1: When a wood stud wall is placed on concrete or 2: Fire Protection /Fire Rating of Door & Windows may masonry, the bottom plate must be a: o 2x4 wood o Metal runner o Stainless steel o Naturally durable wood be % lower than wall assembly: 75% 50% 100% o 0% 3: In Building Foundation Moisture control a Damp 4: How many plies (layers) of felt are in a Built-up Proofing layer: o Filters water vapors o Hold back standing water o Prevents the transmission of water vapor o Collects water vapors roof membrane. Each layer is separated by a mopping of bitumen. o Three to five plies o One to two plies Six to eight plies o Over eight plies

Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Alan Jefferis, David A. Madsen, David P. Madsen
Chapter28: Structural Components Of Framed Construction
Section: Chapter Questions
Problem 28.18Q
icon
Related questions
Question
show all answer. Thanks
1: When a wood stud wall is placed on concrete or | 2: Fire Protection /Fire Rating of Door & Windows may
masonry, the bottom plate must be a:
2x4 wood
Metal runner
Stainless steel
be
75%
50%
100%
0%
% lower than wall assembly:
Naturally durable wood
3: In Building Foundation Moisture control a Damp 4: How many plies (layers) of felt are in a Built-up
Proofing layer:
o Filters water vapors
Hold back standing water
Prevents the transmission of water vapor
Collects water vapors
roof membrane. Each layer is separated by a
mopping of bitumen.
Three to five plies
One to two plies
Six to eight plies
Over eight plies
o o o o
Transcribed Image Text:show all answer. Thanks 1: When a wood stud wall is placed on concrete or | 2: Fire Protection /Fire Rating of Door & Windows may masonry, the bottom plate must be a: 2x4 wood Metal runner Stainless steel be 75% 50% 100% 0% % lower than wall assembly: Naturally durable wood 3: In Building Foundation Moisture control a Damp 4: How many plies (layers) of felt are in a Built-up Proofing layer: o Filters water vapors Hold back standing water Prevents the transmission of water vapor Collects water vapors roof membrane. Each layer is separated by a mopping of bitumen. Three to five plies One to two plies Six to eight plies Over eight plies o o o o
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Asphalt binders and mixtures
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning