wheeled scraper is 5.9 minute: a. Calculate the number of pushers required to serve Calculate the production of the fleet in (BCY/h) if c b.

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 7RQ
icon
Related questions
Question
A fleet of 16 scrapers is available for a job and the plan is to use tandem pushers and the shuttle loading
method. If the expected production of a single scraper is 300 LCY/h and the expected cycle time for a
wheeled scraper is 5.9 minute:
a.
Calculate the number of pushers required to serve the fleet
b.
Calculate the production of the fleet in (BCY/h) if only 2 pushers are available. The soil has 15% Swell.
Transcribed Image Text:A fleet of 16 scrapers is available for a job and the plan is to use tandem pushers and the shuttle loading method. If the expected production of a single scraper is 300 LCY/h and the expected cycle time for a wheeled scraper is 5.9 minute: a. Calculate the number of pushers required to serve the fleet b. Calculate the production of the fleet in (BCY/h) if only 2 pushers are available. The soil has 15% Swell.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,