15. The following activities and times (in minutes) were recorded for a mold operator: I Removes molded piece from die I Walks 10 ft to a workbench I Boxes widget and places on conveyor I Walks back to molder I Blows out dirt from mold 1 Sprays oil into mold, pushes “GO" 0.6 0.2 1.0 0.2 0.4 0.2 Mold cycles automatically 3.0 The cycle then repeats itself. The operator is paid $10.00/h, and it costs $15.00/h to run the molder. What is the optimum number of machines that can be assigned to the operator to produce the widgets at lowest cost? Draw a worker-machine chart.
15. The following activities and times (in minutes) were recorded for a mold operator: I Removes molded piece from die I Walks 10 ft to a workbench I Boxes widget and places on conveyor I Walks back to molder I Blows out dirt from mold 1 Sprays oil into mold, pushes “GO" 0.6 0.2 1.0 0.2 0.4 0.2 Mold cycles automatically 3.0 The cycle then repeats itself. The operator is paid $10.00/h, and it costs $15.00/h to run the molder. What is the optimum number of machines that can be assigned to the operator to produce the widgets at lowest cost? Draw a worker-machine chart.
Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter5: Separation Processes
Section: Chapter Questions
Problem 5.19P
Related questions
Question
Please help to solve and provide steps to solving.
Expert Solution
Step 1
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,