1. Find the maximum flow from node O to node T in the network below. show all your iterations (i.e., path and flow for each iteration). Path: Flow = Path: Flow = Path: Flow = Path: Flow = Path: Flow = Max-flow =
Q: Four workers are available to perform jobs 1-4. Unfortunately, three workers can do only certain…
A: Answer: For drawing the network for the the maximum-flow problem, we have the following information.…
Q: Suppose that an assembly line consists of four workstations. Workstation 1 involves one task that…
A: This question is related to topic-production management and this topic falls under the operations…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Cycle time is the actual total time incurred in manufacturing a product by the team members in an…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Given, Time par day- 8 hours Demand - 180 units/day
Q: The PERT and CPM approaches function by establishing the "critical route" for completing a set of…
A: ANSWER: TRUE IS THE CORRECT ANSWER.
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: Four workers are available to perform jobs 1–4.Unfortunately, three workers can do only certain…
A: Given data, Total Worker = 4 Job = 1-4 Worker 1 - job 1 Worker 2 - job 1 and 2 Worker 3 - Job 2…
Q: George is camped deep in the jungle, and he wants to make his way back to the coast and…
A: So we need to identify the critical path for George as from which he can reach at earliest possible…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: The entries in the table denote the costs of assigning a task to a particular person. The plant…
A: Here, I would apply the Hungarian method to this assignment problem, we could see the cost element…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Given table; Task Performance Time(Min) A 2.4 B 2.2 C 0.9 D 1 E 1.2 F…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Production time= 8*60= 480 minutes Demand= 100 units Cycle time= production time/ demand= 480/100=…
Q: There are six jobs as below. The processing time (in days) and due date for each job are below. Job…
A: Business operation requires efficient planning and coordination among other different present…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A:
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Given table; Task Performance Time(Min) A 2.8 B 2.1 C 0.9 D 1 E 1.2 F 1.8 G 4.7…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A:
Q: The Earliest Due date (EDD) rule for sequencing a given set of jobs usually ____________ Select…
A: Scheduling is a technique for allocating precious computational resources typically processor time,…
Q: Your team has been assigned to complete 10 client projects over the next two months. These projects…
A: Find the Given details below: Given Details: Project # Processing Time (days) Due date 1 6 17…
Q: laid out below: A B C D E F Use rectilinear travel costs for the cost of going from one department…
A: The following numbers of trips are made between departments per week: A-B (10), A-C (20), B-E (10),…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Given data is Demand = 80units/day Working hours = 8
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Assembly line balancing is the process of assigning each task to a workstation in order to meet the…
Q: A merchant wants to cut a group of pieces of cloth, each of more than 5 meters long, into small…
A: A map of operations is the visual description of the workflow of a project which describes the…
Q: The precedence diagramming method (PDM) is a network diagramming technique in which boxes represent…
A: The precedence diagram method, broadly referred to as PDM is defined as a technique that represented…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Find the Given details below: Given details: Task Immediate Predecessors Time(mins) A - 2.4…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: The flow diagram for the product is shown below.
Q: In a school, there are four teachers X1,X2,X3,X4 and five batches Y1,Y2,Y3,Y4,Y5. Given that teacher…
A: The given question is of an unbalanced minimization problem of assignment. In order to slove the…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Production time= 8*60= 480 minutes Demand= 110 units Cycle time= production time/ demand = 480/110 =…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: The detailed solution is given in Step 2.
Q: Five sorority sisters plan to attend a social function. Each requires hair styling andfitting for a…
A: The schedule of the work of five people is used for minimizing the total expected time required for…
Q: What is the shortest path and what is the shortest possible time to travel from A to Z? (Round yo…
A: Below is the solution:-
Q: Consider the main version of the shortest-path problem?
A: Shortest path problem means to find the best suitable path among all path which helps in less time…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Machine Idleness is the time frame during which a machine isn't being utilized. This is comparative…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: To utilize the product layout, the complete work to be performed should be dividable into little…
Q: How many minimum numbers of workstations are needed? a. 1 b. 6 c. None is correct d. 3 e. 5
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: Modify the machine-to-job assignment model under the assumption that only three of the four jobs…
A: When we talk about the term jobs in business, it meant small tasks listed under big departments and…
Q: A manufacturer is designing a product layout for a new product productionIt plans to use a…
A: The cycle time is the amount of time it carries to achieve a specific task from start to finish. You…
Q: Six jobs are to be processed through a two-step operation. The first operation involves sanding, and…
A: In operations, Johnson's rule is a technique of scheduling jobs in two work centers. Its primary…
Q: What is the shortest path and what is the shortest possible time to travel from A to Z? (Round your…
A: A network diagram is the graphical representation of activities with their duration to complete the…
Q: simple and explicit enough and must be typed with the use of a computer keyboard only!
A: Providing the answers with an explanation as is why the particular option is correct.
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Given information Task Time A 2.8 B 2.1 C 0.9 D 1 E 1.2 F 1.8 G 4.7 Task…
Q: For the network illustrated below. 1) Calculate the total inflows (arrival) rates for each…
A: For the network provided:
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Given table; Task Performance Time(Min) A 2.4 B 2.2 C 0.9 D 1 E 1.2 F 1.8 G 1.5…
Q: A manufacturer is designing a product layout for a new product production. It plans to use a…
A: Find the Given details below: Given details: Task Immediate Predecessors Time(mins) A - 2.4…
Q: Amanufacturer is designing a product layout for a new product production. It plans to use a…
A: A demand forecast refers to when historical data and other information get employed for making…
Q: A group of six jobs is to be processed through a two-machine flow shop. The first operation involves…
A:
Q: 5. How do you define an algorithm? Why đo we use algorithms? you give example to a scenario, where…
A: An algorithm is a succession of instructions to perform a specific operation. It may be a simple…
Q: I am looking to solve Part B. I solved Part A with Bartelby earlier.
A: Below is the solution:-
Step by step
Solved in 3 steps with 4 images
- A manufacturer is designing a product layout for a new product productionIt plans to use a production line for 8 hours per day in order to meet forecasted demand of 70 units per day. The product requires 7 tasks in total. These tasks are namelyABC, D, E, F, and Grespectively. Task A does not have any predecessor to startTo start Task B.it requires Task A to be completedStarting tasks needs, the task B to be completed. Also, starting task Dneeded task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed task Fto be completed. The processing times for tasks, ABC, D. E. and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8 and 4.7 minutes respectively. What should be the cycle time in minutes? a 4.7 b. None is the correct answer Oc 7.5 d6.86 e.A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 80 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and Gare 2.8, 2.1,0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. How many minimum numbers of workstations are needed? Select one: a. None is the correct answer b. 5 C. 6 d. 3 e. 1FILE UPLOAD: Draw a flowchart for customers fueling their cars at a gas station, starting with the customer exiting their car to refuel, and ending with the customer leaving the fueling station. Upload your flowchart as a file to answer this question. Include at least one decision block in your flowchart and at least 4 distinct activities. You can use any means to construct the flowchart (software, by hand, etc.). Remember to save your file in case you want to re-take the assignment.
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 150 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.4, 2.2,0.9, 1.0, 1.2, 1.8, are 1.5 minutes respectively. How many minimum numbers of workstations are needed? Round-up to the nearest integer а. 8 b. 4 С. 6 O d. 5 O e. None is the correct answerA manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 150 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting taskD needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.3, 2.1,0.9, 1.0, 1.2, 1.8, and 1.5 minutes respectively. Applying the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first. What will be the idle time for the LAST Workstation? O a. 1.7 O b. None is the…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 80 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. What should be the (calculated) cycle time in minutes? Select one: Oa. 4.5 Ob. 0.9 Oc. None is the correct answer O d. 6.0 Oe. 4.4 Next pa nd Windows
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 70 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and Gare 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. How many minimum numbers of workstations are needed? O a. 2 O b. 1 O c. None is the correct answer O d. 4 O e. 3.A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 70 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, and 4.7 minutes respectively. What should be the cycle time in minutes? O a. 7.5 O b. 4.4 c. None is the correct answer O d. 6.86 O e. 4.7A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 100 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1,0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. What should be the (calculated) cycle time in minutes? O a. 4.8 Ob. 4.4 None is the correct answer O d. 0.9 O e. 4.5
- A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 100 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. Applying the most following tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the SECOND workstation are Select one: Oa. B and…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 100 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. Applying the most following tasks rule for balancing the assembly line with ties broken according to longest task time first, the tasks that will be assigned to the SECOND workstation are: a. B,C and D b. C…A manufacturer is designing a product layout for a new product production. It plans to use a production line for 8 hours per day in order to meet forecasted demand of 100 units per day. The product requires 7 tasks in total. These tasks are namely, A, B, C, D, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed. Starting tasks C needs, the task B to be completed. Also, starting task D needed task B to be completed. Task E can only start upon completion of Task C. Whereas starting task F needs the completion of both the tasks D and E. Finally, starting task G needed, task F to be completed. The processing times for tasks, A, B, C, D, E, F, and G are 2.8, 2.1, 0.9, 1.0, 1.2, 1.8, and 4.7 minutes respectively. How many minimum numbers of workstations are needed? O a. 6 O b. None is the correct answer O c. 8 O d. 2 O e. 4