What is the workstation cycle time? (Round your orkstation cycle time Balance this line using the longest task time. (Use O" wherever required.) Work Station 1 11 III IV seconds per unit Task Efficiency d. What is the efficiency of your line balance? (Use Idle Time (in seconds) %
Q: what do you learn from ERP, Leadership and business process.
A: Every business is implementing new technology to improve its working conditions. New technological…
Q: A company must perform a maintenance project consisting of seven activities. The activities, their…
A: Forward Pass:Early Start (ES) = Max EF value from immediate Predecessor(s)Early Finish (EF)= ES +…
Q: Chan purchased a new bedroom set for $4,000. The interest rate is 18%. Chan paid $540 in interest.…
A: There are many financing options, and one of them is getting the products on EMI. While the product…
Q: Part 1. Use the information provided in Table 1 to develop the project schedule in MS Project.…
A: The critical path method is a concept of operations management that is used to determine which tasks…
Q: It's important to outline and quickly explain the five methods available for mitigating risk.
A: Risk mitigation refers to the process of reducing, preventing, or eliminating the likelihood and/or…
Q: 94 To support National Heart Week, the Heart Assoclation plans to install a free blood pressure…
A: Queuing theory is one of the popular concepts of operations management that studies how queues…
Q: 2. Identity and explain the formula for the GDP? How has the GDP been impacted by the baby boom…
A: Gross Domestic Product (GDP) is a measure of the total economic output of a country over a specific…
Q: Which of the following best describes the last step to developing a master production schedule?…
A: Here, this MCQ question is centric towards the last step for creating an MPS or master production…
Q: Mario Armando Perez is the kitchen manager at the Asahi Sushi House. Mario’s restaurant offers five…
A:
Q: a. Calculate the mean and range for the above samples. Note: Round "Mean" to 2 decimal places and…
A: Range = Maximum sample value - Minimum sample valueMean = Average of readings in a sample only part…
Q: 52 Demand for an item is 3,800 units per year. Each order placed costs $15; the annual cost to…
A: The main aim of the company should be to decrease the cost incurred in its operations. The cost…
Q: True or False: The top position on a search engine results page (SERP) attracts the most attention…
A: To check: Whether the statement is true or false. Given: The statement is "The top position on a…
Q: Provide a summary of your understanding of the change management issues involved in the case
A: Planning, executing, and tracking changes within an organization in order to reach a desired result…
Q: Week Actual Forecast 20.2 29.6 31.5 47.2 51.9 67.6 58.0 63.2 5 60.2 71.7 6 84.5 93.9 7 76.3 89.9 8…
A: To use exponential smoothing to forecast the next period's demand, we use the formula: Forecast…
Q: AlwaysRain Irrigation, Incorporated would like to determine capacity requirements for the next four…
A: The number of resources, including personnel, machinery, space, and materials, required to supply…
Q: Lakeside Bakery bakes fresh pies every morning. The daily demand for its apple pies is a random…
A: Given, The cost of each apple pie is $6.75.The selling price is $ 37.99. Salvage value = 99 %
Q: How do the two fields of study diverge from one another? What are the similarities and differences…
A: Project management and software development are two distinct fields of study, but they are also…
Q: How are project management and software development distinct fields of study?
A: Project management and software development are distinct fields of study with different focuses and…
Q: AABCDE ZABCD Activity Predecessor None FGHI-KL EOFICIN Н J к с H с H J,I,K Draft PDS Identify team…
A: As per the given data, create the Network Diagram.
Q: THE PRISON SERVICE The prison service provides an excellent example of the complexity of…
A: Synopsis: The prison service faces a complex set of stakeholder requirements, including ensuring…
Q: Estimate a range for the optimal objective value for the following LPs: (a) Minimize z = 5x₁ + 2x₂…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: An analysis of the cost of operating a truck was conducted by accounting manager Diac Band. The…
A: given equation of cost forecast : y = 1600 + 0.11 X m y = annual cost m = miles driven
Q: Site the difference between contract and agreement. Does contract could be an agreement? does…
A: The terms "contract" and "agreement" are often used interchangeably, but there are some key…
Q: A business college graduate is considering opening a small, specialized trucking firm. To make the…
A: To find: (a) The optimal solution use only one type of truck (b) The optimal solution using minimum…
Q: The following table contains the demand from the last 10 months. MONTH 1 2 3 4 5 6 7 8 9 10 ACTUAL…
A: Exponential smoothing is a forecasting model which identifyi ng the forecasting value based on the…
Q: Shell Deutschland is processing crude oil in their refineries in Frankfurt and Berlin with a daily…
A: “Since you have posted a question with multiple sub parts, we will provide the solution only to the…
Q: A bill of material specifies all of the following except a. Lot size and lead time of each…
A: Here, I would explain the term "bill of material" then, I would identify a specific option which a…
Q: Affirmative action is a policy that can be helpful in some situations, but harmful in others if used…
A: Yes, affirmative action is complex and controversial policy that can have both positive and negative…
Q: Can you please solve this Q using slover for the option of having both Low capacity & high capacity.…
A: This is a case of transportation whereing we need to decide which of the plausible warehouses can be…
Q: what is the capacity utilization rate in October for this factory?
A: Capacity Utilization = (Actual Output/Maximum Possible Output) * 100
Q: Calculate the supplier score given the following parameters: Critieria Price Quality Dependability O…
A: Formulae used: Weighted score = Factor weight x Score
Q: Elliot & Hesse Inc. Manufactures ergonomic devices for computer users. Some of its more popular…
A: Keeping up with tight command over both fixed and variable costs is a fundamental piece of…
Q: Background information on Tesco in Japan and Asian markets
A: Introduction- Tesco Plc is a retail supermarket company from the united kingdom. Tesco's entrance…
Q: Here are the data for the past 21 months for actual sales of a particular product: January February…
A: Most Recent Quarter = 0.50 Second most recent Quarter = 0.25 Third most recent Quarter = 0.25
Q: Party LE3AE6780 1 2 4 5 Number in Party 3 W3WANNN 2 2 2 4 2 Arrival Time 7:00 7:02 7:05 7:10 7:12…
A: Queuing theory is one of the popular concepts of operations management that studies how queues…
Q: It's important to outline and quickly explain the five methods available for mitigating risk.
A: Risk mitigation refers to the process of reducing, preventing, or eliminating the likelihood and/or…
Q: A linear programming computer package is needed. Hilltop Coffee manufactures a coffee product by…
A: Linear Programming is a mathematical and statistical tool that is used in operations management to…
Q: Create a partial project schedule using a Gantt Chart (with a minimum of 10 tasks).
A:
Q: In the past, Alpha Corporation has not performed incoming quality control inspections but has taken…
A: Given- Acceptable Quality Level, (AQL) = 13% = 0.13Lot Tolerance Percent Defective (LTPD) = 38% =…
Q: What was its capacity utilization rate for the mont
A: Capacity Utilization = Actual Capacity used/Maximum Capacity Possible Actual Capacity used =…
Q: An operator that manufactures only two commodities, shirts and coats, the production manager wants…
A: Profit case: for maximum profit number of shirts = 10 coat = 0 or shirt = 8.33 and coat = 3.33…
Q: A vendor for the local ballpark food stand is questioning whether to stock his concession with a…
A: Find the Given details below: Given details: Profit Alternative Large Crowd Average Crowd…
Q: Develop a lot-for-lot solution and calculate total relevant costs for the gross requirements in the…
A: The demand measure of everything is called requirements, including the one, demanded as parts to…
Q: 8. ABC Inc. must make a decision on its current capacity for next year. Estimated profits (in $000s)…
A: Given-
Q: Find the five essential factors that need to be considered when formulating a policy for the…
A: Process scheduling can be defined as the process in project schedules in which the director handles…
Q: DM Office Products (DMOP) is a wholesale supplier of office products with one facility in…
A: The centroid method is a cluster analysis methodology to organize related objects or data points…
Q: The local supermarket buys lettuce each day to ensure really fresh produce. Each morning, any…
A: Cost of box = $7 Selling price per box = $18 Selling price of old product = $2 Average demand = 255…
Q: I 1. Use the priority list T1, T3, T4, T6, T2, T5, T8, T7 schedule the project below with two…
A:
Q: Given the data below, using the SPT heuristic sequencing rule, determine the completion date and…
A: Find the given details below: Given details: Job Processing time (Days) Due Date (Days) A 10…
Q: Week Actual Ft Tt FIT 1 29.0 42.1 8.67 50.77 2 33.0 47.2 8.57 55.77 3 48.0 63.3 9.77 73.07 4 50.0…
A: Formula used: Smoothed Forecast (Ft) = FITt-1+Alpha * (At-1 - FITt-1) Smoothed Trend (Tt)= Tt-1 +…
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- An assembly line is to operate eight hours per day with a desired output of 200 units per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME(SECONDS) IMMEDIATEPREDECESSOR A 60 — B 60 A C 50 A D 70 A E 30 B, C F 110 C, D G 70 E, F H 70 G b. What is the required workstation cycle time to meet the desired output rate? (Round your answer to the nearest whole number.) c. Balance this line using the longest task time. (Leave no cells blank - be certain to enter "0" wherever required.) d. What is the efficiency of your line balance, assuming it is running at the cycle time determined in part b? (Round your answer to 1 decimal place.)A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: Without regard to projected demand, what is the maximum possible cycle time for this assembly line? Task Time (secs) Immediate Predecessor a 3 none b 4 none c 5 a,b d 7 none e 9 c,dFrancis Johnson’s plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only four workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TASK TIME (MINUTES) IMMEDIATE PREDECESSOR A 1 — B 2 — C 3 — D 1 A, B, C E 3 C F 2 E G 3 E What is the workstation cycle time required to produce 15 units per hour? Note: Round your answer to 1 decimal place. Balance the line to use the fewest possible workstations to meet the cycle time found in part (b). Use whatever method you feel is appropriate. What is the efficiency of your line balance, assuming the line operates at the cycle time from part (b)? Note: Round your answer to 1 decimal place.
- An assembly line is to operate eight hours per day with a desired output of 240 units perday. The following table contains information on this product’s task times and precedencerelationships: Task Task Time (Seconds) Immediate Predecessor A 60 — B 80 A C 20 A D 50 A E 90…The desired daily output for an assembly line is 360 units. This assembly line will operate 450 minutes per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 30 — B 35 A C 30 A D 35 B E 15 C F 65 C G 40 E, F H 25 D, G What is the required workstation cycle time to meet the desired output rate? Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. Note: Leave no cells blank - be certain to enter "0" wherever required.Sue Helms Appliances wants to establish an assem-bly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks,task times, and immediate predecessors for producing one MicroPopcorn Popper are as follows:TASK TIME (min) IMMEDIATEPREDECESSORSA 10 —B 12 AC 8 A, BD 6 B, CE 6 CF 6 D, Ea) What is the theoretical minimum for the smallest number ofworkstations that Helms can achieve in this assembly line?b) Graph the assembly line, and assign workers to workstations.Can you assign them with the theoretical minimum?c) What is the efficiency of your assignment?
- An assembly line is to operate eight hours per day with a desired output of 250 units per day. The following table contains information on this product’s task times and precedence relationships: TASK TASK TIME (SECONDS) IMMEDIATE PREDECESSOR A 50 — B 20 A C 25 A D 35 A E 60 B, C F 60 C, D G 50 E, F H 90 G What is the required workstation cycle time to meet the desired output rate? Note: Round your answer to the nearest whole number. Balance this line using the longest task time. Note: Leave no cells blank - be certain to enter "0" wherever required. What is the efficiency of your line balance, assuming it is running at the cycle time determined in part b? Note: Round your answer to 1 decimal place.Sue Helms Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: Task Performance Time (mins) Task Must Follow Task Listed Below A 8 − B 11 A C 10 A, B D 9 B, C E 8 C F 4 D, E A C F B E D In the diagram, there are 6 circles labeled using the letters from A to F. There are 8 of arrows, and each arrow connects one circle to another circle. The arrows are situated in the following manner: A to B, A to C, B to C, C to D, B to D, C to E, D to F, and E to F. Part 2 a) The theoretical minimum number of workstations=55 (round your response up to the…The desired daily ouput for an assembly line is 420 units. This assembly line will operate 595 minutes per day. The following table contains information on the products task times and precedence relationships Task. Task time-seconds Immediate predecessor A. 35 - B. 40 A C 30 A D 40 B E 20 C F 70 C G 45 E-F H 30 D-G The required workstation cycle time to meet the desired output time is 85 seconds Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion The answer gives only 4 workstations as option Have to fill out following Workstation. Task Idle time 1 ?? ?? 2 ?? ?? 3…
- The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new product, Mint Chocolate Chip. The company plans to use this new production line eight hours a day in order to meet projected demand of 1,440 cases per day. The following table describes the tasks involved in the production of a case of Mint Chocolate Chip Cookies. 27 seconds 0.3333 seconds 18 seconds 14 seconds 56 seconds 20 secondsBalance the assembly line shown below for (a) a shift output of 60 pieces and (b) a shift output of 40 pieces. Assume an 8-hour shift, and use the rule: choose the assignable task with the longest processing time. Compute the line efficiency for each case. Fill in the table below for a shift output of 60 pieces. Break ties by choosing the lowest task number. If your answer is zero, enter "0". Round your answers to the nearest whole number. Workstation Tasks Total Time Idle Time 1 2 3 4 Total What is the assembly-line efficiency? Round your answer to one decimal place. % Fill in the table below for a shift output of 40 pieces. Break ties by choosing the lowest task number. If your answer is zero, enter "0". Round your answers to the nearest whole number. Workstation Tasks Total Time Idle Time 1 2 3 Total What is the assembly-line efficiency? Round your answer to one decimal place. %Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the Personal Digital Assistant (PDA). The tasks, task times, and immediate predecessors for the tasks are as follows: Task Time (sec) Immediate Predecessor A 11 − B 15 A C 7 A D 4 B, C E 20 D Rosenberg's goal is to produce 175 PDAs per hour. a) The cycle time for the production of a PDA = nothing seconds (round your response to two decimal places). B) what's the minimum number of workstations in the assembly line? C) Can the minimum actually be reached when workstations are assigned?