1. There are four sizes based on the speed of the facility for regulatory signs, choose the wrong statement. a. D for expressways b. B for rural roads with speed limits between 60 kph and 70 kph c. A for urban low-speed road d. C for high-speed urban highways

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter3: Characteristics Of The Driver, The Pedestrian, The Bicyclist, The Vehicle, and The Road
Section: Chapter Questions
Problem 7P
icon
Related questions
Question

1. There are four sizes based on the speed of the facility for regulatory signs, choose the wrong statement.

a. D for expressways

b. B for rural roads with speed limits between 60 kph and 70 kph

c. A for urban low-speed road

d. C for high-speed urban highways

 

2.  A form of hydropower that converts the energy of tides into electricity.

a. Geothermal Energy

b. Tidal Energy

c. Solar Energy

d. Wind Energy

 

3.  A mixture of hydrocarbons like alkanes and cycloalkanes.

a. Petroleum and Natural Gas

b. Coal

c. Biomass

d. Fuel

 

4. This energy generally involves low running costs since it saves 80% on fossil fuels.

a. Geothermal Energy

b. Tidal Energy

c. Solar Energy

d. Wind Energy

 

5. Destruction of the Earth’s surface caused by human activities and the misuse of natural resources.

a. Land pollution

b. Non-renewable resource

c. Renewable resource

d. Natural resources

 

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Geothermal energy
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning