12.a. For performing dielectric-strength tests on insulating materials, two transformers are connected in a A. parallel combination. B. series combination. C. polyphase arrangement. D. cascade arrangement.

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter3: Power Transformers
Section: Chapter Questions
Problem 3.11MCQ: For a short-circuit test on a 2-winding transformer, with one winding shorted, can you apply the...
icon
Related questions
Question

12.a. For performing dielectric-strength tests on insulating materials, two transformers are connected in a
A. parallel combination.
B. series combination.
C. polyphase arrangement.
D. cascade arrangement.
12.b. A demountable stud bushing on high-voltage leads eliminates the need for
A. a gasket.
B. an oil stop.
C. a terminal lug.
D. a porcelain bushing.

Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning