22, respectively. Elastic resilient modulus for the asphalt mixture is 450,000 lb/in². The initial and terminal PSI are p; = 4.2 and pt = 2.5.

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter13: Evaluating Transportation Alternatives
Section: Chapter Questions
Problem 24P
icon
Related questions
Question

Please explain this problem step by step so I can understand the concept well,. thank you!

The traffic on the design lane of a proposed four-lane rural interstate highway
consists of 40% trucks. If traffic classification studies have shown that the truck
factor (average number of ESAL per truck) can be taken as 0.45. The AADT
(average annual daily traffic) on the design lane during the first year of operation
is projected to be 1000.
Traffic growth rate annually = 4%
Design life = 20 years
Reliability level = 95%
Standard deviation = 0.45
Design a three-layer flexible pavement using the 1993 AASHTO procedure. The
pavement structure will be exposed to moisture levels approaching saturation
20% of the time and it will take about one week for drainage of water. Effective
CBR of the subgrade material is 7. CBR of the base and subbase are 70 and 22,
respectively. Elastic resilient modulus for the asphalt mixture is 450,000 lb/in².
The initial and terminal PSI are p₁ = 4.2 and pt = 2.5.
Transcribed Image Text:The traffic on the design lane of a proposed four-lane rural interstate highway consists of 40% trucks. If traffic classification studies have shown that the truck factor (average number of ESAL per truck) can be taken as 0.45. The AADT (average annual daily traffic) on the design lane during the first year of operation is projected to be 1000. Traffic growth rate annually = 4% Design life = 20 years Reliability level = 95% Standard deviation = 0.45 Design a three-layer flexible pavement using the 1993 AASHTO procedure. The pavement structure will be exposed to moisture levels approaching saturation 20% of the time and it will take about one week for drainage of water. Effective CBR of the subgrade material is 7. CBR of the base and subbase are 70 and 22, respectively. Elastic resilient modulus for the asphalt mixture is 450,000 lb/in². The initial and terminal PSI are p₁ = 4.2 and pt = 2.5.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Capacity and level of service at intersections
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning