preview

Property Address-290 Grotto Avenue Case Study

Decent Essays

Deb Zuckerman Property Address- 290 Grotto avenue Hi Deb it was a pleasure to meet you today and thank you for considering me as your new Handyman. I will treat your home as if it was mine, respectfully and with quality as the main priority. Here is an overview of the jobs we discussed. I always let my customers know I use the national cost average service online to price out jobs. As a handyman there are a few ways we usually price out jobs either by the hour or each task or sometimes by the day. In some cases with smaller items i like to bundle those into one day of work and charge you a day rate for those as alot of thinks are tough to put a specific number on. Because alot of what we have planned is paint and stain it doesnt make sense for me to …show more content…

Prep up to 3 hr per 100 SF - remove/mask hardware, scrape and sand door surface. Apply stain. Ready for clear coating. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. cost $75.00 Exterior Door Staining Job Supplies Cost of related materials and supplies typically required to stain exterior door including: masking tape and sand paper, surface repair and preparation material. Setup and cleanup supplies. cost $12.63 Customer providing stain 3) Closet door knob Labor, Basic Basic labor to repair interior door knob with favorable site conditions. repair hole Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. $35.00 4) Fence Staining Labor, Basic Basic labor to stain fence with favorable site conditions. Remove loose or peeling finish with light scraping . use bleach/water solution and light scrubbing for algea/mildew removal. Apply new stain/coating - 1 even coat, 2 if needed. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. cost

Get Access