preview

Nt1310 Unit 2 Exercise 1

Satisfactory Essays

j. Before picking or pulling request is shall be initialed, IM must first provide the OMA with RFI request. OMA perform movement request as per SSP Navy ERP Handbook v1.0. The person doing the picking must ensure the material is picked at the right picking location. In case the material is not at the location as shown on the RFI, report inventory problem to IM and OMA respectively. k. If picked or pulled from another building, the material may be taken to Building 3210. Note the process does not change.

Get Access